bbs engineer

filter-iconFilter interviews by

bbs engineer Interview Questions and Answers

Updated 2 Jul 2024

Popular Companies

search-icon

Q1. How to control wastage of steel

Ans.

Wastage of steel can be controlled by proper planning, inventory management, and efficient usage.

  • Implementing a strict inventory management system to avoid overstocking and understocking of steel

  • Ensuring proper handling and storage of steel to prevent damage and corrosion

  • Using advanced cutting and welding techniques to minimize scrap and offcuts

  • Encouraging employees to adopt a culture of waste reduction and efficient usage

  • Regularly monitoring and analyzing production processe...read more

Q2. What is the confinement and non-confinement zone in column?

Ans.

Confinement zone in a column refers to the region where the concrete is fully confined by the reinforcement, while non-confinement zone is where the concrete is not fully confined.

  • Confinement zone helps in enhancing the strength and ductility of the column.

  • Non-confinement zone is more susceptible to buckling and failure under lateral loads.

  • Examples of confinement elements include spiral reinforcement or ties in a column.

  • Non-confinement zone is typically found near the top and...read more

bbs engineer Interview Questions and Answers for Freshers

illustration image

Q3. what is role of BBS Engineer

Ans.

BBS Engineer is responsible for implementing and maintaining Behavior-Based Safety programs to ensure a safe work environment.

  • Develop and implement BBS programs

  • Conduct safety audits and inspections

  • Train employees on safety procedures

  • Analyze data to identify safety trends

  • Collaborate with management to improve safety culture

Q4. Checklist of Bar Bending Schedule

Ans.

A checklist for Bar Bending Schedule includes various items to ensure accuracy and completeness.

  • Check the dimensions and reinforcement details of structural elements

  • Verify the bending shapes and angles of bars

  • Ensure proper spacing and lap lengths of bars

  • Check the quantity and size of bars required

  • Verify the location and orientation of bars

  • Ensure compliance with design and construction standards

Are these interview questions helpful?

Q5. Unit weight of 32mm dia bar

Ans.

The unit weight of 32mm dia bar is 6.31 kg/m.

  • The unit weight of steel bars can be calculated using the formula: D^2/162.25, where D is the diameter of the bar in mm.

  • For 32mm dia bar, the unit weight is calculated as 32^2/162.25 = 6.31 kg/m.

  • Unit weight is an important factor in construction as it helps in determining the weight of the structure and the amount of material required.

Q6. How to derive unit weight of square bar?

Ans.

Unit weight of square bar can be derived by multiplying the cross-sectional area of the bar by the density of the material.

  • Calculate the cross-sectional area of the square bar by squaring the side length of the bar.

  • Determine the density of the material the square bar is made of.

  • Multiply the cross-sectional area by the density to get the unit weight of the square bar.

  • Unit weight = Cross-sectional area x Density

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. How to calculate Beam BBS

Ans.

Beam BBS can be calculated by determining the required reinforcement as per design drawings and specifications.

  • Review design drawings and specifications to determine required reinforcement

  • Calculate the total length of each type of reinforcement bars needed

  • Determine the spacing and arrangement of bars as per design requirements

  • Calculate the total weight of reinforcement bars required for the beam

Q8. What is rollin margin

Ans.

Rolling margin is a measure of a company's profitability that shows how much of each dollar in revenue is turned into profit after accounting for variable costs.

  • Rolling margin is calculated by subtracting variable costs from revenue and dividing by revenue.

  • It helps in analyzing the efficiency of a company in managing its variable costs.

  • A higher rolling margin indicates better profitability.

  • For example, if a company has revenue of $100,000 and variable costs of $60,000, the ro...read more

bbs engineer Jobs

Hiring BBS Engineer | Delhi / NCR Location 3-5 years
RSB Infrastructure Pvt. Ltd.
3.8
Delhi/Ncr
BBS Engineer 5-10 years
Elite Engineering & Construction (EEC)
3.5
Bangalore / Bengaluru
BBS Engineer( civil) 5-6 years
Aar Cee Contracts
4.1
₹ 4 L/yr - ₹ 6 L/yr
Gurgaon / Gurugram
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Recently Viewed
JOBS
Browse jobs
Discover jobs you love
LIST OF COMPANIES
Kandhari Beverages
Overview
LIST OF COMPANIES
Walplast Products
Overview
INTERVIEWS
DHLI
No Interviews
PHOTOS
Manomav Engineers
No Photos
COMPANY BENEFITS
Manomav Engineers
No Benefits
SALARIES
Manomav Engineers
No Salaries
LIST OF COMPANIES
Manomav Engineers
Overview
LIST OF COMPANIES
Meghmani Organics
Overview
REVIEWS
Manomav Engineers
No Reviews
bbs engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter