Upload Button Icon Add office photos

Filter interviews by

apex construction Interview Questions and Answers for Experienced

Updated 27 Aug 2024
Popular Designations

6 Interview questions

A Civil Site Engineer was asked
Q. Under what conditions would you use a pile foundation?
Ans. 

Pile foundations are used in conditions where the soil is weak or unstable to support the structure.

  • Pile foundations are used when the soil is too weak to support the load of the structure.

  • They are also used in areas with expansive soils that can cause excessive settlement.

  • Pile foundations are suitable for sites with high water tables or in coastal areas where the soil is prone to erosion.

  • They are commonly used in...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. How do you calculate the weight of steel in feet?
Ans. 

The weight of steel in feet can be calculated by multiplying the volume of steel by its density.

  • Calculate the volume of steel by multiplying its length, width, and height

  • Determine the density of the steel material being used

  • Multiply the volume by the density to obtain the weight of steel in pounds

  • Convert the weight from pounds to feet if necessary

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. How many cubic feet and cubic meters are in one bag of cement?
Ans. 

One bag of cement is approximately equal to 1.25 cubic feet or 0.035 cubic meters.

  • One bag of cement typically contains 50 kilograms of cement.

  • The volume of one bag of cement is influenced by the density of the cement.

  • To convert cubic feet to cubic meters, divide the value by 35.3147.

  • To convert cubic meters to cubic feet, multiply the value by 35.3147.

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. What is the tread size, riser height, and angle of stairs?
Ans. 

The size of trade and rise and angle of stairs vary depending on the specific design and regulations.

  • The size of trade refers to the horizontal distance between two consecutive steps.

  • The rise is the vertical distance between two consecutive steps.

  • The angle of stairs is determined by the ratio of rise to trade.

  • Building codes and regulations provide guidelines for the minimum and maximum values for trade, rise, and ...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. What is the minimum thickness of a slab?
Ans. 

The minimum thickness of a slab depends on various factors such as the load it will bear, the type of material used, and the span of the slab.

  • The minimum thickness of a slab is typically determined by structural engineers based on the design requirements and local building codes.

  • For residential buildings, the minimum thickness of a concrete slab is often around 4 inches (10 cm).

  • For commercial or industrial buildin...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked 10mo ago
Q. Subgrade gsb work
Ans. 

Subgrade GSB work refers to the process of preparing the subgrade by laying Granular Sub Base material.

  • Subgrade GSB work involves laying and compacting Granular Sub Base material to create a stable foundation for the road or structure.

  • The thickness of GSB layer and compaction requirements are specified in the project specifications.

  • Proper compaction is essential to achieve the desired strength and stability of the...

View all Civil Site Engineer interview questions

apex construction Interview Experiences for Experienced

3 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(12 Questions)

  • Q1. Subgrade gsb work
  • Ans. 

    Subgrade GSB work refers to the process of preparing the subgrade by laying Granular Sub Base material.

    • Subgrade GSB work involves laying and compacting Granular Sub Base material to create a stable foundation for the road or structure.

    • The thickness of GSB layer and compaction requirements are specified in the project specifications.

    • Proper compaction is essential to achieve the desired strength and stability of the subg...

  • Answered by AI
  • Q2. Wmm DBM BC
  • Q3. Sad and opustive Measurement
  • Q4. Sab great 2 layers
  • Ans. 

    The question is likely asking about the properties or characteristics of two specific layers in a civil engineering context.

    • Identify the specific layers being referred to in the question

    • Discuss the properties, materials, or functions of each layer

    • Explain any interactions or considerations between the two layers

    • Provide examples of common layer combinations in civil engineering projects

  • Answered by AI
  • Q5. Gsb 2 layer 125 plus 125 mm total 250 mm top player
  • Q6. Wmm 125 plus 125 mm total 250 mm top player
  • Q7. DBM 400 se 500 mm design ke upar hai
  • Q8. BC top layer complete
  • Q9. Welding work upar top Lesnar
  • Q10. Basement Se Lekar ke upar top
  • Q11. Steel level concrete level
  • Q12. Basement Se Lekar 14 second floor

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil engineer highway welding work pipeline work railway line work

Road Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Aug 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Road amendment of sub Sab great talk
  • Ans. 

    The question is likely asking about the process of amending roads in a specific area known as 'sub Sab'.

    • Road amendment involves making changes or improvements to existing roads.

    • Sub Sab likely refers to a specific location or area that requires road amendments.

    • Great talk could indicate a positive discussion or plan for the road amendment project.

