I applied via LinkedIn and was interviewed in Jul 2024. There was 1 interview round.
The steps to dismantle a turbine involve shutting down the system, disconnecting power sources, removing external components, disassembling internal parts, and safely disposing of any hazardous materials.
Shut down the turbine system and ensure it is completely powered off.
Disconnect all power sources to prevent any accidents during dismantling.
Remove any external components such as casing, covers, and piping.
Disassembl...
Top trending discussions
I have worked on various mechanical engineering projects, including designing and testing components for automotive engines and developing manufacturing processes.
Designed and tested components for automotive engines
Developed manufacturing processes
Performed stress analysis and simulation
Collaborated with cross-functional teams to ensure project success
Implemented cost-saving measures in production
Conducted research an
Maintenance is the process of ensuring that equipment and machinery are in good working condition to prevent breakdowns and prolong their lifespan.
Regular inspection and cleaning of equipment
Replacing worn-out parts
Lubrication of moving parts
Testing and calibration of instruments
Record-keeping of maintenance activities
Examples: oil changes for cars, replacing air filters, checking tire pressure
I applied via Job Fair and was interviewed before Sep 2021. There were 2 interview rounds.
Thermal expansion is the tendency of matter to change in shape, area, and volume in response to a change in temperature.
Bearings can be of various types such as ball bearings, roller bearings, sleeve bearings, etc.
Fans can be of different types such as axial fans, centrifugal fans, etc.
Thermal expansion can cause changes in the dimensions of the bearing and fan components, which can affect their performance and lifespa...
My strength lies in my problem-solving skills and attention to detail.
Strong problem-solving skills
Attention to detail
Ability to analyze complex situations
Effective communication skills
Adaptability and flexibility
Teamwork and collaboration
Strong technical knowledge
Experience with CAD software (e.g., AutoCAD, SolidWorks)
Knowledge of engineering principles and practices
To become a highly skilled and innovative Mechanical Engineer, contributing to the development of cutting-edge technologies.
To continuously enhance my technical knowledge and skills in mechanical engineering
To work on challenging projects that push the boundaries of innovation
To collaborate with a diverse team of professionals to solve complex engineering problems
To contribute to the development of sustainable and envi...
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There was 1 interview round.
I have 5 years of experience in the mechanical engineering field.
Worked as a mechanical engineer for 5 years
Experience in designing and testing mechanical systems
Proficient in CAD software such as SolidWorks and AutoCAD
Familiar with industry standards and regulations
Collaborated with cross-functional teams to complete projects
I applied via Recruitment Consulltant and was interviewed in Sep 2021. There was 1 interview round.
tph refers to tons per hour and AQC and PH boilers are used in power plants.
tph stands for tons per hour and is a unit of measurement for the flow rate of material
AQC (Air Quenching Cooler) and PH (Pre-Heater) boilers are commonly used in power plants
The tph of AQC and PH boilers depends on various factors such as the size of the boiler and the type of fuel used
The tph of AQC and PH boilers can range from a few tons pe
The welding electrode used in piping depends on the type of material being welded.
For carbon steel piping, E7018 electrodes are commonly used
For stainless steel piping, E308L electrodes are commonly used
For high-strength piping, E8018 electrodes are commonly used
The electrode must match the material being welded to ensure proper strength and durability
Other factors such as welding position and joint design may also aff
Erection procedure of boiler involves several steps to ensure safe and efficient installation.
Preparation of foundation and base plate
Installation of boiler drum and tubes
Mounting of boiler accessories such as valves and gauges
Connection of pipes and electrical wiring
Testing and commissioning of the boiler
Final inspection and handover to the client
based on 4 interviews
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
360
salaries
| ₹4.9 L/yr - ₹18.7 L/yr |
Manager
253
salaries
| ₹8 L/yr - ₹34 L/yr |
Senior Manager
168
salaries
| ₹10 L/yr - ₹41.5 L/yr |
Deputy Manager
139
salaries
| ₹6.4 L/yr - ₹23 L/yr |
Sales Manager
118
salaries
| ₹2 L/yr - ₹9 L/yr |
UltraTech Cement
JK Cement
Grasim Industries
ACC