Filter interviews by
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
Operation and maintenance of power plant involves ensuring efficient generation of electricity and regular upkeep of equipment.
Regularly monitoring and controlling the power plant operations to ensure smooth functioning
Performing routine maintenance tasks such as cleaning, lubricating, and inspecting equipment
Troubleshooting and repairing any issues that may arise to prevent downtime
Ensuring compliance with safety regu...
Synchronizing a machine involves aligning its speed and phase with another machine or a reference signal.
Use synchronization methods like phase-locked loops or synchrophasors
Adjust the frequency and phase of the machine to match the reference signal
Ensure proper communication and feedback between machines for accurate synchronization
The head of a power plant refers to the height difference between the water source and the turbine in a hydroelectric power plant.
The head is crucial in determining the potential energy available for generating electricity
It is measured in meters or feet and represents the vertical distance the water falls before reaching the turbine
Higher head results in more efficient power generation
Examples: Hoover Dam has a head o...
Various types of turbines are used in electrical engineering, including steam turbines, gas turbines, and hydroelectric turbines.
Steam turbines are commonly used in power plants to generate electricity by using steam to drive the turbine blades.
Gas turbines are often used in aircraft engines and smaller power plants for electricity generation.
Hydroelectric turbines harness the power of flowing water to generate electri...
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
Yes, I have knowledge about labour laws, PF proceedings, and contract laws.
I have a strong understanding of labor laws and regulations, including the Fair Labor Standards Act (FLSA) and the Family and Medical Leave Act (FMLA).
I am well-versed in PF proceedings and have experience managing employee provident fund accounts.
I have a comprehensive understanding of contract laws and have drafted and reviewed various employm...
Corporate transfer from other group to ANZ
The process involves assessing the candidate's skills and experience
The candidate must meet ANZ's requirements and standards
The candidate may need to undergo additional training or orientation
The HR department will facilitate the transfer process
The candidate's current employer may need to provide clearance or release
ANZ may offer relocation assistance or benefits
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Very easy
based on 1 interview
Interview experience
based on 11 reviews
Rating in categories
Assistant Manager
9
salaries
| ₹6 L/yr - ₹11 L/yr |
Deputy Manager
6
salaries
| ₹6.6 L/yr - ₹10.6 L/yr |
Senior Electrical Engineer
6
salaries
| ₹5 L/yr - ₹6 L/yr |
Engineer
5
salaries
| ₹3.2 L/yr - ₹9.1 L/yr |
Senior Engineer
5
salaries
| ₹4.8 L/yr - ₹6.2 L/yr |
TCS
Accenture
Cognizant
Infosys