Parameters for material planning include demand forecasting, lead time, inventory levels, and production capacity.
Demand forecasting helps determine the quantity and timing of materials needed.
Lead time refers to the time it takes for materials to be delivered after placing an order.
Inventory levels need to be monitored and managed to ensure sufficient stock without excessive holding costs.
Production capacity determine...
I appeared for an interview in Feb 2023.
Fade system is a method used in injection molding to gradually reduce the pressure and speed of the injection process. Core and cavity are the two halves of a mold used in injection molding. To plate mold is a type of mold where a metal plate is used to create the mold cavity. Pitch diameter of a bolt is the diameter of an imaginary cylinder that passes through the threads of the bolt.
Fade system is used in injection m...
A single cavity mould is a type of mould that only produces one part per cycle.
Single cavity moulds are used for low volume production.
They are simpler and cheaper compared to multi-cavity moulds.
Examples include prototype moulds and custom moulds for unique parts.
Jigs are used to guide cutting tools and fixtures hold the workpiece in place during machining operations.
Jigs are used to guide cutting tools, while fixtures hold the workpiece in place
Jigs are used for drilling, reaming, and tapping operations, while fixtures are used for milling, grinding, and turning operations
Jigs are more complex and expensive than fixtures
Jigs are often used for mass production, while fixtures a...
The nominal diameter of a bolt refers to the size of the bolt shaft, excluding the threads.
Nominal diameter is the diameter of the bolt shaft, not including the threads
It is typically measured in millimeters or inches
For example, a bolt with a nominal diameter of 10mm has a shaft diameter of 10mm
I applied via Referral and was interviewed before Jan 2024. There was 1 interview round.
Waste in production department refers to any activity that does not add value to the final product.
Overproduction - producing more than needed
Waiting - idle time between production steps
Defects - errors that require rework
Transportation - unnecessary movement of materials
Inventory - excess raw materials or finished goods
Motion - unnecessary movement of workers
Overprocessing - using more resources than necessary
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Easy and basic questions
I am open to discussing a competitive salary based on industry standards and my skills.
Research industry standards: For example, entry-level positions in my field typically range from $X to $Y.
Consider my skills and qualifications: I have completed relevant internships and projects that add value.
Emphasize flexibility: I am willing to negotiate based on the overall compensation package, including benefits.
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 7 interview rounds.
Top trending discussions
I appeared for an interview before May 2016.
based on 8 interview experiences
Difficulty level
Duration
based on 126 reviews
Rating in categories
Team Lead
41
salaries
| ₹2.3 L/yr - ₹8.6 L/yr |
Design Engineer
37
salaries
| ₹4.5 L/yr - ₹10.3 L/yr |
CAE Analyst
20
salaries
| ₹3.6 L/yr - ₹9.5 L/yr |
Assistant Manager
17
salaries
| ₹9 L/yr - ₹22 L/yr |
Senior Engineer
17
salaries
| ₹8.2 L/yr - ₹13 L/yr |
Bosch
Samvardhana Motherson Group
Yazaki
Delphi TVS