Filter interviews by
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
Designing basics character and methods
Top trending discussions
posted on 10 May 2018
I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
Flow transmitter senses flow and transmits signal to controller in selected range.
Use a flow transmitter that is capable of sensing flow and transmitting a signal.
Connect the flow transmitter to the controller using appropriate wiring and communication protocols.
Configure the flow transmitter to operate within the desired range.
Ensure proper calibration of the flow transmitter to accurately measure and transmit flow da...
I applied via Referral and was interviewed in Mar 2018. There were 5 interview rounds.
I applied via Approached by company and was interviewed before Feb 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jul 2021. There were 4 interview rounds.
Thermal background required to crack this down
General topics on discussion,
I applied via Approached by Company and was interviewed in Oct 2017. There were 6 interview rounds.
The process of tower foundation involves several steps that are carried out day by day.
Day 1: Site preparation and layout survey
Day 2: Excavation for foundation
Day 3: Reinforcement placement
Day 4: Formwork installation
Day 5: Concrete pouring
Day 6: Curing of concrete
Day 7: Removal of formwork
Day 8: Quality inspection and testing
Day 9: Backfilling around the foundation
Day 10: Final inspection and documentation
Cube mould size refers to the dimensions of the mould used to cast concrete cubes for testing.
Cube moulds are typically made of steel or cast iron.
The most common cube mould size used in construction is 150mm x 150mm x 150mm.
Other sizes like 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used depending on the requirements.
Cube moulds have removable base plates to facilitate easy removal of the hardened conc...
Quality points at the pouring time of concrete include proper mix proportions, correct placement, adequate compaction, and appropriate curing.
Proper mix proportions ensure the desired strength and durability of the concrete.
Correct placement involves placing the concrete in the designated location without segregation or excessive bleeding.
Adequate compaction ensures that there are no voids or air pockets in the concret...
Sloped cutting refers to the excavation of soil or rock at an inclined angle to create a slope or incline.
Sloped cutting is commonly used in construction projects to create roadways, railways, or canals on hilly terrains.
It involves removing the excess material from a higher elevation to a lower elevation, forming a sloping surface.
The angle of the slope is determined based on factors such as soil stability, desired gr...
Assistant Manager
118
salaries
| ₹5.1 L/yr - ₹14.6 L/yr |
Trainee
101
salaries
| ₹1.1 L/yr - ₹2.5 L/yr |
Senior Engineer
98
salaries
| ₹4 L/yr - ₹9 L/yr |
Quality Engineer
62
salaries
| ₹1.5 L/yr - ₹5.6 L/yr |
Team Member
60
salaries
| ₹2.8 L/yr - ₹5 L/yr |
Thermax Limited
Cummins
ABB
Isgec Heavy Engineering