Filter interviews by
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Is code and testing procedures
Top trending discussions
posted on 26 May 2020
I applied via Walk-in and was interviewed in Apr 2020. There were 3 interview rounds.
The 7 QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
As a Quality Engineer in my previous company, I was responsible for ensuring product quality, conducting audits, and implementing quality control processes.
Conducted product quality inspections and audits
Implemented quality control processes to improve product quality
Analyzed data to identify areas for improvement
Collaborated with cross-functional teams to address quality issues
Ensured compliance with industry standard
QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a proactive process that involves planning, designing, and executing tests to prevent defects from occurring.
QC is a reactive process that involves identifying defects through testing and then fixing them.
QA is focused on the entire software development life cycle while QC is focused on the testing phase.
Examples of QA activities ...
posted on 1 Aug 2021
I applied via Campus Placement and was interviewed in Oct 2020. There were 4 interview rounds.
I earn my life by working as an Assistant Engineer.
I earn my life by working in the field of engineering.
I am employed as an Assistant Engineer and receive a salary for my work.
My earnings come from the projects I work on and the services I provide as an Assistant Engineer.
I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
posted on 19 May 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 4 interview rounds.
posted on 10 Jan 2022
I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.
TBO stands for Time Between Overhaul in coupler, which is the time interval between two overhauls of a coupler.
TBO is a maintenance term used in the aviation industry.
It refers to the time interval between two overhauls of a coupler.
During an overhaul, the coupler is disassembled, inspected, repaired, and reassembled.
The TBO for a coupler depends on the manufacturer's recommendations and the coupler's usage.
Exceeding t...
Quality is meeting or exceeding customer expectations and requirements.
Quality is a measure of how well a product or service meets customer needs and expectations.
It involves meeting or exceeding customer requirements and specifications.
Quality can be measured through various metrics such as defect rates, customer satisfaction, and reliability.
Quality is a continuous process that involves identifying and addressing are...
Poka yoke is a quality control technique used to prevent errors or defects in a process.
Poka yoke aims to eliminate mistakes by designing processes or systems that make errors impossible or immediately detectable.
It involves implementing foolproof mechanisms, such as sensors, alarms, or physical barriers, to prevent or correct errors.
For example, a poka yoke in a manufacturing line could be a sensor that detects if a c...
Statistical Process Control (SPC) is a quality tool used to monitor and control processes to ensure they are within acceptable limits.
SPC involves collecting and analyzing data to identify and eliminate sources of variation in a process.
Control charts are commonly used in SPC to visually display process data and identify any trends or patterns.
Examples of SPC tools include histograms, Pareto charts, scatter diagrams, a
Cp and Cpk are statistical tools used to measure process capability and determine if a process is capable of producing products within specification limits.
Cp measures the potential capability of a process to meet specifications
Cpk measures the actual capability of a process to meet specifications
Both Cp and Cpk are calculated using the process mean and standard deviation, as well as the upper and lower specification l...
SPC stands for Statistical Process Control. It is a method used to monitor and control processes to ensure they are operating within acceptable limits.
SPC involves collecting and analyzing data to identify and reduce process variation.
It helps in detecting and preventing defects or errors in a process.
Control charts are commonly used in SPC to visually display process data and identify any trends or patterns.
SPC can be...
I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Engineer
390
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Deputy Engineer
111
salaries
| ₹3.2 L/yr - ₹6.7 L/yr |
Assistant Manager
86
salaries
| ₹5.5 L/yr - ₹15.4 L/yr |
Engineer
72
salaries
| ₹3 L/yr - ₹6.9 L/yr |
Service Engineer
65
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Bosch
JBM Group
Samvardhana Motherson Group
Subros