  • Answered by AI
  • Q2. JSP first JSP second
  • Q3. Road work inexperience
  • Q4. DBM work experience
  • Ans. 

    I have 5 years of experience in DBM work, including road construction and maintenance.

    • Managed DBM projects from planning to execution

    • Performed quality control checks on DBM materials

    • Collaborated with engineers and contractors to ensure project deadlines were met

  • Answered by AI
  • Q5. BC work ine experience
  • Ans. 

    BC work ine experience refers to experience in working with British Columbia road infrastructure projects.

    • Experience working on road projects in British Columbia

    • Knowledge of BC road construction standards and regulations

    • Familiarity with BC road maintenance practices

    • Ability to collaborate with BC government agencies and stakeholders

  • Answered by AI

I applied via Other and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Minimums thickness of slab
  • Ans. 

    The minimum thickness of a slab depends on various factors such as the load it will bear, the type of material used, and the span of the slab.

    • The minimum thickness of a slab is typically determined by structural engineers based on the design requirements and local building codes.

    • For residential buildings, the minimum thickness of a concrete slab is often around 4 inches (10 cm).

    • For commercial or industrial buildings, t...

  • Answered by AI
  • Q2. What is the size of trade and raise and angle of stairs
  • Ans. 

    The size of trade and rise and angle of stairs vary depending on the specific design and regulations.

    • The size of trade refers to the horizontal distance between two consecutive steps.

    • The rise is the vertical distance between two consecutive steps.

    • The angle of stairs is determined by the ratio of rise to trade.

    • Building codes and regulations provide guidelines for the minimum and maximum values for trade, rise, and angle...

  • Answered by AI
  • Q3. How to calculat weight of steel in feet
  • Ans. 

    The weight of steel in feet can be calculated by multiplying the volume of steel by its density.

    • Calculate the volume of steel by multiplying its length, width, and height

    • Determine the density of the steel material being used

    • Multiply the volume by the density to obtain the weight of steel in pounds

    • Convert the weight from pounds to feet if necessary

  • Answered by AI
  • Q4. In which condition pile foundation will do.
  • Ans. 

    Pile foundations are used in conditions where the soil is weak or unstable to support the structure.

    • Pile foundations are used when the soil is too weak to support the load of the structure.

    • They are also used in areas with expansive soils that can cause excessive settlement.

    • Pile foundations are suitable for sites with high water tables or in coastal areas where the soil is prone to erosion.

    • They are commonly used in area...

  • Answered by AI
  • Q5. In One bag of cement how many cubit feet and cubic meter
  • Ans. 

    One bag of cement is approximately equal to 1.25 cubic feet or 0.035 cubic meters.

    • One bag of cement typically contains 50 kilograms of cement.

    • The volume of one bag of cement is influenced by the density of the cement.

    • To convert cubic feet to cubic meters, divide the value by 35.3147.

    • To convert cubic meters to cubic feet, multiply the value by 35.3147.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Firstly you will ask basic.. If boy have basic knowledge she / he can handle the site of construction

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about apex construction?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Contraction lebal questions
  • Q2. Jenral questions
  • Q3. Atitude prasnalty

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your homework
Practice (out loud)
Share your story
Provide Evidence and data
Mirror the interviewers style
Prepare a few questions
Ask if they have any hesitation
Say thanks.

I applied via Campus Placement and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Group Discussion 

General knowledge

Round 2 - Technical 

(2 Questions)

  • Q1. About civil engineering
  • Q2. General knowledge Civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - My self Srikant Mallik
I'm studying BTech engeneering
& Complete my diploma
I'm a good student

I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the curing on site engineering
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete to promote its hydration and strength gain.

    • Curing is essential for the strength and durability of concrete.

    • It involves keeping the concrete moist and at a proper temperature for a specific period of time.

    • Curing can be done using various methods such as water curing, membrane curing, and steam curing.

    • The duration of curi...

  • Answered by AI
  • Q2. What is the strength of cement
  • Ans. 

    The strength of cement depends on its grade and type.

    • The strength of cement is measured in terms of compressive strength.

    • The grade of cement determines its strength. Higher the grade, higher the strength.

    • Type of cement also affects its strength. For example, Portland cement has higher strength than lime cement.

    • The strength of cement is also influenced by factors such as curing time, temperature, and humidity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I intrest to do a job in your company ,I hope have
a capability to do a job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Fair and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

In general, aptitude tests measure ones competence in logical reasoning, numerical skills, or verbal ability.

