Filter interviews by
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
I have over 5 years of experience managing projects in various industries.
Managed cross-functional teams to successfully deliver projects on time and within budget
Utilized project management tools such as Gantt charts and Kanban boards to track progress
Implemented Agile methodologies to improve project efficiency
Communicated effectively with stakeholders to ensure project goals were met
Led a team in the successful impl...
I have a Bachelor's degree in Business Administration and a Project Management Professional (PMP) certification.
Bachelor's degree in Business Administration
Project Management Professional (PMP) certification
A manual expressway is a toll road where tolls are collected manually from drivers at toll booths.
Manual expressways have toll booths where drivers must stop and pay tolls in cash.
Toll collectors manually collect tolls from drivers before allowing them to proceed.
Manual expressways are less common now with the introduction of electronic toll collection systems like E-ZPass.
Examples of manual expressways include some hi...
NH Manual is a document that outlines the policies, procedures, and guidelines for managing projects within an organization.
NH Manual provides a framework for project managers to follow
It includes information on project initiation, planning, execution, monitoring, and closure
Examples of contents in NH Manual: project charter template, risk management plan, communication plan
Returnwalls provide structural support and stability in construction projects.
Returnwalls help distribute loads and prevent lateral movement in structures.
They are commonly used in retaining walls, bridge abutments, and other infrastructure projects.
Returnwalls can be made of various materials such as concrete, steel, or timber.
They are essential for ensuring the safety and longevity of the structure.
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
Top trending discussions
Quantitative reasoning
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
General aptitude questions.(moderate level)
posted on 30 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.
Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.
Hazard communication standards require employers to provide information about hazardous chemicals used on site.
Scaffolding safety regulations cover proper construction, use, and maintenan...
AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.
AISC 360 - Specification for Structural Steel Buildings
AISC 341 - Seismic Provisions for Structural Steel Buildings
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Interview experience
based on 25 reviews
Rating in categories
Civil Site Engineer
7
salaries
| ₹3 L/yr - ₹7 L/yr |
Highway Engineer
7
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Structural Engineer
5
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Junior Engineer
5
salaries
| ₹1.9 L/yr - ₹2.2 L/yr |
Senior Highway Engineer
5
salaries
| ₹6.2 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
TCS
Infosys
Wipro