Upload Button Icon Add office photos

Acme Cleantech Solutions

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Acme Cleantech Solutions Site Engineer Interview Questions and Answers

Updated 25 Feb 2022

Acme Cleantech Solutions Site Engineer Interview Experiences

2 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Feb 2022

I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Yes i am agree. I have good knowledge of pv solar plant. Ihave three years good experience in solar.
  • Q2. All about of solar power plant and assesary. Any requarment of engineer please select me. Thanks.
  • Q3. Ac. &D.C. all of solar power plant and 220kv swtchyard.

Interview Preparation Tips

Interview preparation tips for other job seekers - I want to say all staff pleas any requarment of engineer of solar power plant so please select me.

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Dec 2019

I applied via Company Website and was interviewed in Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience regarding solar modules
  • Q2. Inverters,Transformers,type of modules ,wattage, what maintenance we had done in my previous site,what type of faults rectified ,what are the remedies followed for making the plant with no faults,etc...,

Interview Preparation Tips

Interview preparation tips for other job seekers - Where ever you work learn the work you are doing ,definitely it will be the question paper for your next interview

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What a term of Rolling margin on a steel?
Q3. Which type of pipe Line and it's standards following
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Transformers and generators at wtg questions
  • Q2. HT and WTG G-97 & G-114 wtg model questions

Interview Preparation Tips

Topics to prepare for ReNew Site Engineer interview:
  • Electricals
Interview preparation tips for other job seekers - My favorite wtg claiming doing hard work, good job holder at any work.

I applied via LinkedIn and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How old are you
  • Q2. How many years do you work here

Interview Preparation Tips

Interview preparation tips for other job seekers - Bold Answers expected from interview panel

I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Solar project all activities question like MCR building, ICR room drainage , switch yard, precast , fencing, pooling sub station , MMS structure , module installation etc , cable trench excavation laying a...

Interview Preparation Tips

Interview preparation tips for other job seekers - Good skill of technical field knowledge , good understanding and knowledge of drawing . Also good knowledge of core field subject.

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Electrical technical O&M , project
  • Q2. Project and O &M technical electrical

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical engineer in technical project and O &M

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to trouble shoot inverters , scbs, transformer, breakers
  • Ans. 

    To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:

    • Check for loose connections and wiring

    • Inspect for physical damage or wear and tear

    • Use a multimeter to test voltage and current

    • Check for proper grounding

    • Refer to manufacturer's manual for specific troubleshooting steps

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep to know
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is boiler & auxiliaries
  • Ans. 

    Boiler is a device used to generate steam by heating water. Auxiliaries are equipment used to support the boiler.

    • Boiler is used in industries for various purposes such as power generation, heating, and processing.

    • Auxiliaries include feedwater pumps, blowdown tanks, deaerators, and economizers.

    • Feedwater pumps are used to supply water to the boiler, blowdown tanks are used to remove impurities from the boiler water, deae...

  • Answered by AI
  • Q2. What is hydrotest & methods
  • Ans. 

    Hydrotest is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water or other liquid.

    • Hydrotest is done to ensure that the vessel or pipeline can withstand the required pressure without leaking or rupturing.

    • The vessel or pipeline is filled with water or other liquid and pressurized to a level higher than its maximum operating pressure.

    • The pressure is held for a specified...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best wishes for everyone & prepare best for your interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Relevant to works which are mentioned in your CV.
  • Q2. Wind turbine terminology, Various electrical troubleshooting, Preventive maintenance?
  • Q3. Wind turbine KPI?
  • Q4. Basic introduction?
Round 2 - Technical 

(1 Question)

  • Q1. Overall summarise your experience relevant to your job role.
Round 3 - HR 

(1 Question)

  • Q1. Discussion about salary expectation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Related and previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Contribute & help others!
anonymous
You can choose to be anonymous

Acme Cleantech Solutions Interview FAQs

How many rounds are there in Acme Cleantech Solutions Site Engineer interview?
Acme Cleantech Solutions interview process usually has 2 rounds. The most common rounds in the Acme Cleantech Solutions interview process are Resume Shortlist and Technical.
What are the top questions asked in Acme Cleantech Solutions Site Engineer interview?

Some of the top questions asked at the Acme Cleantech Solutions Site Engineer interview -

  1. Inverters,Transformers,type of modules ,wattage, what maintenance we had done i...read more
  2. Yes i am agree. I have good knowledge of pv solar plant. Ihave three years good...read more
  3. All about of solar power plant and assesary. Any requarment of engineer please ...read more

Recently Viewed

INTERVIEWS

Decision Point

No Interviews

INTERVIEWS

Juniper Networks

No Interviews

INTERVIEWS

Decision Point

No Interviews

INTERVIEWS

Acme Cleantech Solutions

20 top interview questions

LIST OF COMPANIES

Acme Cleantech Solutions

Locations

INTERVIEWS

Juniper Networks

No Interviews

INTERVIEWS

Juniper Networks

No Interviews

INTERVIEWS

Decision Point

No Interviews

LIST OF COMPANIES

Aditya Birla Chemicals

Locations

INTERVIEWS

Aditya Birla Chemicals

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 251 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
TechnipFMC Interview Questions
4.0
 • 70 Interviews
TÜV SÜD Interview Questions
3.9
 • 61 Interviews
Hilti Interview Questions
3.5
 • 60 Interviews
Waaree Energies Interview Questions
3.9
 • 57 Interviews
View all
Acme Cleantech Solutions Site Engineer Salary
based on 8 salaries
₹3.2 L/yr - ₹4.2 L/yr
At par with the average Site Engineer Salary in India
View more details

Acme Cleantech Solutions Site Engineer Reviews and Ratings

based on 4 reviews

1.6/5

Rating in categories

1.5

Skill development

1.5

Work-life balance

1.5

Salary

1.5

Job security

2.4

Company culture

1.5

Promotions

1.5

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
166 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
125 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
89 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
72 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Acme Cleantech Solutions with

Suzlon Group

4.1
Compare

Thermax Limited

4.1
Compare

Waaree Energies

3.9
Compare

Hero Future Energies

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview