Upload Button Icon Add office photos

ACC

Compare button icon Compare button icon Compare

Filter interviews by

ACC Maintenance Engineer Interview Questions and Answers for Experienced

Updated 22 Feb 2022

ACC Maintenance Engineer Interview Experiences for Experienced

1 interview found

I applied via Company Website and was interviewed in Jan 2022.Ā There were 2 interview rounds.

Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HRĀ 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Where do you see yourself in 5 years?
  • Q4. Why are you looking for a change?
  • Q5. Share details of your previous job.
  • Q6. Why should we hire you?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for ACC Maintenance Engineer interview:
  • Electricals
  • 11kv line in distribution
  • AB switch setup
  • Battery
  • Circuit breaker
  • Starters
Interview preparation tips for other job seekers - Search the job as soon as possible soon, for getting the knowledge and good experience.

Interview questions from similar companies

Interview QuestionnaireĀ 

6 Questions

  • Q1. What major jobs have you done
  • Ans. 

    I have worked on various mechanical engineering projects, including designing and testing components for automotive engines and developing manufacturing processes.

    • Designed and tested components for automotive engines

    • Developed manufacturing processes

    • Performed stress analysis and simulation

    • Collaborated with cross-functional teams to ensure project success

    • Implemented cost-saving measures in production

    • Conducted research an

  • Answered by AI
  • Q2. Kiln & vrm gear box maintenance
  • Q3. What is maintenance done
  • Ans. 

    Maintenance is the process of ensuring that equipment and machinery are in good working condition to prevent breakdowns and prolong their lifespan.

    • Regular inspection and cleaning of equipment

    • Replacing worn-out parts

    • Lubrication of moving parts

    • Testing and calibration of instruments

    • Record-keeping of maintenance activities

    • Examples: oil changes for cars, replacing air filters, checking tire pressure

  • Answered by AI
  • Q4. Has overhauling vrm gear box and sim is inserted in kiln tyer & cooler maintenance
  • Q5. Bucket elevator maintenance ball Mill maintenance roller press maintenance
  • Q6. Cf silo maintenance preheater maintenance

Interview QuestionnaireĀ 

1 Question

  • Q1. Maintenance Related
Round 1 - TechnicalĀ 

(1 Question)

  • Q1. Related to whrs project 1. how to execute work activities 2. Old company role 3. Ibr documentation 4. Technical specifications of Whrs as for turbine erection, acc & boiler erection sequence etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Self confidence is big advantage

I applied via Naukri.com and was interviewed in Aug 2021.Ā There were 3 interview rounds.

Round 1 - TechnicalĀ 

(1 Question)

  • Q1. Breif knowledge about kiln,roller press,vrm mqintenance related technical
Round 2 - HRĀ 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why are you looking for a change?
  • Q3. Tell me about yourself.
Round 3 - TechnicalĀ 

(1 Question)

  • Q1. About yourself and background professional. Experience

Interview Preparation Tips

Topics to prepare for Star Cement Mechanical Engineer interview:
  • Kiln maintenance
  • Vrm maintenance
  • Roller press maintenance
Interview preparation tips for other job seekers - Keep thorough your technical knowledge part strong
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - TechnicalĀ 

(1 Question)

  • Q1. Questions related to gearbox assembly, process, compressor, blowers, elevators, etc were asked.

I applied via Job Fair and was interviewed before Sep 2021.Ā There were 2 interview rounds.

Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - TechnicalĀ 

(3 Questions)

  • Q1. Type of bearing and fan What is the thermal expansion
  • Ans. 

    Thermal expansion is the tendency of matter to change in shape, area, and volume in response to a change in temperature.

    • Bearings can be of various types such as ball bearings, roller bearings, sleeve bearings, etc.

    • Fans can be of different types such as axial fans, centrifugal fans, etc.

    • Thermal expansion can cause changes in the dimensions of the bearing and fan components, which can affect their performance and lifespa...

  • Answered by AI
  • Q2. What is your strength
  • Ans. 

    My strength lies in my problem-solving skills and attention to detail.

