I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.
All mathmatics and reasoning and logical
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Explanation of how to calculate OEE, use 7QC tools, TMP, productivity, team building, manpower management, SAP module, inventory control, and scrap reduction.
OEE calculation involves multiplying availability, performance, and quality percentages
7QC tools include Pareto chart, fishbone diagram, control chart, etc.
TMP stands for Total Maintenance Productivity and measures maintenance efficiency
Productivity can be calcula...
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
Yazaki interview questions for popular designations
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
Get interview-ready with Top Yazaki Interview Questions
I applied via Walk-in and was interviewed in Mar 2021. There were 6 interview rounds.
Stores involvement in the process from raw materials entry to FG exit.
Raw materials received and inspected for quality and quantity.
Materials stored in designated areas based on their characteristics.
Materials issued to production based on production plan.
Production process carried out as per standard operating procedures.
Finished goods inspected for quality and quantity.
Finished goods stored in designated areas.
Goods ...
The full process involves receiving, storing, and selling products in a retail store.
Receiving products from suppliers
Checking for quality and quantity
Storing products in appropriate locations
Maintaining inventory levels
Pricing and displaying products
Assisting customers with purchases
Processing payments
Maintaining store cleanliness and organization
I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.
Top trending discussions
The duration of Yazaki interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 161 interviews
Interview experience
based on 2.3k reviews
Rating in categories
Junior Engineer
511
salaries
| ₹1.5 L/yr - ₹5.3 L/yr |
Assistant Manager
392
salaries
| ₹4.8 L/yr - ₹13.8 L/yr |
Engineer
313
salaries
| ₹1.8 L/yr - ₹7.4 L/yr |
Senior Engineer
298
salaries
| ₹3.8 L/yr - ₹10 L/yr |
Production Engineer
296
salaries
| ₹1.2 L/yr - ₹7 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres