Upload Button Icon Add office photos

Voyants Solutions

Compare button icon Compare button icon Compare

Filter interviews by

Voyants Solutions District Coordinator Interview Questions and Answers for Experienced

Updated 25 Mar 2024

Voyants Solutions District Coordinator Interview Experiences for Experienced

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. General introduction

Interview questions from similar companies

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Regarding Technical questions interviewer asked me, like how to construct flexible pavement road ?
  • Q2. GSB CBR?
  • Q3. For One Lakh cum of soil dumping and compaction how many days require to finish ? and what is requirement of machinery unit?
  • Ans. 

    The duration and machinery requirement for dumping and compacting one lakh cum of soil.

    • The duration depends on the capacity of the machinery and the number of machines used.

    • The type of soil and the site conditions also affect the duration.

    • On average, it takes around 30-45 days to complete the task.

    • The machinery required includes excavators, bulldozers, dump trucks, and compactors.

  • Answered by AI
  • Q4.  Why we need to do C&G?
  • Q5. What is different between Minor bridge and Major bridge?
  • Ans. 

    Minor bridges are usually shorter and have a lower weight capacity than major bridges.

    • Major bridges are typically longer and have a higher weight capacity than minor bridges.

    • Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.

    • Major bridges may require more maintenance and have a higher construction cost than minor bridges.

    • Examples of major bridges i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, Be bold and talk free. Don't fear about what you don't know, explain what are you well known and believe your knowledge and keep going and learning.

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basics of Electrical Engineering, some important formulae. Details of Internships & industrial training like what have you learnt, what was the industry process & discipline related questions with respect ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare & focus mainly on your final project.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is COS and stages involved init
  • Ans. 

    COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.

    • COS includes costs such as raw materials, labor, and manufacturing overhead.

    • Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.

    • Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...

  • Answered by AI
  • Q2. What do you mean by EOT
  • Ans. 

    EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.

    • EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.

    • It is represented by the ASCII control character with the code 04.

    • EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...

  • Answered by AI
  • Q3. What is a CLAIM
  • Ans. 

    A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.

    • A claim is typically submitted by a policyholder or healthcare provider to an insurance company.

    • It includes details such as the services provided, dates of service, and the amount billed.

    • The insurance company reviews the claim to determine if it meets the policy's coverage criteria.

    • Once approved, the ...

  • Answered by AI
  • Q4. What do you mean by RFI
  • Ans. 

    RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.

    • RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.

    • It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.

    • RFIs are often used as a preliminary step before issui...

  • Answered by AI
  • Q5. How todo Estimates
  • Ans. 

    Estimates are calculated predictions of the cost, time, and resources required for a project.

    • Gather all relevant information and data related to the project

    • Break down the project into smaller tasks or components

    • Use historical data or industry benchmarks to estimate the time and cost for each task

    • Consider any potential risks or uncertainties that may impact the estimates

    • Document the estimates and communicate them clearl

  • Answered by AI

Skills evaluated in this interview

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

Voyants Solutions Interview FAQs

How many rounds are there in Voyants Solutions District Coordinator interview for experienced candidates?
Voyants Solutions interview process for experienced candidates usually has 1 rounds. The most common rounds in the Voyants Solutions interview process for experienced candidates are HR.
How to prepare for Voyants Solutions District Coordinator interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Voyants Solutions. The most common topics and skills that interviewers at Voyants Solutions expect are Statistics, Biochemistry, Excel, AutoCAD and Communication Management.

Tell us how to improve this page.

Voyants Solutions District Coordinator Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 427 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
View all
Voyants Solutions District Coordinator Salary
based on 4 salaries
₹3.4 L/yr - ₹4 L/yr
7% more than the average District Coordinator Salary in India
View more details

Voyants Solutions District Coordinator Reviews and Ratings

based on 2 reviews

3.7/5

Rating in categories

3.7

Skill development

4.3

Work-life balance

4.0

Salary

4.0

Job security

4.3

Company culture

3.7

Promotions

3.7

Work satisfaction

Explore 2 Reviews and Ratings
Field Engineer
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Resident Engineer
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Section Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
42 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Voyants Solutions with

Feedback Infrastructure Services

3.4
Compare

Mecon

3.9
Compare

IL&FS Engineering and Construction

4.4
Compare

TCE

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview