Filter interviews by
Top trending discussions
posted on 9 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
posted on 16 May 2024
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2023. There were 3 interview rounds.
Electonics and Communication
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
Need of regulations in E- commerce sector.
Logistics sector faces challenges such as high transportation costs, supply chain disruptions, and increasing customer demands.
High transportation costs due to fuel prices, tolls, and taxes
Supply chain disruptions caused by natural disasters, political instability, and pandemics
Increasing customer demands for faster delivery, real-time tracking, and personalized services
Shortage of skilled labor and technological advan...
To improve logos sector, focus on creating unique and memorable designs that accurately represent the brand.
Conduct thorough research on the brand and its target audience before designing the logo
Simplify the design to make it easily recognizable and memorable
Use appropriate colors and typography to convey the brand's personality
Ensure the logo is versatile and can be used across different mediums and platforms
Consider...
posted on 12 Oct 2021
I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 10 Sep 2020
I applied via Referral and was interviewed before Sep 2019. There were 4 interview rounds.
I will prioritize and delegate tasks, find cost-effective solutions, and communicate effectively with the team.
Prioritize tasks based on urgency and importance
Delegate tasks to team members based on their strengths and workload
Find cost-effective solutions by analyzing data and brainstorming with the team
Communicate effectively with the team to ensure everyone is on the same page and working towards the same goal
Regula
Interview experience
Engineer
20
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Assistant Manager
18
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Junior Engineer
15
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Quality Engineer
14
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Production Engineer
11
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Reliance Industries
TCS
Infosys
Wipro