Filter interviews by
I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.
My current CTC is $80,000 per year.
My current Cost to Company is $80,000 per year.
I am currently earning $80,000 annually.
My current salary package is $80,000 per annum.
Notice period refers to the amount of time an employee must give before leaving a job.
Notice period is typically stated in the employment contract.
It can range from 1 week to several months depending on the company and position.
During the notice period, the employee is expected to work as usual.
Some companies may pay the employee in lieu of notice.
Notice period allows the employer to find a replacement and the employee
I was interviewed before Aug 2022.
Reducing machining cycle time can be achieved by optimizing tool paths, using high-speed machining techniques, implementing automation, and improving machine maintenance.
Optimize tool paths to reduce unnecessary movements and minimize idle time.
Utilize high-speed machining techniques to increase cutting speeds and feed rates.
Implement automation such as robotic loading and unloading to reduce manual handling time.
Regul...
To reduce air cutting from machine with ECRS Methodology, adjust cutting parameters, optimize tool paths, use high-quality cutting tools, and implement proper maintenance.
Adjust cutting parameters such as speed, feed rate, and depth of cut to minimize air cutting.
Optimize tool paths to ensure efficient cutting and reduce unnecessary movements.
Use high-quality cutting tools that are sharp and well-maintained to improve ...
posted on 21 Dec 2024
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
The question is asking for the difference between basic method and specification method in production.
Basic method refers to a general approach or technique used in production without specific details.
Specification method involves detailed instructions or requirements for a specific task or product.
Example: Basic method for assembling a product may involve general steps, while specification method would include exact m
Organization method refers to the system or structure used to arrange and manage tasks, resources, and information in a production setting.
Utilize a clear and efficient system for task delegation and tracking
Implement visual management tools such as Kanban boards or Gantt charts
Establish regular communication channels for updates and feedback
Ensure proper documentation and record-keeping for processes and procedures
Enc...
Safety working method involves implementing procedures and protocols to ensure the well-being of employees.
Implementing regular safety training for employees
Enforcing the use of personal protective equipment (PPE)
Conducting regular safety inspections and audits
Encouraging employees to report any safety concerns or hazards
Establishing emergency response plans and procedures
Quality method refers to the approach or system used to ensure products meet standards. Type of work method refers to the specific process or technique used to complete tasks.
Quality method can include Six Sigma, Total Quality Management, Lean Manufacturing, etc.
Type of work method can include Agile, Waterfall, Kanban, etc.
Quality method focuses on ensuring products meet quality standards and customer requirements.
Type...
Problem solving method involves identifying the issue, analyzing possible solutions, implementing the best solution, and evaluating the outcome.
Identify the problem or issue at hand
Gather relevant information and data
Brainstorm possible solutions
Evaluate each solution based on feasibility and impact
Implement the best solution
Monitor and evaluate the outcome for effectiveness
posted on 25 Jun 2024
To handle a difficult permanent operator, establish clear expectations, communicate effectively, address issues promptly, provide support and training, and seek to understand their perspective.
Establish clear expectations for performance and behavior.
Communicate effectively and regularly to address any concerns or issues.
Address problems promptly and professionally to prevent escalation.
Provide support, training, and r...
DWM activities refer to Daily Work Management activities, which involve planning, organizing, and monitoring daily tasks to ensure efficiency and productivity.
Creating daily work schedules for production team members
Assigning tasks and responsibilities to team members
Monitoring progress and addressing any issues that arise
Implementing improvements to streamline processes
Ensuring adherence to safety protocols and qualit
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves setting up autonomous maintenance teams to perform routine tasks and inspections.
TPM also includes planned maintenance, quality maintenance, and focused improvement activities.
The goa...
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is available for production.
Performance measures the speed at which the equipment runs compared to its maximum speed.
Quality measures the percentage of good parts produced c...
I was interviewed in Aug 2024.
English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word
posted on 21 Mar 2024
I applied via Walk-in
Technical skills about maching process
About presonal detail.
posted on 18 Feb 2024
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Performance rate is 97%
Performance rate = 100% - (100% - 97%) = 3%
Performance rate = 3%
This means the actual performance is 3% below the planned performance
Implement strict quality control measures, identify root causes of rework, provide training to employees, and continuously monitor and improve processes.
Implement strict quality control measures to catch errors early on
Identify root causes of rework to address underlying issues
Provide training to employees to improve skills and reduce errors
Continuously monitor and improve processes to prevent rework
Utilize data analys
I improve my productivity rate by setting clear goals, prioritizing tasks, utilizing time management techniques, and continuously seeking ways to streamline processes.
Setting clear goals to stay focused and motivated
Prioritizing tasks based on importance and deadlines
Utilizing time management techniques such as the Pomodoro technique or Eisenhower matrix
Seeking ways to streamline processes through automation or optimiz...
Labor cost can be decreased by implementing automation, optimizing processes, outsourcing non-core tasks, and cross-training employees.
Implement automation to reduce manual labor requirements
Optimize processes to increase efficiency and reduce labor hours
Outsource non-core tasks to lower cost regions or specialized vendors
Cross-train employees to handle multiple roles and tasks effectively
To reduce change over frequency, implement standardized work procedures, improve equipment reliability, optimize scheduling, and minimize setup times.
Implement standardized work procedures to ensure consistency and efficiency during changeovers
Improve equipment reliability to reduce downtime and increase productivity
Optimize scheduling to minimize changeover frequency and maximize production time
Minimize setup times by...
DWM stands for Daily Work Management, which involves planning, organizing, and executing daily tasks to ensure efficient production operations.
DWM involves creating daily schedules for production activities
It includes assigning tasks to team members and monitoring progress
Regularly updating and adjusting plans based on production needs
Examples: setting up daily production targets, coordinating with different department
Performance is dependent on various factors, not just availability.
Performance is influenced by factors such as skill level, experience, resources, and support.
Availability is just one aspect that can impact performance, but it is not the sole determinant.
For example, even if availability is high, performance may still be low if other factors are not optimal.
Listen to the complaint, empathize with the customer, investigate the issue, offer a solution, follow up to ensure satisfaction.
Listen actively to the customer's complaint without interrupting
Empathize with the customer and acknowledge their frustration
Investigate the issue to understand the root cause
Offer a solution that addresses the customer's concerns
Follow up with the customer to ensure their satisfaction with th
To manage abnormal conditions, prioritize safety, assess the situation, take corrective actions, and communicate effectively.
Prioritize safety of personnel and equipment
Assess the situation to understand the root cause
Take corrective actions promptly to mitigate the abnormal condition
Communicate effectively with team members and stakeholders
Implement preventive measures to avoid recurrence
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
Interview experience
Junior Engineer
96
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Oprating Engineer
33
salaries
| ₹1.4 L/yr - ₹3.5 L/yr |
Assistant Engineer
29
salaries
| ₹2.2 L/yr - ₹3.7 L/yr |
Senior Engineer
28
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Quality Engineer
26
salaries
| ₹2 L/yr - ₹5.1 L/yr |
Samvardhana Motherson Group
Bharat Forge
Sundaram Clayton
Rane (Madras)