i
Aarvee Associates
Filter interviews by
I applied via Company Website and was interviewed before May 2022. There were 2 interview rounds.
Top trending discussions
posted on 25 Dec 2024
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
I applied via Naukri.com
According to the topic
Some projects needful for you
Presence of mind
Knowledge of me in this field
posted on 18 Sep 2020
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
The overall responsibility for highway work includes overseeing project progress, ensuring quality standards are met, and managing contractor billing.
Oversee project progress to ensure timelines are met
Ensure quality standards are maintained throughout the construction process
Manage contractor billing and ensure accurate invoicing
Coordinate with various stakeholders including engineers, contractors, and government agen...
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
posted on 31 May 2024
Using a soil compactor on GSB & WMM layers with a deadload of 12 tons or above can lead to excessive compaction and potential damage to the layers.
Excessive compaction can result in reduced permeability of the layers, affecting drainage.
The excessive force from the compactor can cause cracking or deformation in the layers.
It may also lead to uneven settlement and structural instability in the pavement.
Proper evaluation...
SMA layer is used in high speed expressways for its superior durability, rut resistance, and fatigue resistance.
SMA (Stone Matrix Asphalt) layer provides superior durability compared to traditional asphalt mixes.
SMA layer has excellent rut resistance, maintaining a smooth surface for high speed traffic.
The high binder content in SMA enhances fatigue resistance, reducing cracking and extending pavement life.
SMA mixtures...
posted on 22 Oct 2021
I was interviewed in Apr 2021.
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
A cross section of a road is a vertical slice through the road showing the various layers and components.
A cross section typically includes the road surface, base course, subbase, and natural subgrade.
It helps engineers understand the composition of the road and plan for construction or maintenance.
Cross sections are used to determine the appropriate materials and thickness for each layer of the road.
Examples of cross ...
based on 9 reviews
Rating in categories
Assistant Manager
331
salaries
| ₹3 L/yr - ₹11.1 L/yr |
Field Engineer
131
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Manager
121
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Site Engineer
89
salaries
| ₹2.7 L/yr - ₹7 L/yr |
Civil Engineer
78
salaries
| ₹2.2 L/yr - ₹7.8 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company