Reducing machining cycle time can be achieved by optimizing tool paths, using high-speed machining techniques, implementing automation, and improving machine maintenance.
Optimize tool paths to reduce unnecessary movements and minimize idle time.
Utilize high-speed machining techniques to increase cutting speeds and feed rates.
Implement automation such as robotic loading and unloading to reduce manual handling time.
Regul...
To reduce air cutting from machine with ECRS Methodology, adjust cutting parameters, optimize tool paths, use high-quality cutting tools, and implement proper maintenance.
Adjust cutting parameters such as speed, feed rate, and depth of cut to minimize air cutting.
Optimize tool paths to ensure efficient cutting and reduce unnecessary movements.
Use high-quality cutting tools that are sharp and well-maintained to improve ...
I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.
Top trending discussions
posted on 6 Nov 2023
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 4 interview rounds.
posted on 15 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 21 Mar 2024
I applied via Walk-in
Technical skills about maching process
About presonal detail.
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 3 Apr 2024
I applied via Recruitment Consultant and was interviewed in May 2020. There were 3 interview rounds.
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
268
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Quality Engineer
107
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Engineer
86
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Engineer
84
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Production Engineer
76
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane Holdings