Filter interviews by
I applied via Naukri.com and was interviewed in May 2024. There were 5 interview rounds.
Pre-tensioning is done before casting the concrete while post-tensioning is done after casting the concrete.
Pre-tensioning involves applying stress to the tendons before the concrete is poured.
Post-tensioning involves applying stress to the tendons after the concrete has hardened.
Pre-tensioning is typically used in precast concrete elements like beams and slabs.
Post-tensioning is commonly used in cast-in-place concrete
Specific gravity of bentonite is approximately 2.0 to 2.7.
Specific gravity of bentonite is typically between 2.0 to 2.7.
It is important to know the specific gravity of bentonite when designing foundations or retaining walls.
Specific gravity can vary depending on the type and quality of bentonite used.
Cube test strength after 7 days is a measure of concrete's compressive strength.
Cube test is conducted to determine the compressive strength of concrete after a certain period of curing, typically 7 or 28 days.
The results of the cube test help in assessing the quality of concrete and its suitability for the intended purpose.
The standard cube size for testing is 150mm x 150mm x 150mm.
The strength of concrete is usually
Cube test strength after 28 days is a standard test to determine the compressive strength of concrete.
Cube test involves casting cubes of concrete and testing them after 28 days to determine their strength
The strength of concrete is usually measured in megapascals (MPa)
The results of cube tests are crucial for ensuring the quality and durability of concrete structures
Frequency of cube filling refers to how often a cube is filled with material or substance.
Frequency of cube filling can vary depending on the project requirements and timeline.
It is important to consider factors such as material availability, equipment efficiency, and labor resources.
For example, in a construction project, the frequency of cube filling may be daily to ensure timely completion.
Regular monitoring and adj...
The pH-value of Bentonite slurry is typically around 8-9.
Bentonite slurry is commonly used in construction for various purposes such as drilling fluid, tunneling, and soil stabilization.
The pH-value of Bentonite slurry is important as it can affect its performance and compatibility with other materials.
A pH-value of around 8-9 is considered ideal for Bentonite slurry in most applications.
Top trending discussions
I appeared for an interview in Jan 2025.
I appeared for an interview in Aug 2024.
Construction procedure in civil engineering involves planning, designing, executing, and maintaining structures like buildings, roads, bridges, etc.
Initial planning and design phase where the project requirements are determined
Obtaining necessary permits and approvals from local authorities
Site preparation including clearing, grading, and excavation
Construction phase involving building the structure according to the de...
Daily routine in construction involves quality checks and technical development.
Inspecting materials and workmanship for quality control
Ensuring compliance with building codes and regulations
Implementing and monitoring safety protocols
Collaborating with engineers and architects for technical development
Training and mentoring staff on new construction techniques
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
I am a highly motivated and experienced professional with a strong background in management.
I have over 5 years of experience in leadership roles, including managing teams and overseeing operations.
I have a proven track record of achieving targets and driving results.
I am skilled in problem-solving, decision-making, and conflict resolution.
I have excellent communication and interpersonal skills, which enable me to effe...
Can't it very much important Document can't share sorry
I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Construction and maintenance of GIS buildings involves planning, design, construction, and ongoing upkeep of the facility.
GIS building construction requires detailed planning and design to ensure the facility meets the specific needs of the project.
Regular maintenance is essential to keep the GIS building in optimal condition and prevent costly repairs in the future.
Maintenance tasks may include HVAC system checks, roo...
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 3 interview rounds.
Equipment installation involves setting up machinery and ensuring it operates correctly.
Understanding technical specifications and blueprints
Assembling and connecting components
Testing and troubleshooting
Adhering to safety regulations
Collaborating with other professionals
Examples: installing HVAC systems, manufacturing equipment, or production lines
Hydrotest is a pressure test conducted on pipes, vessels, or equipment to ensure their strength and integrity.
Hydrotest is required to ensure that the equipment can withstand the design pressure and prevent leaks or failures.
It involves filling the equipment with water or other fluids and pressurizing it to a specified level for a certain duration.
The pressure is then released, and the equipment is inspected for any le...
Pressure gauges are used to measure the pressure of fluids and gases in various industries.
Pressure gauges come in different ranges depending on the application.
The range of a pressure gauge should be selected based on the maximum pressure expected in the system.
The accuracy of the pressure gauge should also be considered when selecting a gauge.
Pressure gauges should be calibrated regularly to ensure accurate readings.
...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
26
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Deputy Manager
24
salaries
| ₹8.5 L/yr - ₹16.2 L/yr |
Senior Executive
23
salaries
| ₹3.5 L/yr - ₹6.1 L/yr |
Senior Manager
16
salaries
| ₹17 L/yr - ₹29 L/yr |
Manager
10
salaries
| ₹16.1 L/yr - ₹20.2 L/yr |
Team Lease
Randstad
ABC Consultants
First Advantage