I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
Estimates help in planning, budgeting, resource allocation, and decision-making in construction projects.
Estimates help in determining the overall cost of a project, allowing for proper budgeting and financial planning.
They assist in resource allocation by identifying the materials, labor, and equipment needed for the project.
Estimates provide a basis for decision-making by helping stakeholders evaluate the feasibility...
The least count of surveying staff refers to the smallest measurement that can be made with the equipment being used.
Least count is determined by the precision of the measuring instrument
It is important to consider the least count when taking measurements to ensure accuracy
For example, a theodolite may have a least count of 20 seconds for horizontal angles
Plaster process involves applying a layer of plaster to walls or ceilings to create a smooth and durable surface.
Mixing plaster with water to create a workable paste
Applying the plaster to the surface using a trowel or hawk
Smoothing and leveling the plaster to achieve desired finish
Allowing the plaster to dry and cure before painting or decorating
Commonly used in construction for interior walls and ceilings
Ceiling height from floor surface is the vertical distance between the floor and the ceiling.
Ceiling height is typically measured in feet or meters.
Standard ceiling height in residential buildings is around 8-9 feet.
Commercial buildings may have higher ceiling heights, such as 10-12 feet or more.
Ceiling height can vary based on building codes, architectural design, and purpose of the space.
Concrete ratio refers to the proportion of cement, sand, and aggregate in a concrete mix.
Concrete ratio is typically denoted as 1:X:Y, where X is the proportion of sand and Y is the proportion of aggregate.
Common concrete ratios include 1:2:4 (cement:sand:aggregate) and 1:3:6.
The ratio of concrete mix is crucial for achieving the desired strength and durability of the concrete structure.
Top trending discussions
I appeared for an interview before May 2016.
based on 1 interview
Interview experience
based on 24 reviews
Rating in categories
Civil Site Engineer
16
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Project Manager
5
salaries
| ₹6.6 L/yr - ₹9 L/yr |
Civil Engineer
5
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Safety Officer
4
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning