Vishwa Samudra Engineering
10+ Renaissance University Interview Questions and Answers
Q1. Maximum equipment what was the period of changing the filters and lubes
The maximum period for changing filters and lubes depends on the type of equipment and its usage.
The period for changing filters and lubes varies depending on the type of equipment and its usage.
Regular maintenance schedules should be followed to ensure optimal performance and longevity of the equipment.
Factors such as environment, operating conditions, and type of lubricant used can also affect the frequency of filter and lube changes.
Examples of maintenance schedules for di...read more
Q2. Machinery costing depends on which parameters
Machinery costing depends on various parameters such as production capacity, technology used, maintenance cost, and market demand.
Production capacity
Technology used
Maintenance cost
Market demand
Q3. How you treat the break down equipment
I prioritize quick and efficient repair to minimize downtime and ensure smooth operations.
I immediately assess the cause and extent of the breakdown
I coordinate with the maintenance team to schedule repairs
I ensure that necessary spare parts are available
I monitor the progress of repairs and provide updates to relevant stakeholders
I conduct a post-repair evaluation to identify areas for improvement
Example: When a critical machine broke down, I quickly identified the issue and...read more
Q4. As a engineer how many equipment handled
As an engineer, I have handled various types of equipment throughout my career.
I have experience in handling heavy machinery such as cranes, excavators, and bulldozers.
I have also worked with smaller equipment like generators, compressors, and pumps.
In addition, I have experience in maintaining and repairing equipment to ensure optimal performance.
Overall, I have handled a wide range of equipment in my career as an engineer.
Q5. What are the quality checks for roads
Quality checks for roads ensure durability and safety of the infrastructure.
Checking the thickness and compaction of the asphalt layer
Inspecting the smoothness and evenness of the road surface
Testing the strength of the road base and subbase materials
Ensuring proper drainage to prevent water accumulation and erosion
Monitoring the alignment and slope of the road for safety and efficiency
Conducting regular inspections for cracks, potholes, and other signs of wear and tear
Q6. What is using soli Stabilization
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to enhance its properties.
Common materials used for soil stabilization include cement, lime, and fly ash.
Soil stabilization is commonly used in road construction to improve the load-bearing capacity of the soil.
It can also be used in the construction of foundations, embankments, and slopes.
The process of soil stabil...read more
Q7. What are conversion for feet
Feet can be converted to other units of length such as meters, yards, and inches.
1 foot = 0.3048 meters
1 foot = 0.333333 yards
1 foot = 12 inches
Q8. Percentage of esic Payment date of esic and pf
ESIC percentage and payment date, along with PF payment date.
ESIC contribution is 1.75% of the employee's gross salary and 4.75% is contributed by the employer.
ESIC payment is due by the 15th of every month.
PF contribution is 12% of the employee's basic salary and DA, with an equal contribution from the employer.
PF payment is due by the 15th of every month.
Q9. Recruitment process Benefits of esic and epf
ESIC and EPF are two important benefits for employees in India.
ESIC provides medical benefits and insurance to employees and their families.
EPF is a retirement benefit scheme where both the employer and employee contribute towards a fund.
ESIC and EPF are mandatory for companies with more than 10 employees.
These benefits help in attracting and retaining employees, and also provide financial security.
ESIC and EPF also help in reducing absenteeism and increasing productivity.
ESI...read more
Q10. What is soli Stabilization
Soil stabilization is the process of improving the engineering properties of soil to enhance its strength and durability.
It involves adding or mixing materials with the soil to alter its physical and chemical properties.
Common materials used for soil stabilization include cement, lime, fly ash, and bitumen.
Soil stabilization can be used to increase the load-bearing capacity of soil, reduce settlement, control erosion, and improve soil durability.
It is commonly employed in roa...read more
Q11. What are the roads
Roads are pathways or routes for vehicles and pedestrians to travel from one place to another.
Roads are typically made of asphalt, concrete, or gravel.
They can vary in size from small residential streets to large highways.
Roads can have different speed limits, lane configurations, and signage.
Examples include highways, city streets, country roads, and bridges.
Roads require regular maintenance to ensure safety and usability.
Q12. 194C section in taxation
Section 194C of the Income Tax Act deals with tax deduction at source (TDS) on payments made to contractors and sub-contractors.
Section 194C applies to both individuals and businesses who make payments to contractors or sub-contractors for carrying out any work.
The payer is required to deduct TDS at a specified rate (currently 1% for individuals and 2% for businesses) if the payment exceeds a certain threshold.
The threshold limit for TDS deduction under section 194C is Rs. 30...read more
Q13. Define scheduling
Scheduling is the process of creating a timeline or plan for completing tasks or activities within a specific timeframe.
Scheduling involves determining the sequence of tasks, their duration, and the resources needed.
It helps in organizing and prioritizing tasks to ensure efficient use of time and resources.
Examples of scheduling tools include Gantt charts, project management software, and spreadsheets.
Q14. Heavy construction deep explanation
Heavy construction involves the use of large machinery and equipment to build structures such as bridges, roads, and buildings.
Heavy construction projects typically require specialized equipment such as cranes, bulldozers, and excavators.
These projects often involve working with large quantities of materials such as concrete, steel, and asphalt.
Safety is a major concern in heavy construction due to the size and weight of the equipment involved.
Heavy construction projects can ...read more
Q15. 1 percent of value
The question is asking about calculating 1 percent of a given value.
To calculate 1 percent of a value, divide the value by 100.
For example, 1 percent of 200 is 2 (200 / 100 = 2).
This calculation is commonly used in financial analysis and budgeting.
Q16. Method of account
The method of account refers to the system or approach used to record and organize financial transactions.
There are several methods of accounting, including cash basis accounting and accrual basis accounting.
Cash basis accounting records transactions when cash is received or paid, while accrual basis accounting records transactions when they occur, regardless of when cash is exchanged.
Other methods include hybrid accounting, which combines elements of both cash and accrual ba...read more
Q17. Introduce ur self
I am a dedicated and detail-oriented Planning & Billing Engineer with a strong background in project management and cost control.
Bachelor's degree in Civil Engineering
Experience in creating project schedules and cost estimates
Proficient in using software such as Primavera P6 and Microsoft Project
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
Top HR Questions asked in Renaissance University
Interview Process at Renaissance University
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month