Filter interviews by
The firing order of a Hino engine depends on the specific model and configuration.
The firing order can be found in the engine's service manual or technical specifications.
It is typically a specific sequence in which the engine's cylinders fire.
For example, the firing order of a Hino J08E engine is 1-5-3-6-2-4.
Leaf springs are used in vehicles to provide support and suspension, allowing for smooth and stable rides.
Leaf springs are commonly used in the suspension systems of trucks, trailers, and some cars.
They are made up of multiple layers of curved metal strips, called leaves, which are stacked on top of each other.
The main purpose of leaf springs is to absorb and distribute the weight and forces exerted on the vehicle, pro...
I applied via Referral and was interviewed before Mar 2022. There were 3 interview rounds.
Knowledge of Bus depot operation
To achieve targets in time, planning is crucial.
Set clear and specific goals
Break down goals into smaller tasks
Assign tasks to team members based on their strengths
Create a timeline and schedule for each task
Regularly monitor progress and adjust plans as needed
Communicate with team members to ensure everyone is on the same page
Celebrate milestones and successes along the way
I was interviewed before Jun 2022.
Only Experience based question asked with me.
Top trending discussions
posted on 27 Jan 2025
posted on 26 Oct 2024
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Plate weight can be calculated by multiplying the area of the plate by its density.
Calculate the area of the plate by multiplying its length and width.
Determine the density of the material of the plate.
Multiply the area by the density to get the weight of the plate.
Cycle time can be calculated by dividing the total production time by the total number of units produced.
Calculate the total production time, including setup time, processing time, and downtime.
Determine the total number of units produced during that time period.
Divide the total production time by the total number of units produced to get the cycle time.
Cycle Time = Total Production Time / Total Number of Units Produce
posted on 30 May 2024
posted on 4 May 2024
I applied via campus placement at Sardar Vallabhbhai National Institute of Technology (NIT), Surat and was interviewed in Apr 2024. There were 2 interview rounds.
It consists of electronics and electrical core based question
based on 3 interviews
Interview experience
based on 54 reviews
Rating in categories
Service Engineer
23
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Assistant Manager
8
salaries
| ₹3.6 L/yr - ₹5.3 L/yr |
Store Incharge
7
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
HR Executive
6
salaries
| ₹3.2 L/yr - ₹4.4 L/yr |
Assistant Workshop Manager
6
salaries
| ₹3.8 L/yr - ₹5.5 L/yr |
Bombardier Transportation
Indira Gandhi International Airport
Indian Railway Catering and Tourism
Hyva