The number of engineering documents processed in an EPC project varies depending on the project size and complexity.
The number of engineering documents processed in an EPC project can range from a few hundred to several thousand.
It depends on the scope of the project, the number of disciplines involved, and the duration of the project.
For example, a small EPC project may involve processing around 500 engineering docume...
The role of a Document Controller in Multinational EPC companies is to manage and control all project documents.
Maintain document control procedures
Ensure all documents are properly formatted and stored
Track and manage document revisions
Coordinate with project teams to ensure timely submission of documents
Ensure compliance with company and industry standards
Provide support during audits and inspections
The first step of Engineering and Vendor Document process is to identify the required documents and their formats.
Identify the required documents for the project
Determine the format and standard for each document
Create a document register to track all documents
Establish a document control system to manage the documents
Communicate the document requirements to vendors and contractors
Vendor documents are managed through a process that involves review, approval, and tracking.
Vendor documents are received and reviewed for completeness and accuracy.
Documents are then approved by the relevant parties, such as the project manager or engineering team.
Once approved, documents are tracked and stored in a central repository for easy access and retrieval.
Examples of vendor documents include equipment specifi...
The process of submitting engineering drawings to clients involves several steps.
Review the drawings for accuracy and completeness
Obtain approval from the relevant parties
Compile the drawings into a package
Submit the package to the client
Track the progress of the submission and follow up as necessary
TBE stands for Technical Bid Evaluation and TQ stands for Technical Query. They are used in EPC projects for vendor selection and clarification of technical issues.
TBE is a process of evaluating technical bids submitted by vendors to ensure that they meet the project requirements.
TQ is a formal request for clarification on technical issues related to the project.
TBE and TQ are important tools for vendor selection and c...
posted on 29 Jan 2022
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
The number of engineering documents processed in an EPC project varies depending on the project size and complexity.
The number of engineering documents processed in an EPC project can range from a few hundred to several thousand.
It depends on the scope of the project, the number of disciplines involved, and the duration of the project.
For example, a small EPC project may involve processing around 500 engineering docume...
The role of a Document Controller in Multinational EPC companies is to manage and control all project documents.
Maintain document control procedures
Ensure all documents are properly formatted and stored
Track and manage document revisions
Coordinate with project teams to ensure timely submission of documents
Ensure compliance with company and industry standards
Provide support during audits and inspections
The first step of Engineering and Vendor Document process is to identify the required documents and their formats.
Identify the required documents for the project
Determine the format and standard for each document
Create a document register to track all documents
Establish a document control system to manage the documents
Communicate the document requirements to vendors and contractors
Vendor documents are managed through a process that involves review, approval, and tracking.
Vendor documents are received and reviewed for completeness and accuracy.
Documents are then approved by the relevant parties, such as the project manager or engineering team.
Once approved, documents are tracked and stored in a central repository for easy access and retrieval.
Examples of vendor documents include equipment specifi...
The process of submitting engineering drawings to clients involves several steps.
Review the drawings for accuracy and completeness
Obtain approval from the relevant parties
Compile the drawings into a package
Submit the package to the client
Track the progress of the submission and follow up as necessary
TBE stands for Technical Bid Evaluation and TQ stands for Technical Query. They are used in EPC projects for vendor selection and clarification of technical issues.
TBE is a process of evaluating technical bids submitted by vendors to ensure that they meet the project requirements.
TQ is a formal request for clarification on technical issues related to the project.
TBE and TQ are important tools for vendor selection and c...
Senior Engineer
112
salaries
| ₹4 L/yr - ₹9 L/yr |
Assistant Manager
105
salaries
| ₹5.1 L/yr - ₹13 L/yr |
Trainee
105
salaries
| ₹1.1 L/yr - ₹2.5 L/yr |
Quality Engineer
62
salaries
| ₹1.5 L/yr - ₹5.6 L/yr |
Team Member
58
salaries
| ₹2.8 L/yr - ₹4.6 L/yr |
Larsen & Toubro Limited
Tata Projects
BHEL
Thermax Limited