Round 1 - One-on-one 

(1 Question)

  • Q1. About fmea, pcp, pfd

Interview Questionnaire 

1 Question

  • Q1. Bases on previous experience

Senior Production Engineer Interview Questions Asked at Other Companies

Q1. What are different IS codes follow to fabricate open web girders?
Q2. What are different axle capacity in open web bridges?
Q3. Why IATF certification required for any organization ?
Q4. What are different types of steel bridges?
Q5. What are different methods of blasting or cleaning of scales of r ... read more

Interview questions from similar companies

I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They just asked basics que. related to job profile.. seeking confidence..

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.... should have basic knowledge of process. and knowledege of work and items.. and their costing and commercial terms.

I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.

Interview Preparation Tips

Round: Test
Experience: technical round
no. of questions 30

Round: Test
Experience: Questions related to NPD
no. of questions 10


Round: Test
Experience: VP Round
all questions reated to job 10


Round: Test
Experience: HR round ..

General Tips: Know the JD before interview
Skills: Communication, Body Language, Decision Making Skills
Duration: 1-4 weeks

I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Write the equation for dynamics and wave spectra equations. I do not remember questions as it is 3 years back.

Interview Preparation Tips

Interview preparation tips for other job seekers - This happened in Technip FMC Hyderabad, India. I hold 10 years experience. Interviewers don not know what to get from the candidates. The panel tried to prove within themselves that can ask difficult questions. The even entered to doctorate level questions which is not valid for performing job. Finally, I conclude that they performed some time-pass session.

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why IATF certification required for any organization ?
  • Ans. 

    IATF certification ensures that an organization's quality management system meets international standards for automotive industry.

    • IATF certification is required for any organization that wants to supply products or services to the automotive industry.

    • It ensures that the organization's quality management system meets international standards for the automotive industry.

    • It helps to improve the organization's processes and...

  • Answered by AI
  • Q2. Difference between kaizen & poka yoke.
  • Ans. 

    Kaizen is continuous improvement while Poka Yoke is mistake-proofing.

    • Kaizen focuses on making small, incremental improvements to processes and systems over time.

    • Poka Yoke aims to prevent mistakes from happening by designing processes and systems in a way that makes errors impossible or easily detectable.

    • Kaizen is a long-term strategy while Poka Yoke is a short-term tactic.

    • Examples of Kaizen include implementing a sugge...

  • Answered by AI
  • Q3. Points to be considered while designing any fixture or gauge.
  • Ans. 

    Points to consider while designing fixtures or gauges.

    • Understand the purpose of the fixture or gauge

    • Consider the material and size of the workpiece

    • Ensure proper clamping and alignment

    • Design for ease of use and maintenance

    • Consider the manufacturing process and cost

    • Test and validate the fixture or gauge before use

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Family background and salary expectations.

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Your communication was loud and clear.
2. You have to good knowledge of things which you have mentioned in CV.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Salary expectations, notice period.
Round 2 - Technical 

(1 Question)

  • Q1. Calibration, process , Dcs, logic
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the process of erection of duct
  • Ans. 

    The process of erection of duct involves planning, fabrication, transportation, installation, and testing.

    • Planning involves determining the layout, size, and material of the ducts.

    • Fabrication includes cutting, bending, and assembling the ducts according to the design.

    • Transportation is the movement of fabricated ducts to the installation site.

    • Installation involves positioning and connecting the ducts to the HVAC system.

    • ...

  • Answered by AI
  • Q2. What is the code followed for the fabrication of steel structure materials
  • Ans. 

    The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.

    • The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.

    • Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.

    • Fabrication processes must also ...

  • Answered by AI
  • Q3. Erection sequence of steel structure
  • Ans. 

    The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.

    • Start by assembling the foundation and anchor bolts.

    • Next, erect the columns and connect them to the foundation.

    • Then, install the beams and trusses to form the framework.

    • After that, add the bracing and diagonal members for stability.

    • Finally, complete the structure by ad...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the Erection sequence of ESP ?
  • Ans. 

    The erection sequence of ESP involves several steps to ensure proper installation and functioning.

    • 1. Prepare the foundation for the ESP unit.

    • 2. Install the support structure for the ESP.

    • 3. Assemble the ESP components such as the casing, electrodes, and rapping system.

    • 4. Connect the necessary electrical and mechanical components.

    • 5. Test the ESP system for proper functioning before commissioning.

    • 6. Commission the ESP sys...

  • Answered by AI
  • Q2. Name of manufactures of various ESP materials supplier
  • Ans. 

    Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.

    • Schlumberger

    • Baker Hughes

    • Halliburton

    • Weatherford

    • National Oilwell Varco

  • Answered by AI

Wipro Infrastructure Engineering Interview FAQs

How many rounds are there in Wipro Infrastructure Engineering Senior Production Engineer interview?
Wipro Infrastructure Engineering interview process usually has 1 rounds. The most common rounds in the Wipro Infrastructure Engineering interview process are One-on-one Round.

Tell us how to improve this page.

Wipro Infrastructure Engineering Senior Production Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 260 Interviews
ABB Interview Questions
4.1
 • 241 Interviews
Cummins Interview Questions
4.3
 • 233 Interviews
TechnipFMC Interview Questions
4.0
 • 73 Interviews
TÜV SÜD Interview Questions
3.9
 • 65 Interviews
Hilti Interview Questions
3.4
 • 61 Interviews
View all
6% more than the average Senior Production Engineer Salary in India
View more details

Wipro Infrastructure Engineering Senior Production Engineer Reviews and Ratings

based on 4 reviews

3.2/5

Rating in categories

3.1

Skill development

3.1

Work-life balance

3.1

Salary

4.1

Job security

3.1

Company culture

3.1

Promotions

3.1

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
118 salaries
unlock blur

₹5.1 L/yr - ₹14.6 L/yr

Trainee
101 salaries
unlock blur

₹1.1 L/yr - ₹2.5 L/yr

Senior Engineer
100 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Quality Engineer
62 salaries
unlock blur

₹1.5 L/yr - ₹5.6 L/yr

Team Member
60 salaries
unlock blur

₹2.8 L/yr - ₹5 L/yr

Explore more salaries
Compare Wipro Infrastructure Engineering with

Thermax Limited

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare

Isgec Heavy Engineering

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview