Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Quantity of form work can be calculated by determining the area of each formwork component and adding them together.
Calculate the area of each formwork component (walls, slabs, beams, etc.) based on the layout dimensions
Add up the areas of all formwork components to get the total quantity of formwork needed
Consider any additional factors such as wastage or overlaps in the calculations
Use standard formulas or software t
Design mix is a specific combination of materials to achieve desired properties, while nominal mix is a general proportioning of materials.
Design mix involves specific proportions of materials based on testing and analysis
Nominal mix is a rough estimate of proportions without detailed testing
Design mix is more precise and tailored to project requirements
Nominal mix is commonly used for small-scale projects or where det
General intelligence & General knowledge
Top trending discussions
posted on 20 Feb 2015
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
I want to join the company because of its innovative projects and strong company culture.
I am impressed by the company's track record of successful projects.
I believe the company's values align with my own professional goals.
I am excited about the opportunity to work with a talented team of professionals.
I see great potential for growth and development within the company.
I am a dedicated and hardworking individual with relevant skills and experience.
I have a strong work ethic and am committed to delivering high-quality results.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am passionate about the industry and eager to contribute to the team.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 11 May 2018
posted on 12 May 2018
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
based on 2 interviews
Interview experience
based on 21 reviews
Rating in categories
Site Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Purchase Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
GMR Group
Larsen & Toubro Limited
Reliance Infrastructure
Tata Projects