Filter interviews by
Testing of HT and LT Panels involves checking for proper functioning and safety of high and low tension electrical panels.
Perform visual inspection for any physical damage or loose connections
Check for proper functioning of circuit breakers and relays
Verify correct voltage and current readings using appropriate testing equipment
Ensure proper grounding and insulation resistance levels
Conduct functional tests to ensure a
Maths and Reasoning etc.
I applied via Walk-in and was interviewed before Mar 2022. There was 1 interview round.
I applied via Company Website and was interviewed before Feb 2020. There were 3 interview rounds.
DOL stands for Direct-On-Line and is a type of motor starter. Star delta starter is another type of motor starter used for induction motors.
DOL is a simple and commonly used method of starting induction motors directly from the power supply.
It provides full voltage to the motor during starting, which can cause high starting current and mechanical stress.
Star delta starter, on the other hand, reduces the starting curren...
MCCB stands for Molded Case Circuit Breaker. It is an electrical protection device used to protect electrical circuits from overloads and short circuits.
MCCB is a type of circuit breaker that is enclosed in a molded case made of insulating material.
It is designed to provide protection against overcurrents, such as overloads and short circuits.
MCCBs are commonly used in industrial and commercial applications to protect ...
VCB stands for Vacuum Circuit Breaker.
VCB is an electrical switch that uses vacuum as the arc quenching medium.
It is used to protect electrical equipment from short circuits and overloads.
VCBs are commonly used in power distribution systems and industrial applications.
They offer faster and more reliable operation compared to traditional circuit breakers.
Examples of VCB manufacturers include ABB, Siemens, and Schneider
Ambit Switchgear interview questions for popular designations
I applied via Approached by Company and was interviewed before Jun 2022. There were 2 interview rounds.
posted on 29 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The process to control shrinkage in stores involves implementing strict inventory management procedures and conducting regular audits.
Implementing a system for tracking inventory levels and monitoring stock movement
Conducting regular audits to identify any discrepancies or losses
Training staff on proper inventory management procedures and the importance of minimizing shrinkage
Implementing security measures such as CCTV...
posted on 5 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
I appeared for an interview before Feb 2024.
AC-DC converter converts alternating current (AC) to direct current (DC) for various applications.
AC voltage is converted to DC voltage using rectifiers
Rectifiers can be half-wave, full-wave, or bridge rectifiers
Filtering is done to smooth out the output voltage
Examples include power supplies for electronic devices and battery chargers
I applied via LinkedIn and was interviewed in Jul 2023. There were 4 interview rounds.
I applied via Job Fair and was interviewed before Apr 2023. There was 1 interview round.
Regarding electrical project related discussion
based on 7 interviews
Interview experience
based on 35 reviews
Rating in categories
Design Engineer
6
salaries
| ₹4.1 L/yr - ₹5 L/yr |
Quality Engineer
6
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Costing Engineer
5
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Team Lead
5
salaries
| ₹4.8 L/yr - ₹6.6 L/yr |
Senior Production Engineer
5
salaries
| ₹3 L/yr - ₹4 L/yr |
GAO Tek
Amphenol Interconnect
Kyungshin Industrial Motherson
Electrical Research & Development Association