Filter interviews by
Machines, higher and lower pairs, kinematic chains, and conversion of chains are concepts in mechanical engineering.
Machines are devices that transmit or modify force and motion.
Higher pairs are joints that have surface contact and can transmit both force and motion.
Lower pairs are joints that have point contact and can only transmit motion.
Kinematic chains are a series of links connected by joints that transmit motion...
Rankine cycle is the most commonly used cycle in power plants. It is a thermodynamic cycle that converts heat into work.
Rankine cycle is used in steam power plants.
It consists of four processes: heating, vaporization, expansion, and condensation.
The cycle uses a working fluid, usually water, to transfer heat from a heat source to a heat sink.
Other cycles used in thermodynamics include Carnot cycle, Brayton cycle, and O
I am a driven and passionate individual with a diverse background in marketing and project management.
I have experience in developing and executing successful marketing campaigns
I am skilled in project management and have led teams to complete complex projects on time and within budget
I am a quick learner and thrive in fast-paced environments
I am a team player and enjoy collaborating with others to achieve common goals
I am feeling a mix of nervousness and excitement as I approach the final round.
I am nervous because this is the last chance to prove myself
I am excited because I have made it this far and have the opportunity to showcase my skills
I am trying to stay focused and calm to perform my best
I am also reflecting on what I have learned throughout the process
Overall, I am determined to give it my all and see what happens
Yes, I am physically fit and maintain a regular exercise routine.
I exercise for at least 30 minutes every day
I eat a balanced diet and avoid unhealthy foods
I have a healthy BMI and low body fat percentage
Yes, I am excited to work with you and contribute to the team's success.
I have relevant experience and skills that align with the job requirements.
I am a quick learner and adaptable to new environments.
I am a team player and believe in open communication and collaboration.
I am passionate about the industry and eager to make a positive impact.
I am willing to put in the effort and work hard to achieve our goals.
I expect a collaborative and supportive work environment that fosters growth and development.
Clear communication and feedback
Opportunities for learning and skill-building
A culture of teamwork and respect
Fair compensation and benefits
A focus on innovation and creativity
In five years, I see myself as a successful professional with a strong network and a clear vision for my future.
I plan to continue developing my skills and knowledge in my field
I hope to have taken on more leadership roles and responsibilities
I aim to have built a strong network of contacts and mentors
I want to have a clear vision for my future and be actively working towards my goals
I appeared for an interview in Feb 2025.
Wind power generation converts wind energy into electricity using turbines, harnessing natural wind flow for sustainable energy.
Wind turbines capture kinetic energy from wind.
The rotor blades spin, turning a shaft connected to a generator.
The generator converts mechanical energy into electrical energy.
Electricity is transmitted through power lines to homes and businesses.
Example: Offshore wind farms utilize strong sea
The supply process in a grid system involves generation, transmission, distribution, and consumption of electrical energy.
1. Generation: Electricity is generated at power plants using various sources like coal, natural gas, nuclear, or renewables (e.g., solar, wind).
2. Transmission: High-voltage transmission lines carry electricity over long distances to minimize energy loss.
3. Substations: Voltage is reduced at substa...
Wind World interview questions for popular designations
I applied via Campus Placement
IGBT is a power semiconductor device used for switching applications in power electronics.
IGBT combines the advantages of MOSFET and BJT transistors
It has high input impedance like a MOSFET and low on-state voltage drop like a BJT
Used in applications like motor drives, inverters, and power supplies
Power electronics devices are electronic components used to control and convert electrical power.
Power diodes: used for rectification in power supplies
Thyristors: used for switching and control in high power applications
Power transistors: used for amplification and switching in power circuits
IGBTs (Insulated Gate Bipolar Transistors): used in high power applications like motor drives
MOSFETs (Metal-Oxide-Semiconductor F...
I am a recent graduate with a degree in engineering and a passion for problem-solving and innovation.
Recent graduate with a degree in engineering
Passionate about problem-solving and innovation
Strong communication and teamwork skills
Experience with technical projects and internships
In two years, I see myself taking on more responsibilities and contributing significantly to the team's projects.
Continuing to learn and grow in my role as an Assistant Engineer
Taking on more complex projects and tasks
Building strong relationships with colleagues and stakeholders
Possibly pursuing further education or certifications to enhance my skills
Seeking opportunities for advancement within the company
Get interview-ready with Top Wind World Interview Questions
I have 8 years of experience in wind energy industry.
I have worked in the wind energy industry for 8 years
Experience includes designing, installing, and maintaining wind turbines
Familiar with industry standards and regulations
Completed projects in various locations with different wind conditions
Tower claimb test of 800w wtg
I appeared for an interview in Feb 2024.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Wind turbines operate by converting the kinetic energy of wind into mechanical power, which is then converted into electricity.
Wind turns the blades of the turbine, causing them to spin
The spinning blades turn a shaft connected to a generator
The generator converts the mechanical energy into electrical energy
The electricity is then sent to the power grid for distribution
Wind speed and direction are monitored to optimize
The duration of Wind World interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 65 interviews
Interview experience
based on 981 reviews
Rating in categories
Assistant Engineer
285
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Junior Engineer
251
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Engineer
183
salaries
| ₹2.2 L/yr - ₹6.9 L/yr |
Electrical Engineer
160
salaries
| ₹1.8 L/yr - ₹6.3 L/yr |
Senior Engineer
147
salaries
| ₹3 L/yr - ₹7.7 L/yr |
Suzlon Group
Adani Group
NTPC
Torrent Power