i
XS CAD India Private Limited
Filter interviews by
To size a transformer, calculate the required kVA based on load requirements and select a transformer with a suitable kVA rating.
Calculate the total load in kVA by adding up the individual loads in the system.
Consider the diversity factor to account for simultaneous operation of loads.
Select a transformer with a kVA rating equal to or greater than the calculated total load.
Take into account future expansion and efficie...
Voltage drop can be calculated using Ohm's Law and the formula V = I * R
Calculate the current flowing through the circuit (I)
Determine the resistance of the circuit (R)
Use the formula V = I * R to calculate the voltage drop (V)
Top trending discussions
posted on 23 Jan 2025
I was interviewed in Dec 2024.
Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.
Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity
Conduct thorough inspections to identify potential issues before they escalate
Keep detailed records of maintenance activities and equipment history
Train staff on proper maintenance procedures and safety protocols
Uti...
To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.
Perform regular inspections to check for signs of corrosion, leaks, or damage
Ensure proper charging by following manufacturer's guidelines and avoiding overcharging
Control temperature to prevent overheating or freezing, which can reduce battery life
Monitor electrolyte levels and top up ...
I was interviewed in Dec 2022.
posted on 15 Feb 2024
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
posted on 29 Apr 2022
A.C to D.C. conversion can be done using a rectifier circuit.
A rectifier circuit can be used to convert A.C. to D.C.
The rectifier circuit can be half-wave or full-wave.
Half-wave rectifier only allows half of the A.C. wave to pass through, while full-wave rectifier allows the entire wave.
The rectifier circuit can be made using diodes.
The output of the rectifier circuit is not smooth and requires filtering using capacito...
posted on 25 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
posted on 21 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
Interview experience
based on 1 review
Rating in categories
Mumbai Suburban
5-10 Yrs
Not Disclosed
BIM Modeller
23
salaries
| ₹1 L/yr - ₹5.8 L/yr |
Architect
19
salaries
| ₹3 L/yr - ₹5.6 L/yr |
MEP Coordinator
17
salaries
| ₹2.4 L/yr - ₹5.3 L/yr |
3D Visualiser
14
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Bim MEP Modeler
13
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Tesla Outsourcing Services
Advenser Engineering Services
United-BIM
Bim Global Solutions