Round 2 - Technical 

(5 Questions)

  • Q1. What is the technical in my site ?
  • Q2. What about this company ?
  • Q3. What about my empolys ?
  • Q4. In many cases what will be approch in this technical issus ?
  • Ans. 

    The approach to technical issues in civil engineering often involves analyzing the problem, considering various solutions, and selecting the most feasible option.

    • Identify the technical issue and its impact on the project

    • Analyze the possible solutions and their pros and cons

    • Consider factors such as cost, time, and resources

    • Consult with team members or experts for input

    • Select the most feasible solution and implement it

    • Mo...

  • Answered by AI
  • Q5. What is the technical ?

Interview Preparation Tips

Interview preparation tips for other job seekers - i want this job for i will raduse my skill development and i wiil done my job regulry not a skip my company
Are these interview questions helpful?

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What are the activities that you have performed?
  • Q2. Some important journal entries

Interview Preparation Tips

Interview preparation tips for other job seekers - I would advice to be more confident on subject amd have a crisp cv which actually shows what you have done in your last company. After walkin, it is your cv which would create an impression of yours because in walkin, it is difficult to remember the candidate. I got call after 1 month and it was all because they liked my cv.
Be confident and practice all what you have done.

I appeared for an interview in Dec 2020.

Round 1 - Coding Test 

(1 Question)

Round duration - 40 minutes
Round difficulty - Easy

  • Q1. 

    Count Subsequences Problem Statement

    Given an integer array ARR of size N, your task is to find the total number of subsequences in which all elements are equal.

    Explanation:

    A subsequence of an array i...

  • Ans. 

    Count the total number of subsequences in which all elements are equal in an integer array.

    • Iterate through the array and count the frequency of each element.

    • Calculate the total number of subsequences for each element using the formula (frequency * (frequency + 1) / 2).

    • Sum up the total number of subsequences for all elements and return the result modulo 10^9 + 7.

  • Answered by AI

Interview Preparation Tips

Eligibility criteriaNoWipro Limited interview preparation:Topics to prepare for the interview - Data Structures, Pointers, OOPS, System Design, Algorithms, Dynamic ProgrammingTime required to prepare for the interview - 4 monthsInterview preparation tips for other job seekers

Tip 1 : Do practice as much as you can
Tip 2 : Coding is key to crack

Application resume tips for other job seekers

Tip 1 : It should look nice
Tip 2 : Skills should be mentioned properly

Final outcome of the interviewRejected

Skills evaluated in this interview

I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to change the process

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview panel is good but working with manger is not

apex construction Interview FAQs

How many rounds are there in apex construction interview for experienced candidates?
apex construction interview process for experienced candidates usually has 1 rounds. The most common rounds in the apex construction interview process for experienced candidates are HR.
How to prepare for apex construction interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at apex construction. The most common topics and skills that interviewers at apex construction expect are AutoCAD, Civil Engineering, Client Billing, MS Office and Project Management.
What are the top questions asked in apex construction interview for experienced candidates?

Some of the top questions asked at the apex construction interview for experienced candidates -

  1. In One bag of cement how many cubit feet and cubic me...read more
  2. What is the size of trade and raise and angle of sta...read more
  3. In which condition pile foundation will d...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 2 interview experiences

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.6
 • 11.1k Interviews
Accenture Interview Questions
3.8
 • 8.6k Interviews
Infosys Interview Questions
3.6
 • 7.9k Interviews
Wipro Interview Questions
3.7
 • 6.1k Interviews
Cognizant Interview Questions
3.7
 • 5.9k Interviews
Amazon Interview Questions
4.0
 • 5.4k Interviews
Capgemini Interview Questions
3.7
 • 5.1k Interviews
Tech Mahindra Interview Questions
3.5
 • 4.1k Interviews
HCLTech Interview Questions
3.5
 • 4.1k Interviews
Genpact Interview Questions
3.8
 • 3.4k Interviews
View all

apex construction Reviews and Ratings

based on 3 reviews

4.8/5

Rating in categories

5.0

Skill development

4.8

Work-life balance

4.5

Salary

4.8

Job security

4.8

Company culture

4.8

Promotions

5.0

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
4 salaries
unlock blur

₹3.6 L/yr - ₹4.8 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Safety Officer
4 salaries
unlock blur

₹1.8 L/yr - ₹2.4 L/yr

3D Designer
4 salaries
unlock blur

₹3.2 L/yr - ₹3.2 L/yr

Senior Engineer
3 salaries
unlock blur

₹4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare apex construction with

TCS

3.6
Compare

Accenture

3.7
Compare

Wipro

3.7
Compare

Cognizant

3.7
Compare
write
Share an Interview