GTS and TBM benchmarks are both used in surveying, but GTS benchmarks are fixed points established by the government, while TBM benchmarks are temporary points set by the surveyor.
GTS benchmarks are permanent and established by the government for accurate and consistent surveying measurements.
TBM benchmarks are temporary and set by the surveyor for a specific project or survey.
GTS benchmarks are typically more accurate...
Connecting major schemes of irrigation to GTS benchmark is necessary for accurate measurement and monitoring of water levels and flow rates.
GTS benchmark provides a standardized reference point for measuring elevations and distances in the irrigation scheme.
Connecting to GTS benchmark ensures consistency and accuracy in data collection and analysis.
It allows for better monitoring of water levels, flow rates, and overal...
FRL stands for Full Reservoir Level and MWL stands for Maximum Water Level. FRL is the maximum level up to which a reservoir can be filled, while MWL is the highest level water can reach during a flood event.
FRL is the maximum level up to which a reservoir can be filled under normal operating conditions.
MWL is the highest level that water can reach during a flood event or extreme weather conditions.
FRL is determined ba...
Boulder toe, toe drains, and horizontal filter are provided in earthen dams to enhance stability and prevent erosion.
Boulder toe is placed at the base of the dam to protect against erosion from water flow.
Toe drains help in lowering the water table near the downstream toe of the dam, reducing uplift pressure.
Horizontal filters are used to prevent piping within the dam structure by allowing water to flow through while r
Balancing depth in canal refers to maintaining a uniform depth of water throughout the canal to ensure proper flow and prevent flooding.
Balancing depth is achieved by adjusting the cross-sectional area of the canal to match the required flow rate.
It involves designing the canal with the appropriate slope and dimensions to prevent water from pooling or flowing too quickly.
Proper balancing depth helps in efficient water ...
Water ratio in cement concrete mix is crucial for workability, strength, and durability of the concrete.
Water ratio affects the workability of the concrete mix - too much water can make it too fluid and difficult to work with, while too little water can make it too stiff.
The water-cement ratio also influences the strength and durability of the concrete - a lower water-cement ratio generally results in higher strength a...
Standard size of bricks is 190mm x 90mm x 90mm and tests are conducted by the quality control team at the work site.
Standard size of bricks is 190mm x 90mm x 90mm.
Tests are conducted by the quality control team at the work site to ensure the bricks meet the required standards.
Tests may include compressive strength test, water absorption test, efflorescence test, etc.
Quality control team may also check for dimensions, s
Standard thickness of inner and outer plaster in buildings varies depending on the type of construction and location.
Standard thickness of inner plaster is usually around 12mm to 15mm.
Standard thickness of outer plaster is typically around 20mm to 25mm.
Thickness may vary based on factors such as building material, climate, and structural requirements.
In earthquake-prone areas, thicker plaster may be used for added stre
I was interviewed before Jan 2021.
ETP stands for Effluent Treatment Plant. Catchment and basin refer to areas where water is collected. Delta is a landform at the mouth of a river. Lintel and plinth levels are types of building levels. Different types of water loss in canal include seepage and evaporation. Span of a bridge is decided based on weight and width considerations. Zeta potential is a measure of the electrical charge of particles in a fluid.
E...
Top trending discussions
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
Pumps and aerators are used to move fluids and gases respectively.
Pumps work by creating a pressure difference to move fluids from one place to another.
Aerators introduce air into liquids to increase oxygen levels and promote biological processes.
Types of pumps include centrifugal, positive displacement, and jet pumps.
Types of aerators include surface aerators, diffused aerators, and mechanical aerators.
I was interviewed before Feb 2021.
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Dec 2016. There were 5 interview rounds.
I was interviewed before Feb 2016.
One of the best projects I worked on was developing a mobile app for a non-profit organization.
The app was designed to help the organization's volunteers easily track their hours and tasks.
I worked closely with the non-profit to understand their needs and create a user-friendly interface.
The app was well-received by the volunteers and helped the organization better manage their resources.
I also implemented a feature th...
Citi bank should set up its offices in major cities like Mumbai, Delhi, and Bangalore.
Citi bank should consider the economic and political stability of the region.
The bank should also consider the availability of skilled workforce and infrastructure.
Major cities like Mumbai, Delhi, and Bangalore have a large customer base and a well-established financial sector.
Setting up offices in multiple cities can help the bank re...
Some of the top questions asked at the Water Resources Department Madhya Pradesh interview -
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Computer Operator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Executive Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Central Water Commission
National Water Development Agency
Water and Power Consultancy Services
Nagarjuna Construction Company