i
ABB
Filter interviews by
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Processing drive function involves analyzing data, coordinating with various departments, and ensuring timely delivery.
Analyze incoming sales orders to determine necessary actions
Coordinate with warehouse and shipping departments to ensure availability of products
Communicate with customers regarding order status and delivery timelines
Update sales order system with relevant information and track progress
Resolve any issu...
Sales orders are booked using transaction codes in SAP system.
Use transaction code VA01 to create a sales order
Enter customer details, material number, quantity, and other relevant information
Save the sales order after entering all necessary details
Use transaction code VA02 to change an existing sales order
Use transaction code VA03 to display a sales order
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
posted on 26 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 17 Feb 2024
I appeared for an interview in Aug 2023.
Total 30 attitude questions in 30 minutes.
1. Reasoning
2. Maths
3. English.
Diesel engines use compression ignition, while petrol engines use spark ignition. 4-stroke engines have separate intake, compression, power, and exhaust strokes, while 2-stroke engines combine intake and compression in one stroke and power and exhaust in another.
Diesel engines use compression ignition, while petrol engines use spark ignition.
4-stroke engines have separate intake, compression, power, and exhaust strokes...
posted on 18 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
I appeared for an interview in Jan 2017.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
I have been actively involved in sports since childhood, participating in various team sports and individual activities.
Played soccer for 10 years, competing at a regional level
Participated in track and field events in high school, specializing in long jump and hurdles
Currently enjoy hiking and rock climbing in my free time
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
It was easy if you have practice
Critical point of water is the temperature and pressure at which liquid and gas phases of water become indistinguishable.
Critical point of water is at 647 K temperature and 22.064 MPa pressure.
At critical point, water can exist as both liquid and gas phases simultaneously.
Above critical point, water cannot exist in liquid state regardless of pressure.
Critical point is important in chemical and industrial processes such...
Purification process of water involves removing impurities and contaminants to make it safe for consumption.
Physical processes like sedimentation, filtration, and distillation are used to remove impurities.
Chemical processes like chlorination and ozonation are used to kill bacteria and viruses.
Advanced technologies like reverse osmosis and ultraviolet radiation are also used for purification.
The quality of water after ...
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
Hi
I applied via Referral and was interviewed before Jan 2021. There were 4 interview rounds.
Grinding is a process of removing material from a workpiece using a grinding wheel. Multi-point cutting tools are tools with multiple cutting edges.
Grinding is commonly used in manufacturing to achieve tight tolerances and smooth finishes.
Multi-point cutting tools are used in machining operations to remove material from a workpiece.
Examples of multi-point cutting tools include drills, end mills, and reamers.
The number ...
5S, Kaizen, and 7QC tools are methodologies used in manufacturing to improve efficiency and quality.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
Kaizen is a continuous improvement philosophy that involves making small, incremental changes to processes and systems.
7QC tools are a set of quality control tools used to identify and solve problems, includi...
Grinding defects are common in manufacturing processes and can include chatter marks, burn marks, and surface cracks.
Chatter marks are caused by vibration during grinding and appear as a series of regular marks on the workpiece.
Burn marks are caused by excessive heat during grinding and appear as discolored areas on the workpiece.
Surface cracks can be caused by a variety of factors, including improper grinding techniqu...
Plunge grinding and through feed grinding are two types of grinding processes used in manufacturing.
Plunge grinding involves grinding a part by plunging it into the grinding wheel, creating a flat or tapered surface.
Through feed grinding involves feeding the part through the grinding wheels, creating a straight and smooth surface.
Plunge grinding is typically used for parts with complex shapes or contours, while through...
Kanban is a lean manufacturing system that uses visual cues to signal the need for production or movement of materials.
Kanban originated in Japan as a way to improve manufacturing efficiency.
It involves using cards or other visual cues to signal when materials or products are needed.
Kanban is often used in conjunction with just-in-time (JIT) manufacturing.
It can also be applied to other industries, such as software dev...
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Project Engineer
606
salaries
| ₹4.9 L/yr - ₹18.3 L/yr |
R&D Engineer
337
salaries
| ₹6.5 L/yr - ₹22.2 L/yr |
Financial Analyst
261
salaries
| ₹2 L/yr - ₹8.6 L/yr |
Design Engineer
241
salaries
| ₹1.2 L/yr - ₹10 L/yr |
Finance Specialist
198
salaries
| ₹2.8 L/yr - ₹7.5 L/yr |
Thermax Limited
Isgec Heavy Engineering
Kirloskar Oil Engines
Kirloskar Brothers