Filter interviews by
GSS SLD stands for Gas Supply System Single Line Diagram, used to illustrate the flow of gas in a system.
GSS SLD is a visual representation of the gas supply system, showing the components and their connections.
It helps in understanding the layout of the system and identifying potential issues or improvements.
Common components in a GSS SLD include gas compressors, filters, regulators, valves, and pipelines.
Color coding...
I applied via Company Website and was interviewed in Mar 2022. There were 3 interview rounds.
posted on 17 Jan 2015
posted on 26 Jan 2015
posted on 10 Sep 2015
I applied via Campus Placement
The number of juices a restaurant serves in a day varies depending on factors such as menu, customer demand, and seasonality.
The menu offerings and popularity of juices can impact the number served
Customer demand can fluctuate throughout the day and week
Seasonality can affect the availability and popularity of certain fruits and vegetables for juicing
The size and capacity of the restaurant's kitchen and staff can also
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 3 interviews
Interview experience
based on 27 reviews
Rating in categories
Senior Analyst
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Incharge
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Feedback Infrastructure Services
IL&FS Transportation Networks
GMR Group
Reliance Infrastructure