I was interviewed in Jul 2022.
HVDC is a technology used to transmit high voltage DC power over long distances. Offshore connections refer to power transmission from offshore wind farms.
HVDC is more efficient than AC transmission over long distances
Offshore connections require specialized equipment and installation techniques
HVDC is used for offshore connections to transmit power from offshore wind farms to the mainland
Examples of HVDC projects incl...
Top trending discussions
I applied via LinkedIn and was interviewed before Jul 2021. There were 2 interview rounds.
Project flow steps involve planning, design, implementation, testing, and maintenance.
Planning: Define project scope, objectives, and requirements.
Design: Develop a detailed plan and create schematics.
Implementation: Install and integrate components.
Testing: Verify functionality and performance.
Maintenance: Monitor and update system as needed.
Examples: Building a power distribution system, designing a control panel for
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation I = V/R, where I is the current, V is the voltage, and R is the resistance.
It is named after Georg Simon Ohm, a German physicist who first formulated this law.
This law is applicable to all types of circuits, including DC and AC circuits.
It is use...
I applied via Walk-in and was interviewed in Mar 2023. There were 4 interview rounds.
The Loto system stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again during maintenance or servicing.
Loto system involves locking the energy-isolating devices with individual lockout devices to prevent the machine from being turned on
Tagout involves placing a tag on the locked device to indicate that it should not be operated
Employees workin...
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 4 interview rounds.
The process for a project involves planning, design, implementation, testing, and commissioning.
Define project scope and objectives
Create a project plan with timelines and milestones
Design the system or product
Procure necessary materials and equipment
Implement the design and build the system or product
Test the system or product to ensure it meets requirements
Commission the system or product for use
Provide ongoing suppo...
posted on 15 Feb 2023
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
SAP procedure for UPS vendor is a process for managing vendor data in the SAP system.
The SAP procedure for UPS vendor involves creating and maintaining vendor master data in the system.
It includes defining vendor attributes such as payment terms, delivery schedules, and contact information.
The procedure also involves creating purchase orders and managing invoices from the vendor.
Examples of UPS vendors include APC, Eat
The maintenance procedure of DG involves regular checks and servicing to ensure optimal performance.
Regularly check oil and coolant levels
Inspect air filters and replace if necessary
Clean and inspect spark plugs
Check battery and charging system
Perform load bank testing
Schedule routine maintenance with a qualified technician
Keep a maintenance log for record keeping
ATS scheme stands for Automatic Transfer Switch scheme used in power systems.
ATS scheme is used to transfer power supply from one source to another in case of power failure.
It is commonly used in backup power systems to ensure uninterrupted power supply.
ATS scheme can be implemented using mechanical or electronic switches.
It is important to ensure proper coordination between the ATS and protective devices to avoid any ...
Address the issue calmly and professionally, listen to their perspective and try to find a solution together.
Remain calm and avoid getting defensive
Listen to their perspective and try to understand their point of view
Communicate clearly and respectfully
Try to find a solution together
If necessary, involve a mediator or supervisor
Transformer PM involves regular maintenance and inspection to ensure optimal performance.
Perform regular visual inspections to check for signs of wear and tear
Test insulation resistance to ensure it meets standards
Check oil levels and perform oil analysis to detect any contaminants
Inspect and tighten connections
Perform load and temperature tests
Schedule maintenance based on manufacturer recommendations
Examples of maint...
Transformers are protected by various methods to prevent damage from faults and overloads.
Overcurrent protection using fuses or circuit breakers
Thermal protection using temperature sensors and alarms
Buchholz relay protection for detecting internal faults
Differential protection for detecting external faults
Ground fault protection using ground fault relays
Lightning arrestors for protection against lightning strikes
Oil le...
posted on 23 Jun 2023
I applied via Newspaper Ad and was interviewed before Jun 2022. There were 3 interview rounds.
Single phase and three phase are two types of electrical power distribution systems.
Single phase has one live conductor and one neutral conductor, while three phase has three live conductors and one neutral conductor.
Single phase is commonly used in residential and small commercial applications, while three phase is used in industrial and large commercial applications.
Single phase power supply is suitable for low power...
R, Y, B phases are the three phases of AC power supply. They differ in their phase angle and voltage level.
R phase has a phase angle of 0 degrees and is usually connected to the red wire.
Y phase has a phase angle of 120 degrees and is usually connected to the yellow wire.
B phase has a phase angle of 240 degrees and is usually connected to the blue wire.
The voltage level of each phase is the same, but they are out of ph...
In series, voltage adds up while current remains the same. In parallel, voltage remains the same while current adds up.
In series, batteries are connected end-to-end, positive to negative. In parallel, batteries are connected positive to positive and negative to negative.
Series connection increases voltage but does not increase current. Parallel connection increases current but does not increase voltage.
Series connectio...
Periodic maintenance of batteries is crucial for their longevity and optimal performance.
Check the battery terminals for corrosion and clean them if necessary
Inspect the battery case for any cracks or damage
Ensure that the battery is securely fastened in place
Check the electrolyte level and top up with distilled water if required
Test the battery voltage and recharge if necessary
A faulty battery can be identified by checking its voltage, capacity, and physical appearance.
Check the voltage of the battery using a multimeter
Test the capacity of the battery using a battery tester
Inspect the physical appearance of the battery for any signs of damage or leakage
Check the battery terminals for corrosion or loose connections
Compare the battery's performance to its specifications
FUSE, MCB, ELCB, and RCCB are all electrical protection devices, but they differ in their functions and applications.
FUSE is a simple device that protects electrical circuits from overloading or short-circuiting by melting and breaking the circuit.
MCB (Miniature Circuit Breaker) is an automatic switch that trips and cuts off the power supply when there is an overload or short-circuit.
ELCB (Earth Leakage Circuit Breaker...
A DOL starter is a direct online motor starter that provides full voltage to the motor.
Consists of a contactor, overload relay, and start/stop buttons
The contactor connects the motor to the power supply
The overload relay protects the motor from overloading
The start/stop buttons control the on/off function of the motor
Used for small motors with low starting current
Not suitable for large motors or motors with high starti
posted on 25 Aug 2021
I was interviewed in Jul 2021.
I applied via LinkedIn and was interviewed before Jul 2021. There were 2 interview rounds.
Project flow steps involve planning, design, implementation, testing, and maintenance.
Planning: Define project scope, objectives, and requirements.
Design: Develop a detailed plan and create schematics.
Implementation: Install and integrate components.
Testing: Verify functionality and performance.
Maintenance: Monitor and update system as needed.
Examples: Building a power distribution system, designing a control panel for
based on 4 reviews
Rating in categories
Project Engineer
256
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
199
salaries
| ₹7.6 L/yr - ₹30 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹10 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
127
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley