Filter interviews by
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Uptime in onm refers to the amount of time a system or service is operational and available for use.
Uptime is typically measured as a percentage of total time, with 100% uptime indicating continuous availability.
Factors affecting uptime include maintenance schedules, system reliability, and response to downtime incidents.
For example, a system with 99.9% uptime would be operational for 99.9% of the total time period.
Mon...
Top trending discussions
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
I was interviewed in Aug 2024.
I have strong technical skills in project management, including proficiency in software tools and systems.
Proficient in project management software such as Microsoft Project and Asana
Skilled in creating and maintaining project schedules and timelines
Experienced in conducting risk assessments and implementing mitigation strategies
Familiar with Agile and Waterfall project management methodologies
My strategy involves effective communication, cultural sensitivity, clear expectations, and fostering a collaborative team environment.
Establish clear communication channels to ensure everyone is on the same page
Respect and embrace cultural differences to promote inclusivity and understanding
Set clear expectations and deadlines to keep the project on track
Encourage teamwork and collaboration to leverage diverse perspec...
How to Complete of any project starting to till Handover
posted on 25 May 2022
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
posted on 1 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
To improve network availability in 4G architecture, we can implement redundancy, load balancing, and network optimization techniques.
Implementing redundancy by adding backup components such as routers, switches, and servers to ensure network availability in case of failure.
Load balancing can be achieved by distributing network traffic across multiple servers to prevent overloading of a single server.
Network optimizatio...
SMPS stands for Switched Mode Power Supply. It converts AC to DC voltage using high-frequency switching.
SMPS uses a high-frequency switching circuit to convert AC to DC voltage
It is more efficient than traditional linear power supplies
New rollouts can be deployed by following a structured project management approach
This includes planning, testing, and implementation phases
Regular communication with stakeholders is impo
One problem faced in the operation of network is frequent network outages.
Frequent network outages disrupt the workflow and productivity.
It leads to communication breakdown and delays in completing tasks.
Network outages can result in loss of important data and affect customer satisfaction.
Troubleshooting network issues takes time and resources.
Implementing backup systems and redundancy can help mitigate the impact of n
There are various types of engines used in construction equipment.
Diesel engines are commonly used in construction equipment due to their high torque and fuel efficiency.
Gasoline engines are also used in smaller construction equipment.
Electric engines are becoming more popular for their low noise and zero emissions.
Hybrid engines combine the benefits of both diesel and electric engines.
Some construction equipment may a...
I was interviewed before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
I was interviewed before Mar 2017.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Asset Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Communications Transformation Services
Tikona Infinet
HFCL Limited
Bharti Infratel