Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Top trending discussions
I appeared for an interview before Feb 2024.
Discussion on the changes in tecehnology
Test followed by the questions and scenario based questions
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
The manpower required to complete a plan depends on the scope, complexity, and timeline of the project.
Manpower requirements can vary based on the size and complexity of the project.
Consider the skills and expertise needed for each task in the plan.
Factor in the timeline and deadlines for completing the plan.
Utilize project management tools to estimate manpower needs accurately.
Example: A large-scale construction proje...
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
A box segment can be made by cutting a box into two parts along one of its faces.
Choose a face of the box to cut along
Use a saw or knife to cut through the box along the chosen face
Sand the edges of the cut to smooth them out if necessary
I appeared for an interview in Apr 2023.
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Core Java is a programming language that supports OOPs concepts such as inheritance, encapsulation, abstraction, and polymorphism.
Core Java is an object-oriented programming language.
It supports encapsulation, which means hiding the implementation details of an object from the outside world.
Inheritance allows a class to inherit properties and methods from another class.
Abstraction is the process of hiding complex imple...
Docker is a containerization platform that allows developers to package and run applications in isolated environments. Kubernetes is an open-source container orchestration system that automates deployment, scaling, and management of containerized applications.
Docker allows developers to create and run applications in containers, which are lightweight and portable environments that can run on any machine with Docker ins...
To see log of a complete request in docker, use docker logs command.
Use 'docker logs
Use '-f' flag to follow the logs in real-time
Use '--tail' flag to specify the number of lines to show from the end of the logs
Use '--since' and '--until' flags to specify a time range for the logs
Use '--timestamps' flag to show timestamps in the logs
I applied via Indeed and was interviewed before Aug 2020. There was 1 interview round.
Piling is a construction procedure used to strengthen the foundation of a building. It involves various methods and the time taken depends on several factors.
Piling is done using methods like driven piles, bored piles, and auger cast piles.
Driven piles involve hammering precast concrete or steel piles into the ground.
Bored piles are created by drilling a hole into the ground and filling it with concrete.
Auger cast pile...
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
The size of a slump cone is a tool used in concrete testing to measure the consistency of fresh concrete.
The size of a slump cone is typically 12 inches in height.
The base diameter of a slump cone is usually 8 inches.
The top diameter of a slump cone is typically 4 inches.
The size of a slump cone may vary depending on specific testing requirements or standards.
The dimensions of a slump cone are important for accurate me...
To estimate aggregate quantity for a 200sqmt slab, calculate the volume of concrete required and then determine the aggregate quantity based on the mix ratio.
Calculate the volume of concrete required for the slab
Determine the mix ratio of concrete (e.g., 1:2:4)
Calculate the volume of aggregates needed based on the mix ratio
Consider the bulk density of aggregates to convert volume to weight
Account for wastage and add a
Before casting, civil engineers need to check the quality of various elements.
Quality of concrete mix
Quality of reinforcement bars
Quality of formwork
Quality of water used in the mix
Quality of curing process
The number of cubes required for 250 cubic meters of concrete depends on the size of the cubes.
The size of the cubes needs to be specified to determine the number required.
The volume of each cube needs to be calculated.
Divide the total volume of concrete (250 cubic meters) by the volume of each cube to get the number of cubes required.
For example, if the cubes are 1 cubic meter in size, then 250 cubes would be needed.
Post concrete quality inspection involves evaluating the quality of concrete after it has been placed and hardened.
Inspect the concrete for any visible defects such as cracks, honeycombing, or segregation.
Check the concrete strength by conducting compressive strength tests on samples taken from the structure.
Assess the concrete's durability by examining its resistance to factors like freeze-thaw cycles or chemical expo...
SQL (Structured Query Language) is a standard language for managing and manipulating databases, including Microsoft SQL Server (MSSQL).
SQL is used to retrieve and manipulate data in relational databases.
MSSQL is a popular relational database management system that uses SQL.
SQL queries are used to perform operations like selecting, updating, inserting, and deleting data.
Example: SELECT * FROM table_name WHERE condition;
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Software Development Engineer
25
salaries
| ₹8.5 L/yr - ₹19.8 L/yr |
CAE Engineer
20
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Software Engineer
16
salaries
| ₹6 L/yr - ₹17 L/yr |
Senior Software Engineer
12
salaries
| ₹14.5 L/yr - ₹30.4 L/yr |
Intern
7
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Randstad
Team Lease
Innovsource Services
Aarvi Encon