I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
Devise a marketing plan for one of the top channels
Top trending discussions
posted on 20 Jul 2023
I applied via Approached by Company and was interviewed in Jan 2023. There were 3 interview rounds.
I will address process setting issues by analyzing root causes, implementing corrective actions, and monitoring progress.
Identify the root cause of the process setting issue
Implement corrective actions to address the issue
Monitor progress and make adjustments as needed
Communicate with team members to ensure understanding and alignment
By prioritizing tasks, delegating effectively, and utilizing technology, I can execute tasks with minimum resources.
Prioritize tasks based on importance and urgency
Delegate tasks to team members based on their strengths and workload
Utilize technology and automation tools to streamline processes and save time
Optimize resource allocation by cross-training team members for flexibility
Implement lean principles to eliminate
There are various types of engines used in construction equipment.
Diesel engines are commonly used in construction equipment due to their high torque and fuel efficiency.
Gasoline engines are also used in smaller construction equipment.
Electric engines are becoming more popular for their low noise and zero emissions.
Hybrid engines combine the benefits of both diesel and electric engines.
Some construction equipment may a...
I was interviewed before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
I was interviewed before Mar 2017.
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Assistant Manager
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Producer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Video Editor
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Times Group
Hindustan Times
NDTV Network
Network 18