    • Strong problem-solving skills

    • Attention to detail

    • Ability to analyze complex situations

    • Effective communication skills

    • Adaptability and flexibility

    • Teamwork and collaboration

    • Strong technical knowledge

    • Experience with CAD software (e.g., AutoCAD, SolidWorks)

    • Knowledge of engineering principles and practices

  • Answered by AI
  • Q3. What is your ambition
  • Ans. 

    To become a highly skilled and innovative Mechanical Engineer, contributing to the development of cutting-edge technologies.

    • To continuously enhance my technical knowledge and skills in mechanical engineering

    • To work on challenging projects that push the boundaries of innovation

    • To collaborate with a diverse team of professionals to solve complex engineering problems

    • To contribute to the development of sustainable and envi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Accurate listing of question and given answer confidently

I applied via Walk-in and was interviewed in Aug 2021.Ā There were 3 interview rounds.

Interview QuestionnaireĀ 

1 Question

  • Q1. Basic mechanical engineering questions and my experience related departmental & equipment maintenance & operational questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve your equipment maintenance & operational & numerical analysis maths solving efficiency & theoretically knowledge.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2023.Ā There were 3 interview rounds.

Round 1 - TechnicalĀ 

(4 Questions)

  • Q1. Function s of Belt conveyors and clinker Hopper & Roller press & cement silo
  • Ans. 

    Belt conveyors transport materials, clinker hopper stores clinker, roller press crushes materials, cement silo stores cement.

    • Belt conveyors are used to transport materials from one location to another in a production process.

    • Clinker hopper is a storage unit for clinker, a material used in cement production.

    • Roller press is a machine used to crush materials before they are fed into the cement production process.

    • Cement si...

  • Answered by AI
  • Q2. Long conveyor Erection processor and Time of completion the job and . Good safety Manner
  • Q3. Sufficient Man power of 1000mtrs Belt conveyor structure Trassel assembly work & Gallery Assembly work time of erection time.
  • Ans. 

    The time required for the erection of a 1000mtrs belt conveyor structure trassel assembly work and gallery assembly work depends on the manpower available.

    • The time of erection will vary based on the experience and efficiency of the workers involved.

    • Factors such as complexity of the structure, availability of equipment, and coordination among the team members will also impact the assembly time.

    • For example, if there are ...

  • Answered by AI
  • Q4. Time of Belt laying and assembly the Gear box motor Alignment and fix the pulley s
  • Ans. 

    The time required for belt laying, gear box motor assembly, and pulley alignment depends on various factors such as complexity, experience of the engineer, and availability of tools.

    • The time for belt laying can vary based on the length and type of belt being used.

    • Assembling the gear box motor may take longer if it involves intricate components or precise alignment.

    • Fixing the pulley s can be quick if the engineer is exp...

  • Answered by AI
Round 2 - TechnicalĀ 

(2 Questions)

  • Q1. Clinker Hopper and weigh Feeder and Bag Filter Fan & De-Dusting line and Compressor pipe line.
  • Q2. Capacity of each Hopper & Dia of Hopper and length of Belt conveyor capacity of Gear box motor load RPM.
  • Ans. 

    The capacity of each hopper, diameter and length of belt conveyor, capacity of gearbox motor load, and RPM are important factors in mechanical engineering.

    • Capacity of each hopper refers to the maximum amount of material it can hold at one time.

    • Diameter and length of belt conveyor determine the amount and speed of material that can be transported.

    • Capacity of gearbox motor load indicates the maximum load the motor can ha...

  • Answered by AI
Round 3 - HRĀ 

(2 Questions)

  • Q1. Salary discussion and my personal details
  • Q2. Working in previous company salary payslip

Interview Preparation Tips

Interview preparation tips for other job seekers - Think more knowledge and get job in easy way.When doing the job be safe.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023.Ā There were 4 interview rounds.

Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - TechnicalĀ 

(2 Questions)

  • Q1. Please define as kiln process?
  • Ans. 

    A kiln process is a method used to heat materials to high temperatures in order to change their physical or chemical properties.

    • Kiln processes are commonly used in industries such as ceramics, cement, and metallurgy.

    • Materials are placed in a kiln, which is a type of oven or furnace, and heated to specific temperatures for a set amount of time.

    • The high temperatures in the kiln can cause chemical reactions, phase changes...

  • Answered by AI
  • Q2. Total kiln section?
  • Ans. 

    The total kiln section refers to the combined length of all sections of a kiln, including preheating, firing, and cooling zones.

    • Total kiln section is the sum of all individual sections in a kiln.

    • It includes preheating, firing, and cooling zones.

    • For example, a kiln may have a preheating section of 10 meters, a firing section of 20 meters, and a cooling section of 15 meters, making the total kiln section 45 meters.

  • Answered by AI
Round 3 - Bachelor degree relatedĀ 

(2 Questions)

  • Q1. Types of gear box ?
  • Ans. 

    Types of gear boxes include spur, helical, bevel, worm, planetary, and more.

    • Spur gear box: simple and efficient, used in low-speed applications

    • Helical gear box: smoother and quieter operation, used in high-speed applications

    • Bevel gear box: used to change the direction of power transmission

    • Worm gear box: high gear ratio and self-locking feature

    • Planetary gear box: compact design with high torque capacity

  • Answered by AI
  • Q2. Function of brake system?
  • Ans. 

    The brake system in a vehicle is responsible for slowing down or stopping the vehicle by converting kinetic energy into heat energy.

    • Converts kinetic energy into heat energy to slow down or stop the vehicle

    • Consists of components such as brake pads, rotors, calipers, and brake fluid

    • Uses friction between brake pads and rotors to create stopping force

    • Hydraulic pressure is applied to brake pads to engage them against the ro...

  • Answered by AI
Round 4 - HRĀ 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Thankyou šŸ™

ACC Interview FAQs

How many rounds are there in ACC Maintenance Engineer interview for experienced candidates?
ACC interview process for experienced candidates usually has 2 rounds. The most common rounds in the ACC interview process for experienced candidates are Resume Shortlist and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
Ā ā€¢Ā 603 Interviews
JK Cement Interview Questions
4.1
Ā ā€¢Ā 272 Interviews
Grasim Industries Interview Questions
4.0
Ā ā€¢Ā 215 Interviews
Shree Cement Interview Questions
3.8
Ā ā€¢Ā 163 Interviews
Dalmia Bharat Cement Interview Questions
4.0
Ā ā€¢Ā 148 Interviews
Ambuja Cements Interview Questions
3.9
Ā ā€¢Ā 113 Interviews
Star Cement Interview Questions
4.0
Ā ā€¢Ā 66 Interviews
JK Lakshmi Cement Interview Questions
3.9
Ā ā€¢Ā 63 Interviews
HIL Limited Interview Questions
4.1
Ā ā€¢Ā 62 Interviews
The Ramco Cements Interview Questions
4.2
Ā ā€¢Ā 57 Interviews
View all
ACC Maintenance Engineer Salary
based on 5 salaries
ā‚¹2.2 L/yr - ā‚¹5.6 L/yr
26% less than the average Maintenance Engineer Salary in India
View more details

ACC Maintenance Engineer Reviews and Ratings

based on 4 reviews

4.5/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

4.6

Salary

3.8

Job security

4.6

Company culture

3.8

Promotions

3.8

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
376 salaries
unlock blur

ā‚¹4 L/yr - ā‚¹13.8 L/yr

Deputy Manager
245 salaries
unlock blur

ā‚¹6.7 L/yr - ā‚¹21.9 L/yr

Manager
202 salaries
unlock blur

ā‚¹9.9 L/yr - ā‚¹34 L/yr

Senior Executive
168 salaries
unlock blur

ā‚¹2.8 L/yr - ā‚¹9 L/yr

Sales Executive
129 salaries
unlock blur

ā‚¹1.2 L/yr - ā‚¹5.6 L/yr

Explore more salaries
Compare ACC with

UltraTech Cement

4.2
Compare

JK Cement

4.1
Compare

Grasim Industries

4.0
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview