The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
I was interviewed before Jun 2023.
Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.
Use measuring tape and chalk to mark the layout according to the blueprint
Calculate the column ring cutting length using the formula: 2 x π x radius + height
Ensure accuracy in measurements to avoid errors in construction
posted on 6 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.
Who is the aptitude of myself
posted on 7 Mar 2022
I applied via Walk-in and was interviewed in Feb 2022. There was 1 interview round.
I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.
Project roll. Projects rules & regulations
Coding test. Group discussion
Ring cutting length refers to the measurement of the length of a ring that needs to be cut.
Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).
The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.
For example, if the circumference of a ring is 10 cm, the cutting length would be approximat
The slump in concrete grade m-40 is typically between 75mm to 125mm.
Slump is a measure of the consistency or workability of concrete.
For concrete grade m-40, the slump range is usually between 75mm to 125mm.
Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.
The slump value indicates the flow and compactness of the concrete mix.
A higher ...
I applied via Approached by Company and was interviewed in Jul 2018. There was 1 interview round.
I applied via Approached by Company
Associate
203
salaries
| ₹1.5 L/yr - ₹5.2 L/yr |
Software Engineer
185
salaries
| ₹3.6 L/yr - ₹11 L/yr |
Senior Associate
145
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Senior Software Engineer
132
salaries
| ₹6.8 L/yr - ₹20.4 L/yr |
Senior Analyst
123
salaries
| ₹2.5 L/yr - ₹10.8 L/yr |
Cognizant
Genpact
Wipro
TCS