Filter interviews by
I applied via Company Website and was interviewed in Mar 2022. There were 3 interview rounds.
Health safety management, office Documentation, store Inspection
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
Top trending discussions
I was interviewed in Dec 2024.
ERP stands for Emergency Response Plan. It is a plan outlining procedures to follow in case of emergencies.
ERP is a detailed plan outlining steps to be taken in case of emergencies such as fires, natural disasters, or accidents.
There are different types of ERP depending on the nature of the organization and the potential risks involved.
Common types of ERP include fire evacuation plans, medical emergency response plans,...
I was interviewed in Oct 2022.
I applied via Naukri.com and was interviewed in Oct 2019. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
ERP stands for Emergency Response Plan. It is a plan outlining procedures to follow in case of emergencies.
ERP is a detailed plan outlining steps to be taken in case of emergencies such as fires, natural disasters, or accidents.
There are different types of ERP depending on the nature of the organization and the potential risks involved.
Common types of ERP include fire evacuation plans, medical emergency response plans,...
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
Safety is the state of being protected from harm, injury, or danger.
Safety involves identifying and mitigating potential hazards in the workplace or environment.
Leading indicators are proactive measures that can predict future safety performance, such as safety training or equipment maintenance.
Lagging indicators are reactive measures that track past safety performance, such as injury rates or incident reports.
Safety i...
PTW system stands for Permit to Work system. It is used to ensure that work is carried out safely and efficiently.
PTW system is a formal written procedure used to control high-risk activities.
It involves obtaining permission before starting any work that carries a significant risk.
It ensures that all necessary safety precautions are taken before work begins.
Examples of high-risk activities that require PTW include work...
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.
There are different types of scaffolding such as suspended, supported, and mobile.
Suspended scaffolding is hung from the roof or a tall structure.
Supported scaffolding is built from the ground up and supported by poles or frames.
Mobile scaffolding is movable and can be easily transported from one location ...
I was interviewed in Dec 2024.
based on 21 reviews
Rating in categories
Assistant Manager
373
salaries
| ₹4 L/yr - ₹13.8 L/yr |
Manager
201
salaries
| ₹9.9 L/yr - ₹29 L/yr |
Deputy Manager
195
salaries
| ₹6.7 L/yr - ₹19.6 L/yr |
Senior Executive
159
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Senior Engineer
123
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Ambuja Cements
UltraTech Cement
Shree Cement
The Ramco Cements