Filter interviews by
I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 4 interview rounds.
To switch in mould design while in the standard room, you need to have a good understanding of the current mould design, analyze the requirements for the new design, make necessary adjustments, and ensure quality standards are met.
Understand the current mould design specifications and requirements
Analyze the requirements for the new mould design
Make necessary adjustments to the design based on analysis
Ensure that the n...
Top trending discussions
posted on 18 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
posted on 3 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
posted on 28 Jan 2025
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Production targets are set goals for the quantity and quality of products to be produced within a specific timeframe.
Production targets are typically set based on market demand, available resources, and production capacity.
Targets should be realistic, achievable, and aligned with overall business objectives.
Regular monitoring and adjustment of targets may be necessary to ensure optimal production efficiency.
Examples: S...
What is the Zeto rule of the company?
posted on 13 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.
posted on 25 Oct 2024
posted on 20 Sep 2024
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
Kleanchute installation involves implementing waste disposal systems in residential apartments.
Consider the layout and size of the apartments to determine the best placement for Kleanchutes.
Ensure proper ventilation and safety measures are in place during installation.
Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.
A siphonic drainage system is a type of drainage system that uses the siphonic action to quickly remove large volumes of water from a building or area.
Utilizes the siphonic action to create a vacuum and rapidly drain water
Ideal for areas with high rainfall or where large volumes of water need to be removed quickly
Requires fewer and smaller pipes compared to traditional drainage systems
Commonly used in commercial buildi
posted on 25 Oct 2024
based on 1 interview
Interview experience
based on 21 reviews
Rating in categories
Production Engineer
8
salaries
| ₹2 L/yr - ₹3.4 L/yr |
Quality Engineer
4
salaries
| ₹2 L/yr - ₹3.6 L/yr |
QA Engineer
4
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
QC Inspector
4
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Maintenance Engineer
3
salaries
| ₹3 L/yr - ₹3.2 L/yr |
Supreme Industries
Time Technoplast
Sintex Plastics Technology
Nilkamal