Upload Button Icon Add office photos

Filter interviews by

Acme Cleantech Solutions Assistant Engineer Civil (Civ) Interview Questions and Answers

Updated 16 Jul 2021

Acme Cleantech Solutions Assistant Engineer Civil (Civ) Interview Experiences

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cutting length in R/f bar..
  • Ans. 

    Cutting length in R/f bar is the length of reinforcement required for bending and overlapping in a reinforced concrete structure.

    • Cutting length is calculated based on the shape and size of the structure where the reinforcement bars will be placed.

    • It includes the length required for bending the bars at corners and overlaps at joints.

    • Cutting length helps in determining the quantity of reinforcement bars needed for a spec...

  • Answered by AI
  • Q2. Slump test why is used
  • Ans. 

    Slump test is used to measure the workability of concrete mix.

    • Determines the consistency and fluidity of concrete mix

    • Helps in ensuring the concrete is of the desired quality

    • Results can indicate if adjustments need to be made to the mix proportions

    • Commonly used in construction projects to assess the quality of concrete

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. About projects worked
Round 2 - HR 

(1 Question)

  • Q1. Expected salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is water cement ratio ?
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • It is an important factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • The water cement ratio is typically specified in construction projects to ensure the desired concrete properties.

    • For example, a water cement ratio of 0.5 means that f...

  • Answered by AI
  • Q2. What is slump of concrete ?
  • Ans. 

    Slump of concrete refers to the measure of consistency or workability of fresh concrete.

    • Slump is determined by the vertical settlement of concrete when a cone-shaped mold is removed.

    • It indicates the flow and compactness of concrete.

    • Higher slump values indicate more workable and fluid concrete.

    • Lower slump values indicate less workable and stiffer concrete.

    • Slump test is conducted to ensure the desired consistency of conc

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. How much you are looking??

Interview Preparation Tips

Interview preparation tips for other job seekers - Got selected

I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about your current roles and responsibilities
Round 3 - HR 

(1 Question)

  • Q1. Why do you want to leave company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Should have good knowledge of your assignment

I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Do you understand the engineering drawings, Preparing of BBS,Quantity Estimation
  • Ans. 

    Yes

    • Yes, I understand engineering drawings and can interpret them accurately.

    • Yes, I am proficient in preparing Bar Bending Schedules (BBS) for reinforcement detailing.

    • Yes, I have experience in quantity estimation for construction projects.

    • Yes, I am familiar with relevant software and tools used for these tasks.

    • Yes, I can provide examples of projects where I have successfully performed these tasks.

  • Answered by AI
  • Q2. Mix grade ration of concrete.
  • Ans. 

    Mix grade ratio of concrete refers to the proportion of cement, sand, and aggregate used in the concrete mix.

    • The mix grade ratio of concrete is expressed as the proportion of cement to sand to aggregate.

    • The most common mix grade ratios for concrete are 1:2:3 and 1:3:6.

    • The mix grade ratio of concrete depends on the strength and durability required for the specific project.

    • The mix grade ratio of concrete can be adjusted ...

  • Answered by AI
  • Q3. How to perform a cube test.
  • Ans. 

    Cube test is performed to determine the compressive strength of concrete.

    • Prepare the cube moulds of size 150mm x 150mm x 150mm.

    • Clean the moulds and apply oil to the inner surface.

    • Fill the moulds with concrete in three layers and compact each layer.

    • Level the top surface and cover the moulds with a gunny bag.

    • After 24 hours, remove the moulds and immerse the cubes in water for curing.

    • After 7 days, test the cubes for compr...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your Salary expectation
  • Q2. Why you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard learn some skills whether you are in a bad company just work hard no matter how many hours you are working,One day you will get what you deserve so focus on your work in your intial phase not on how much you are making out of it.

Interview Questionnaire 

3 Questions

  • Q1. What is the leaping length
  • Ans. 

    Leaping length is the distance between two consecutive supports of a bridge or a beam.

    • Leaping length is also known as span length.

    • It is an important factor in the design of bridges and beams.

    • The leaping length determines the maximum load that the structure can bear.

    • For example, a bridge with a leaping length of 50 meters can bear heavier loads than a bridge with a leaping length of 30 meters.

  • Answered by AI
  • Q2. What is the UTM
  • Ans. 

    UTM stands for Universal Transverse Mercator, a coordinate system used to locate positions on the Earth's surface.

    • UTM divides the Earth into 60 zones, each 6 degrees of longitude wide.

    • It uses a grid system to give a unique location to every point on the Earth's surface.

    • UTM coordinates are given in meters, making it easy to measure distances and areas.

    • It is commonly used in mapping, surveying, and navigation application...

  • Answered by AI
  • Q3. What is the 20 in M20
  • Ans. 

    The 20 in M20 refers to the compressive strength of concrete in megapascals after 28 days of curing.

    • M20 is a mix of concrete with a compressive strength of 20 MPa after 28 days of curing.

    • The compressive strength of concrete is the maximum load it can bear before crushing.

    • The strength of concrete depends on the ratio of cement, sand, and aggregate used in the mix.

    • Other grades of concrete include M10, M15, M25, M30, etc....

  • Answered by AI

Tell us how to improve this page.

People are getting interviews through

based on 1 Acme Cleantech Solutions interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.2
 • 235 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
ReNew Interview Questions
4.2
 • 81 Interviews
TechnipFMC Interview Questions
4.0
 • 68 Interviews
Hilti Interview Questions
3.5
 • 59 Interviews
Waaree Energies Interview Questions
3.9
 • 55 Interviews
TK Elevator Interview Questions
4.0
 • 53 Interviews
View all
Assistant Manager
164 salaries
unlock blur

₹4 L/yr - ₹14.5 L/yr

Electrical Engineer
125 salaries
unlock blur

₹2.2 L/yr - ₹7.1 L/yr

Senior Engineer
93 salaries
unlock blur

₹3.6 L/yr - ₹12 L/yr

Deputy Manager
84 salaries
unlock blur

₹7.7 L/yr - ₹18.7 L/yr

Engineer
53 salaries
unlock blur

₹2.2 L/yr - ₹5.7 L/yr

Explore more salaries
Compare Acme Cleantech Solutions with

Suzlon Group

4.1
Compare

Thermax Limited

4.2
Compare

Waaree Energies

3.9
Compare

Hero Future Energies

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview