Filter interviews by
I applied via Campus Placement and was interviewed in Sep 2023. There were 4 interview rounds.
Aptitude section divide in three parts
In first part there is lots of questions from Electronic device
In second part , questions from digital electronics
In third part there is question from aptitude
Group discussion topic is - is india ready from electric vehicles?
CMOS stands for Complementary Metal-Oxide-Semiconductor and MOSFET stands for Metal-Oxide-Semiconductor Field-Effect Transistor.
CMOS is a type of technology used in integrated circuits, where both PMOS and NMOS transistors are used.
MOSFET is a type of transistor that is used for amplifying or switching electronic signals.
Types of MOSFET include enhancement mode and depletion mode MOSFETs.
NPN and PNP refer to the type o...
I applied via LinkedIn and was interviewed in Jun 2022. There were 2 interview rounds.
Two sum number add python coding
I applied via Approached by Company and was interviewed in Feb 2022. There were 3 interview rounds.
Daily life related topic discussion
I applied via Campus Placement and was interviewed in Apr 2021. There were 2 interview rounds.
Java is a high-level programming language used for developing applications and software.
Java is an object-oriented language
It is platform-independent
Java code is compiled into bytecode
Java Virtual Machine (JVM) executes the bytecode
Java is used for developing web applications, mobile applications, desktop applications, and games
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
I applied via Naukri.com
7QC tools, 6S, 4M, 3R, Poka Yoke, Kaizen, CAPPA, PPM, UPH, and cycle time are all important concepts in production engineering.
7QC tools are quality control tools used to identify and solve production problems.
6S is a methodology for workplace organization and standardization.
4M stands for Man, Machine, Material, and Method and is used to identify the root cause of production problems.
3R stands for Reduce, Reuse, and R...
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Production related issues can include equipment breakdowns, supply chain disruptions, and quality control problems.
Equipment breakdowns can cause delays and halt production entirely.
Supply chain disruptions can lead to shortages of raw materials or finished products.
Quality control problems can result in defective products and damage to the company's reputation.
Other issues may include inefficient processes, safety haz...
This question is asking me to respond quickly and without hesitation.
I understand the importance of quick thinking in a production engineering role
I will take a moment to gather my thoughts before responding
I will provide a clear and concise answer to the best of my ability
based on 1 interview
1 Interview rounds
based on 3 reviews
Rating in categories
Assistant Engineer
475
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
445
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
438
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Sales Manager
324
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
250
salaries
| ₹0 L/yr - ₹0 L/yr |
Xiaomi
Samsung
OPPO
Realme