Upload Button Icon Add office photos

Filter interviews by

Apex Plastics Interview Questions and Answers

Updated 18 Jul 2020

Apex Plastics Interview Experiences

1 interview found

standard room incharge - quality Interview Questions & Answers

user image Anonymous

posted on 18 Jul 2020

I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How i switch in mould design i am in standard room.?
  • Ans. 

    To switch in mould design while in the standard room, you need to have a good understanding of the current mould design, analyze the requirements for the new design, make necessary adjustments, and ensure quality standards are met.

    • Understand the current mould design specifications and requirements

    • Analyze the requirements for the new mould design

    • Make necessary adjustments to the design based on analysis

    • Ensure that the n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare question about measuring instrument and drawing related questions. Little bit about your last company work responsibilites that you write in your resume.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. They asked to tell about ourselves and then why did you skipped that previous job?
Round 2 - Technical 

(2 Questions)

  • Q1. Shoot the questions about Injection Moulding and Paint Shop as well I have been worked before..
  • Q2. Ask about the QMS, IATF and SQ Mark

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask questions with regarding with his/her previous work experience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basic instrumentation questions
  • Q2. Plc , scada
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is your knowledge regarding the infrastructure of System Center Configuration Manager (SCCM) and Microsoft Intune?
Round 2 - HR 

(1 Question)

  • Q1. How flexible are you regarding your work schedule?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Production targets
  • Ans. 

    Production targets are set goals for the quantity and quality of products to be produced within a specific timeframe.

    • Production targets are typically set based on market demand, available resources, and production capacity.

    • Targets should be realistic, achievable, and aligned with overall business objectives.

    • Regular monitoring and adjustment of targets may be necessary to ensure optimal production efficiency.

    • Examples: S...

  • Answered by AI
  • Q2. Quality products
  • Q3. Empty tube making

Interview Preparation Tips

Interview preparation tips for other job seekers - Production targets and goals quality products is good making in tha machine
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

What is the Zeto rule of the company?

Round 2 - One-on-one 

(1 Question)

  • Q1. What was your last job profile?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Very 

(1 Question)

  • Q1. Qualification ITI ,B.A
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. General discussion
Round 2 - One-on-one 

(2 Questions)

  • Q1. About my work experience
  • Q2. About past employer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Kleanchute installation across residential apartments
  • Ans. 

    Kleanchute installation involves implementing waste disposal systems in residential apartments.

    • Consider the layout and size of the apartments to determine the best placement for Kleanchutes.

    • Ensure proper ventilation and safety measures are in place during installation.

    • Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.

  • Answered by AI
  • Q2. Siphonic drainage system
  • Ans. 

    A siphonic drainage system is a type of drainage system that uses the siphonic action to quickly remove large volumes of water from a building or area.

    • Utilizes the siphonic action to create a vacuum and rapidly drain water

    • Ideal for areas with high rainfall or where large volumes of water need to be removed quickly

    • Requires fewer and smaller pipes compared to traditional drainage systems

    • Commonly used in commercial buildi

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why u want to change
  • Q2. Why this salary

Interview Preparation Tips

Interview preparation tips for other job seekers - never join

Tell us how to improve this page.

Apex Plastics Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Uflex Interview Questions
3.8
 • 105 Interviews
Nilkamal Interview Questions
3.9
 • 54 Interviews
Cosmo Films Interview Questions
3.7
 • 33 Interviews
EPL Limited Interview Questions
4.0
 • 22 Interviews
Polyplex Interview Questions
4.3
 • 7 Interviews
View all

Apex Plastics Reviews and Ratings

based on 21 reviews

2.8/5

Rating in categories

3.1

Skill development

2.5

Work-life balance

2.6

Salary

2.2

Job security

2.1

Company culture

1.9

Promotions

2.5

Work satisfaction

Explore 21 Reviews and Ratings
Production Engineer
8 salaries
unlock blur

₹2 L/yr - ₹3.4 L/yr

Quality Engineer
4 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

QA Engineer
4 salaries
unlock blur

₹2.4 L/yr - ₹3.6 L/yr

QC Inspector
4 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Maintenance Engineer
3 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Apex Plastics with

Supreme Industries

4.1
Compare

Time Technoplast

3.8
Compare

Sintex Plastics Technology

1.9
Compare

Nilkamal

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview