Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2023. There was 1 interview round.
Top trending discussions
posted on 25 Jun 2023
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
Due to the information according to the works
Oil in transformers functions as an insulating and cooling medium to prevent overheating and breakdown of electrical components.
Insulates electrical components to prevent short circuits
Cools the transformer by dissipating heat generated during operation
Protects against moisture and contaminants
Improves dielectric strength of the transformer oil
Examples: mineral oil, silicone oil, and synthetic esters
The secondary voltage passes from the primary winding in a transformer through electromagnetic induction.
When an alternating current flows through the primary winding, it creates a changing magnetic field around the winding.
This changing magnetic field induces a voltage in the secondary winding through electromagnetic induction.
The induced voltage in the secondary winding is proportional to the ratio of the number of t
The frequency in India typically refers to the frequency of electricity supply, which is 50 Hz.
The frequency of electricity supply in India is 50 Hz.
This frequency is standard for most of the country's power grid.
It is important for electrical equipment to be compatible with this frequency to function properly.
posted on 26 Jul 2024
posted on 25 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.
posted on 17 Nov 2023
I applied via Approached by Company and was interviewed in May 2023. There were 2 interview rounds.
Types of concrete include ready-mix, precast, shotcrete, etc. Construction equipments include excavators, cranes, bulldozers, etc.
Types of concrete: ready-mix, precast, shotcrete, high-performance, etc.
Construction equipments: excavators, cranes, bulldozers, concrete mixers, etc.
I applied via Naukri.com and was interviewed in Oct 2022. There were 5 interview rounds.
posted on 16 Oct 2023
I applied via campus placement at National Institute of Technology,(NIT), Meghalaya and was interviewed before Oct 2022. There were 5 interview rounds.
I was selected from campus drive, so have to attend all 4 stages.
Current issue of project acquisition in different areas in India.
posted on 11 Jul 2024
I was interviewed before Jul 2023.
posted on 11 Nov 2021
I applied via Walk-in and was interviewed before Nov 2020. There were 3 interview rounds.
To check worker productivity, monitor their output, track their progress, and evaluate their efficiency.
Monitor the quantity and quality of work completed by each worker.
Track the progress of tasks assigned to workers and compare it with the set deadlines.
Evaluate the efficiency of workers by analyzing their work methods and time management.
Use performance metrics and key performance indicators (KPIs) to measure produc...
Safety in height of work can be maintained by following safety protocols and using proper equipment.
Ensure workers are trained in safety procedures
Use proper safety equipment such as harnesses and helmets
Regularly inspect equipment and scaffolding
Implement a safety plan and enforce it strictly
Provide adequate lighting and signage
Monitor weather conditions and adjust work accordingly
Formalities before concrete to be checked
Ensure proper reinforcement is in place
Check for proper formwork and its alignment
Verify the mix design and slump of concrete
Ensure proper curing measures are in place
Check for any obstructions or debris in the concrete placement area
De-shuttering period depends on various factors such as type of concrete, temperature, humidity, and strength required.
De-shuttering period is the time taken to remove the formwork or shuttering from the concrete after it has been poured.
The period varies depending on the type of concrete used, temperature, humidity, and strength required.
For example, for normal concrete, the de-shuttering period is usually 14-21 days,...
based on 1 interview
Interview experience
Junior Engineer
53
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Assistant Manager
43
salaries
| ₹4.2 L/yr - ₹12.6 L/yr |
Senior Engineer
40
salaries
| ₹4.8 L/yr - ₹8.8 L/yr |
Site Engineer
33
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Engineer
26
salaries
| ₹3.5 L/yr - ₹6.6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Thermax Limited