WPIL
10+ Fortis Healthcare Interview Questions and Answers
Q1. Different types of pipes
There are various types of pipes used in construction such as PVC, HDPE, GI, CPVC, PEX, etc.
PVC pipes are commonly used for water supply and drainage systems
HDPE pipes are used for gas and water supply systems
GI pipes are used for water supply and irrigation systems
CPVC pipes are used for hot and cold water supply systems
PEX pipes are used for radiant heating and cooling systems
Q2. Specification of trench
Trench specification includes depth, width, slope, and backfill material.
Depth of trench should be as per design and should not exceed the specified limit.
Width of trench should be sufficient for workers to move and work comfortably.
Slope of trench should be maintained to prevent collapse and ensure worker safety.
Backfill material should be of appropriate quality and compacted properly.
Trench should be properly marked and barricaded for safety purposes.
Q3. Hydrotesting of pipeline
Hydrotesting is a process of testing pipelines for leaks and strength by filling them with water or other fluids.
The pipeline is filled with water or other fluids under pressure to check for leaks.
The pressure is maintained for a specified duration to check the strength of the pipeline.
The test is conducted before the pipeline is put into service to ensure its integrity.
Hydrotesting is also done periodically to check for any damage or corrosion in the pipeline.
The test is con...read more
Q4. what is the Code for BBS
The Code for BBS is a unique identifier used in construction projects to track and manage building components.
BBS stands for Bar Bending Schedule, which is a list of reinforcement bars with their sizes, quantities, and placement in a structural element.
The Code for BBS helps project managers ensure that the correct reinforcement is used in construction according to design specifications.
It is essential for maintaining structural integrity and safety of the building.
Q5. WTP structure & Hydrolic Diagram
WTP structure & Hydraulic Diagram involves understanding the layout and components of a water treatment plant.
Water treatment plant (WTP) structures typically include intake structures, treatment units, storage tanks, and distribution systems.
Hydraulic diagrams show the flow of water through the plant, including pumps, pipes, valves, and other equipment.
Understanding the WTP structure and hydraulic diagram is crucial for ensuring efficient water treatment processes and system...read more
Q6. Process definition of WTP
WTP stands for Work Breakdown Structure (WBS), Task Dependencies, and Project Schedule
Work Breakdown Structure (WBS) involves breaking down the project into smaller, manageable tasks
Task Dependencies determine the sequence in which tasks need to be completed
Project Schedule outlines the timeline for completing each task and the overall project
Q7. Type of critical structures you do??
We specialize in critical structures for industrial, commercial and residential projects.
We design and construct critical structures for various industries such as oil and gas, power plants, and chemical plants.
We also build critical structures for commercial buildings such as hospitals, data centers, and airports.
In residential projects, we focus on building structures that can withstand natural disasters such as earthquakes and hurricanes.
Our team has expertise in designing...read more
Q8. Code for Measurement
Code for Measurement is a system of rules for assigning numbers to physical quantities.
Code for Measurement is essential for standardizing measurements across different industries.
Examples include the International System of Units (SI) for scientific measurements and the US customary system for everyday measurements.
It helps ensure consistency and accuracy in measurements, facilitating communication and comparison of data.
Q9. What is assemble
Assembling is the process of putting together various parts to create a finished product or structure.
Assembling involves fitting and joining different components to form a complete unit.
It requires following instructions and using tools to connect parts in the correct order.
Examples include assembling furniture, machinery, and electronics.
Assembling may also involve testing and adjusting the finished product to ensure it functions properly.
Q10. PPE's importance
PPE is essential for protecting workers from hazards in the workplace.
PPE helps prevent injuries and illnesses by creating a barrier between the worker and potential hazards.
Examples of PPE include helmets, gloves, safety glasses, and earplugs.
Employers are responsible for providing appropriate PPE and ensuring workers are trained on how to use it correctly.
Regular inspections and maintenance of PPE are crucial to ensure its effectiveness.
PPE should be worn in conjunction wit...read more
Top HR Questions asked in Fortis Healthcare
Interview Process at Fortis Healthcare
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month