Upload Button Icon Add office photos

Filter interviews by

Viney Corporation Tool Room Manager Interview Questions and Answers

Updated 21 Jan 2021

Viney Corporation Tool Room Manager Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Jan 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About company goal
  • Q2. About company product and turn over

Interview Preparation Tips

Interview preparation tips for other job seekers - Work according to company goal and target

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Quantitativ, Logical reasoning, verbal reasoning, programming skills.

Round 3 - Assignment 

Assignment format page Desine idea.

Round 4 - Case Study 

Manual Book baise nolge.

Round 5 - HR 

(2 Questions)

  • Q1. Yes my parsonaliti
  • Q2. What is TPM/KAIZEN/5S ROBOTIC/CNC MACHINE Calibration/specification PM/Maintenance Electrical/machanical.
  • Ans. 

    TPM/KAIZEN/5S are methodologies for improving efficiency and productivity in manufacturing. CNC machine calibration involves ensuring accuracy and precision in machine operations.

    • TPM (Total Productive Maintenance) focuses on maximizing equipment effectiveness through proactive maintenance and employee involvement.

    • KAIZEN is a continuous improvement philosophy that involves making small, incremental changes to processes ...

  • Answered by AI
Round 6 - Technical 

(2 Questions)

  • Q1. CNC machine Maintenance Preventive maintenance Installation communications.
  • Q2. Long life machine Good health 0berkdown

Interview Preparation Tips

Interview preparation tips for other job seekers - I am a maintenance engineer
Tool room maintenance
OEE.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Why do you choose tool room??
  • Ans. 

    I choose tool room because I enjoy working with precision tools and machinery, solving technical problems, and contributing to the manufacturing process.

    • I have a passion for working with precision tools and machinery

    • I enjoy solving technical problems and challenges

    • I like contributing to the manufacturing process by creating and maintaining tools and molds

    • I find satisfaction in seeing the end result of my work in the pr

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Basic information
  • Q2. Salary / experience

I applied via Campus Placement and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Very technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn basic techniques

I applied via Campus Placement and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Tell me something your self?
  • Q2. What is tool?
  • Ans. 

    A tool is an object or device used to perform a specific task or function.

    • Tools can be hand-held or power-operated

    • Examples include hammers, screwdrivers, drills, and saws

    • Tools are often designed for specific tasks or materials

    • Proper use and maintenance of tools is important for safety and effectiveness

  • Answered by AI
  • Q3. How to prevent breakdown In moulding?
  • Ans. 

    Prevent moulding breakdown by ensuring proper maintenance, monitoring and troubleshooting.

    • Regularly inspect and clean moulding equipment

    • Monitor temperature and pressure to ensure they are within optimal range

    • Troubleshoot any issues immediately to prevent further damage

    • Train operators on proper use and maintenance of equipment

    • Use high-quality materials to prevent wear and tear

    • Implement preventive maintenance schedule

    • Ens...

  • Answered by AI
  • Q4. Types of maintenance?
  • Ans. 

    Types of maintenance include corrective, preventive, predictive, and proactive maintenance.

    • Corrective maintenance involves fixing a problem after it has occurred.

    • Preventive maintenance involves scheduled maintenance to prevent problems from occurring.

    • Predictive maintenance involves using data to predict when maintenance is needed.

    • Proactive maintenance involves identifying and addressing potential problems before they o...

  • Answered by AI
  • Q5. Drill bit angle and M12&M8 drill size?
  • Ans. 

    The drill bit angle and M12&M8 drill size depend on the material being drilled and the desired hole size.

    • The drill bit angle should match the material being drilled for optimal performance.

    • M12 and M8 refer to the diameter of the drill bit in millimeters.

    • For example, a 118 degree angle is suitable for drilling soft materials like wood and plastic, while a 135 degree angle is better for harder materials like metal.

    • The si...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Generally there is no interview for joining as a Trainne . Depend their department .

Skills evaluated in this interview

Tell us how to improve this page.

People are getting interviews through

based on 1 Viney Corporation interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.7k Interviews
LTIMindtree Interview Questions
3.8
 • 2.9k Interviews
Mphasis Interview Questions
3.4
 • 790 Interviews
Bosch Interview Questions
4.2
 • 328 Interviews
View all
Viney Corporation Tool Room Manager Salary
based on 4 salaries
₹8.5 L/yr - ₹9.5 L/yr
22% less than the average Tool Room Manager Salary in India
View more details

Viney Corporation Tool Room Manager Reviews and Ratings

based on 4 reviews

4.1/5

Rating in categories

3.4

Skill development

3.9

Work-Life balance

4.5

Salary & Benefits

5.0

Job Security

2.0

Company culture

2.4

Promotions/Appraisal

3.2

Work Satisfaction

Explore 4 Reviews and Ratings
Quality Engineer
54 salaries
unlock blur

₹1.5 L/yr - ₹3.6 L/yr

Production Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Assistant Manager
11 salaries
unlock blur

₹4 L/yr - ₹6.3 L/yr

Purchase Executive
10 salaries
unlock blur

₹2.1 L/yr - ₹3.2 L/yr

Executive Accountant
8 salaries
unlock blur

₹3 L/yr - ₹3.8 L/yr

Explore more salaries
Compare Viney Corporation with

TCS

3.7
Compare

Infosys

3.7
Compare

Wipro

3.7
Compare

HCLTech

3.5
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview