Filter interviews by
I applied via Walk-in and was interviewed in Jul 2022. There was 1 interview round.
Skewness is a measure of the asymmetry of a probability distribution. The symmetric value in skewness is zero.
Skewness measures the degree of asymmetry in a distribution.
A positive skewness indicates a longer tail on the right side of the distribution.
A negative skewness indicates a longer tail on the left side of the distribution.
A symmetric distribution has a skewness of zero.
Kurtosis is a measure of the shape of a probability distribution. Leptokurtic distributions have a higher peak and heavier tails.
Kurtosis measures the degree of peakedness or flatness of a distribution compared to a normal distribution.
Leptokurtic distributions have a kurtosis greater than 3, indicating a higher peak and heavier tails than a normal distribution.
Examples of leptokurtic distributions include the t-distri
PPAP requires several documents. Here are some examples:
Part Submission Warrant (PSW)
Design Records
Engineering Change Documents
Process Flow Diagram
Process Failure Mode and Effects Analysis (PFMEA)
Control Plan
Measurement System Analysis (MSA)
Dimensional Results
Material Performance Test Results
Initial Process Studies
Qualified Laboratory Documentation
Appearance Approval Report (AAR)
Sample Production Parts
Master Sample
Chec
Cp, cpk measure process capability while Pp, ppk measure process performance.
Cp and cpk are used for measuring how well a process is performing within its specification limits.
Pp and ppk are used for measuring how well a process is performing between its specification limits.
Cp and Pp are based on the standard deviation of the process, while cpk and ppk are based on the deviation of the process from the target value.
Cp...
There are 7 quality core tools used in quality management. Examples include FMEA, Control Plan, and Statistical Process Control.
There are 7 quality core tools used in quality management
Examples include FMEA, Control Plan, and Statistical Process Control
Other tools include Measurement System Analysis, APQP, PPAP, and MSA
These tools are used to improve quality and reduce defects in products and processes
Sigma is a statistical measure of process variation in SPC. CP and CPK are used to calculate sigma value.
Sigma is a measure of how much a process deviates from its target value.
It is calculated using the standard deviation of the process data.
CP and CPK are used to calculate sigma value in SPC.
CP measures the capability of a process to meet the customer's specifications.
CPK measures the capability of a process to meet ...
CP and Cpk are statistical process control measures used to assess process capability.
CP measures the potential capability of a process to meet the specifications, while Cpk measures the actual capability of a process to meet the specifications.
CP is calculated using the formula (USL-LSL)/(6*sigma), while Cpk is calculated using the formula min[(USL-mean)/(3*sigma), (mean-LSL)/(3*sigma)].
CP only considers the spread of...
CP and CPK are statistical measures of process capability. Acceptable values depend on the industry and specific process.
Acceptable values vary by industry and process
Generally, a CP of 1.33 and a CPK of 1.67 are considered acceptable
Higher values indicate better process capability
Values below 1 indicate a process that needs improvement
CPK takes into account the process mean and standard deviation, while CP only consid
TQM stands for Total Quality Management. It is a management approach that focuses on continuous improvement and customer satisfaction.
TQM is a management philosophy that aims to involve all employees in improving processes and products.
It emphasizes the importance of customer satisfaction and meeting their needs and expectations.
TQM principles include continuous improvement, employee involvement, process-centered appro...
posted on 19 Feb 2021
Improving quality requires a focus on continuous improvement and attention to detail.
Establish clear quality standards and metrics
Regularly review and analyze data to identify areas for improvement
Implement processes and procedures to address identified issues
Provide training and support to employees to ensure they understand and can meet quality standards
Encourage a culture of continuous improvement and innovation
posted on 8 Jul 2017
I appeared for an interview in Jun 2017.
There are 5 members in my family including my parents, my sister, and myself.
My parents
My sister
Myself
Seeking new challenges and growth opportunities in a more dynamic work environment.
Looking for career advancement
Seeking new challenges and learning opportunities
Interested in working in a more dynamic work environment
Want to broaden my skill set and experience
My notice period is one month.
My notice period is one month
I am required to give one month's notice before leaving my current position
I will need to work for one more month before I can start a new job
posted on 18 Feb 2018
I have extensive experience with salary structure and personal details in previous roles.
Developed and implemented salary structures for various levels within the organization
Managed employee compensation and benefits programs
Ensured compliance with legal and regulatory requirements related to salary and personal information
Maintained confidentiality of sensitive employee data
Conducted salary surveys and market researc...
I applied via Naukri.com and was interviewed in May 2019. There was 1 interview round.
Answers to questions related to DOE, JH pillar, 5S, and IAFT 16949 vs TS16949
DOE stands for Design of Experiments and is a statistical tool used to optimize processes
Full factorial design is a DOE technique where all possible combinations of factors and levels are tested
Taguchi method is a DOE technique that focuses on reducing variability and improving quality
P-value is a statistical measure that helps determine the s...
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 6 interview rounds.
Standard cost is calculated by adding up all the direct and indirect costs of production.
Direct costs include materials, labor, and overhead expenses.
Indirect costs include rent, utilities, and depreciation.
Once all costs are added up, divide by the number of units produced to get the standard cost per unit.
Standard cost is used to compare actual costs and identify areas for improvement.
BOM stands for Bill of Materials.
A comprehensive list of raw materials, components, and assemblies required to manufacture a product.
Used in manufacturing, engineering, and supply chain management.
Helps in determining the cost of a product and planning production schedules.
Example: BOM for a car would include engine, tires, seats, etc.
Cost run is the total cost incurred in running a business or project. It includes all expenses related to production, marketing, and administration.
Cost run is calculated by adding up all the expenses incurred in running a business or project.
Expenses include production costs, marketing costs, and administrative costs.
To run cost effectively, businesses need to identify areas where they can reduce expenses without comp...
Product cost is calculated by adding direct and indirect costs. Landed cost includes product cost and additional expenses.
Product cost includes direct costs like raw materials, labor, and indirect costs like overheads.
Landed cost includes product cost and additional expenses like shipping, customs, and taxes.
Formula for product cost = direct costs + indirect costs.
Formula for landed cost = product cost + additional exp
Some of the top questions asked at the Viney Corporation Senior Executive Officer interview -
based on 1 review
Rating in categories
Quality Engineer
53
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Production Engineer
18
salaries
| ₹2.1 L/yr - ₹3.6 L/yr |
Executive Accountant
9
salaries
| ₹3 L/yr - ₹3.8 L/yr |
Purchase Executive
9
salaries
| ₹2.2 L/yr - ₹3.9 L/yr |
Assistant Manager
9
salaries
| ₹4 L/yr - ₹9 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres