Upload Button Icon Add office photos

Filter interviews by

Zamil Infra Assistant Plant Manager Interview Questions, Process, and Tips

Updated 9 Jan 2023

Zamil Infra Assistant Plant Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
-

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

What is the problem in ipms, main fault in ipms.

Round 3 - Technical 

(4 Questions)

  • Q1. Main isse in ipms, how is solve the problem
  • Ans. 

    The main issue in IPMS is identifying and resolving problems.

    • IPMS (Integrated Pest Management System) is a comprehensive approach to pest control that involves identifying and preventing pest problems before they occur.

    • The main issue in IPMS is identifying and resolving problems that may arise during the implementation of the system.

    • This can involve monitoring pest populations, identifying potential pest habitats, and ...

  • Answered by AI
  • Q2. What is the ipms fiction
  • Ans. 

    IPMS Fiction does not exist as a term or concept.

    • There is no known definition or reference to IPMS Fiction.

    • It is possible that the interviewer may have misspoken or meant to ask a different question.

    • It is important to clarify any confusion or misunderstandings during an interview.

  • Answered by AI
  • Q3. What is the automation
  • Ans. 

    Automation refers to the use of technology to perform tasks without human intervention.

    • Automation can increase efficiency and productivity in various industries, such as manufacturing and transportation.

    • Examples of automation include robotic assembly lines, self-driving cars, and automated inventory management systems.

    • Automation can also lead to job displacement and requires careful consideration of ethical and social

  • Answered by AI
  • Q4. What is the DG fail to start alarm
  • Ans. 

    DG fail to start alarm is an alarm that indicates the failure of a diesel generator to start.

    • The alarm is triggered when the diesel generator fails to start after a certain number of attempts.

    • It is an important safety feature that ensures the generator is functioning properly.

    • The alarm can be caused by a variety of factors such as low fuel levels, battery failure, or mechanical issues.

    • The alarm is typically accompanied...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Deeply think about the necessary to candidate... Why he/she needed to job..

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There were 4 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Question from relevant stream.
Round 2 - One-on-one 

(1 Question)

  • Q1. Personality test
Round 3 - Case Study 

Past case study and how you slove it

Round 4 - HR 

(1 Question)

  • Q1. Some assessment and salary discussion
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is your job role
  • Q2. Are you seeking for a new job role if yes why
Round 2 - Technical 

(3 Questions)

  • Q1. What is a critical path
  • Ans. 

    The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.

    • Identifying the critical path helps in determining the minimum time needed to complete a project.

    • It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.

    • Activities on the critical path are often marked with a double line ...

  • Answered by AI
  • Q2. How will you plan a 50 Mwp project
  • Ans. 

    I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.

    • Conduct feasibility studies to assess site suitability and potential challenges

    • Create a detailed project timeline outlining key milestones and deadlines

    • Secure necessary permits and approvals from local authorities

    • Sou...

  • Answered by AI
  • Q3. What is the difference between msp and primavera
  • Ans. 

    MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.

    • MSP is developed by Microsoft, while Primavera is developed by Oracle.

    • MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.

    • MSP is known for its user-friendly interface and ease of use, while Primavera is known f...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(7 Questions)

  • Q1. Previous job roles & responsibilitys
  • Q2. Background verification
  • Q3. Salary discussion
  • Q4. Briefing about RenewSys
  • Q5. Documents verification
  • Q6. Finally selected
  • Q7. Offer letter released

Interview Preparation Tips

Interview preparation tips for other job seekers - NC
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. About work experience and education details.
  • Q2. Preparedness for joining.
  • Q3. Sallary details.
  • Q4. Your expectations
  • Q5. Reason for joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Join this company only if you are ready to learn new things and ready to take responsibility.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Boiler DCS operation
Round 3 - HR 

(1 Question)

  • Q1. Family background and salary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Ask basic questions about your work profile.
Round 2 - Technical 

(1 Question)

  • Q1. Ask basic questions about your work profile.
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and working profile details.

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basic and technical questions in sub station and transmission line

Interview Preparation Tips

Interview preparation tips for other job seekers - good knowledge in sub station and transmission line

I applied via Company Website and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 3 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why should we hire you?
  • Q3. Why are you looking for a change?
  • Q4. What are your strengths and weaknesses?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Trust yourself,
If you can't no one can✌
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I was interviewed before Jul 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary, reason for leaving the previous job etc
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical, industry questions. High level

Interview Preparation Tips

Interview preparation tips for other job seekers - Thorough subject knowledge

Zamil Infra Interview FAQs

How many rounds are there in Zamil Infra Assistant Plant Manager interview?
Zamil Infra interview process usually has 3 rounds. The most common rounds in the Zamil Infra interview process are Resume Shortlist, Group Discussion and Technical.
What are the top questions asked in Zamil Infra Assistant Plant Manager interview?

Some of the top questions asked at the Zamil Infra Assistant Plant Manager interview -

  1. Main isse in ipms, how is solve the prob...read more
  2. What is the DG fail to start al...read more
  3. What is the automat...read more

Tell us how to improve this page.

Zamil Infra Assistant Plant Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

R.K.M Powergen Interview Questions
4.0
 • 19 Interviews
Renewsys India Interview Questions
4.0
 • 12 Interviews
SHV Energy Interview Questions
3.8
 • 12 Interviews
View all

Fast track your campus placements

View all

Zamil Infra Assistant Plant Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accounts & Finance Manager
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Data Analyst
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy General Manager Finance & Accounts
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Zamil Infra with

Dhoot Transmission

3.7
Compare

R.K.M Powergen

4.0
Compare

SHV Energy

3.8
Compare

New Allenberry Works

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview