Filter interviews by
I appeared for an interview before Apr 2021.
Round duration - 90 minutes
Round difficulty - Medium
This round had 3 coding questions of Medium to Hard level of difficulty.
Given an integer N
representing the number of pairs of parentheses, find all the possible combinations of balanced parentheses using the given number of pairs.
Generate all possible combinations of balanced parentheses for a given number of pairs.
Use recursion to generate all possible combinations of balanced parentheses.
Keep track of the number of open and close parentheses used in each combination.
Return the valid combinations as an array of strings.
You are given a long type array/list ARR
of size N
, representing an elevation map. The value ARR[i]
denotes the elevation of the ith
bar. Your task is to determine th...
Calculate the total amount of rainwater that can be trapped between given elevations in an array.
Iterate through the array and calculate the maximum height on the left and right of each bar.
Calculate the amount of water that can be trapped at each bar by taking the minimum of the maximum heights on the left and right.
Sum up the trapped water at each bar to get the total trapped water for the entire array.
You are given a grid containing oranges where each cell of the grid can contain one of the three integer values:
Find the minimum time required to rot all fresh oranges adjacent to rotten oranges.
Create a queue to store the coordinates of rotten oranges and perform BFS to rot adjacent fresh oranges.
Track the time taken to rot all fresh oranges and return -1 if not all fresh oranges can be rotten.
Update the grid with the new state of oranges after each second.
Handle edge cases such as empty grid or no fresh oranges present.
Example...
Round duration - 60 Minutes
Round difficulty - Medium
This was a standard DS/Algo round where I was given 2 questions to solve under 60 minutes. I was able to come up with the optimal approach for both the questions and then at the end of the interview I was also asked the famous Die Hard Water Puzzle.
Design a queue data structure following the FIFO (First In First Out) principle using only stack instances.
Your task is to complete predefined functions t...
Implement a queue using stacks following FIFO principle.
Use two stacks to simulate a queue.
For enQueue operation, push elements onto stack1.
For deQueue operation, if stack2 is empty, pop all elements from stack1 and push onto stack2, then pop from stack2.
For peek operation, if stack2 is empty, pop all elements from stack1 and push onto stack2, then return top of stack2.
For isEmpty operation, check if both stack1 and st...
You are provided with 'N' intervals, each containing two integers denoting the start time and end time of the interval.
Your task is to merge all overlapping intervals a...
Merge overlapping intervals and return sorted list of merged intervals by start time.
Sort the intervals based on start time.
Iterate through intervals and merge overlapping ones.
Return the merged intervals in sorted order.
Round duration - 60 Minutes
Round difficulty - Medium
This round had 2 coding questions - first one related to Binary Tree and the second one was a simple question from Bit Manipulation. This was followed by some questions from OOPS.
You are given a Binary Tree, and you need to determine the length of the diameter of the tree.
The diameter of a binary tree is the length of the longest path betwe...
The task is to find the diameter of a binary tree, which is the length of the longest path between any two end nodes in the tree.
Traverse the tree to find the longest path between two nodes.
Keep track of the maximum diameter found during traversal.
The diameter may not necessarily pass through the root node.
Consider both left and right subtrees while calculating the diameter.
Example: For input 1 2 3 4 -1 5 6 -1 7 -1 -1
Determine if it is possible to reorder the digits of a given integer 'N' such that the resulting number is a power of two. The leading digit must not be zero.
The fir...
The problem involves determining if it is possible to reorder the digits of a given integer to form a power of 2.
Iterate through all possible permutations of the digits of the given integer.
Check if any of the permutations form a power of 2.
Return 1 if a valid permutation is found, else return 0.
Advantages of OOP include code reusability, modularity, and easier maintenance.
Code reusability: Objects can be reused in different parts of the program, reducing redundancy.
Modularity: OOP allows for breaking down complex problems into smaller, more manageable parts.
Easier maintenance: Changes to one part of the codebase do not necessarily affect other parts, making maintenance easier.
Encapsulation: Data hiding and ab...
Access specifiers define the level of access to class members in Object-Oriented Programming.
Access specifiers include public, private, protected, and default
Public members are accessible from outside the class
Private members are only accessible within the class
Protected members are accessible within the class and its subclasses
Default access is when no access specifier is specified
Round duration - 30 Minutes
Round difficulty - Easy
This was my last round and I hoped it to go good just like the other rounds. The interviewer was very straight to point
and professional. The interview lasted for 30 minutes.
Tip 1 : Must do Previously asked Interview as well as Online Test Questions.
Tip 2 : Go through all the previous interview experiences from Codestudio and Leetcode.
Tip 3 : Do at-least 2 good projects and you must know every bit of them.
Tip 1 : Have at-least 2 good projects explained in short with all important points covered.
Tip 2 : Every skill must be mentioned.
Tip 3 : Focus on skills, projects and experiences more.
Queue can be implemented using two stacks by maintaining the order of elements in the stacks.
Create two stacks, let's call them stack1 and stack2
When an element is enqueued, push it to stack1
When an element is dequeued, pop all elements from stack1 and push them to stack2
Pop the top element from stack2 and return it as the dequeued element
If stack2 is empty, repeat step 3
To get the front element of the queue, peek the
Left join returns all records from left table and matching records from right table. Full outer join returns all records from both tables.
Left join is used to combine two tables based on a common column.
In left join, all records from the left table are returned along with matching records from the right table.
If there is no match in the right table, NULL values are returned.
Example: SELECT * FROM table1 LEFT JOIN table...
Magic functions are special methods in PHP that start with __. Autoloading is a way to automatically load classes.
Magic functions are used to handle certain events in PHP, such as object creation or property access.
Autoloading allows PHP to automatically load classes when they are needed, without requiring manual includes.
Magic functions can be used in conjunction with autoloading to dynamically load classes or handle
Given three sorted arrays, find common elements.
Create three pointers to traverse each array
Compare the elements at the pointers and move the pointer of the smallest element
If all pointers point to the same element, add it to the result and move all pointers
Repeat until any pointer reaches the end of its array
Check if a number is a power of 2 or not.
A power of 2 has only one bit set in its binary representation.
Use bitwise AND operator to check if the number is a power of 2.
If n is a power of 2, then n & (n-1) will be 0.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
Good level question. I have qualified for the next round
Basic to intermediate question, Cleared the test
I appeared for an interview before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
based on 2 reviews
Rating in categories
Php and Web Developer
4
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Amazon Sellers Services
Primus Global Technologies
GAMMON INDIA
Practo