Filter interviews by
Group discussion with the plant head and the business head.
Capacity calculation involves determining the maximum output a production system can achieve.
Identify the resources available for production (e.g. machines, labor, materials)
Determine the maximum output each resource can contribute
Calculate the overall capacity by summing up the individual resource capacities
Consider factors like downtime, maintenance, and efficiency in the calculation
Capacity = (Number of machines) x ...
Manpower planning involves assessing workforce needs and availability, while raw material calculation is based on production schedule and inventory levels.
Analyze production schedule to determine manpower requirements
Assess current workforce availability and skills
Forecast future manpower needs based on production goals
Calculate raw material requirements based on production schedule and inventory levels
Consider lead ti...
Implementing strict quality control measures to reduce defects
Implementing thorough inspection processes at each stage of production
Training staff on quality standards and procedures
Utilizing quality control tools such as checklists and statistical process control
Regularly monitoring and analyzing data to identify trends and potential issues
Implementing corrective actions and continuous improvement initiatives
Collabora...
A smooth supply for customers can be ensured by maintaining strong relationships with suppliers, implementing efficient inventory management systems, and having contingency plans in place.
Build strong relationships with suppliers to ensure timely deliveries and priority treatment
Implement efficient inventory management systems to track stock levels and anticipate demand
Have contingency plans in place for unexpected dis...
Improving plant productivity can be achieved through implementing efficient processes, utilizing technology, optimizing resources, and fostering a culture of continuous improvement.
Implementing lean manufacturing principles to streamline processes and reduce waste
Investing in automation and technology to increase efficiency and accuracy
Optimizing resource utilization through proper planning and scheduling
Providing trai...
I have a strong track record of job stability, with a minimum of two years in each position.
I have consistently held positions for at least two years in my previous roles.
I prioritize job stability and seek long-term opportunities.
I have received positive feedback and promotions in my current and past positions, indicating my commitment and performance.
I am dedicated to my career and value longevity in my roles.
Raw material planning according to the schedule, workforce planning according to the schedule, and capacity press calculation.
Coding test on reverse string without inbuilt method
OOP is a programming paradigm based on the concept of objects, which can contain data in the form of fields and code in the form of procedures.
OOP allows for the organization of code into reusable components called objects.
Encapsulation, inheritance, and polymorphism are key principles of OOP.
Example: Inheritance allows a class to inherit properties and methods from another class, promoting code reusability.
Example: Po...
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. PPE stands for Personal Protective Equipment.
5S is a method for organizing a workplace to improve efficiency and safety
PPE includes items like gloves, helmets, goggles, and masks to protect workers from hazards
Examples of 5S include organizing tools, labeling storage areas, and maintaining cleanl...
Thermodynamics is the branch of physics that deals with the relationships between heat, work, and energy.
Thermodynamics studies the transfer of energy in the form of heat and work.
It involves concepts like entropy, temperature, and energy conservation.
Examples include the efficiency of engines, refrigeration systems, and phase transitions.
Mechanical trade with technical knowledge
Group discussion candidate with technical knowledge team
Victora Tool Engineers interview questions for popular designations
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 2 interview rounds.
Quality is meeting or exceeding customer expectations through consistent and reliable processes.
Sheet grade refers to the quality of the material used in manufacturing.
Press operation is the process of shaping the material into the desired form.
Drawing projection is a technical drawing that shows the dimensions and specifications of the product.
Measuring instruments are tools used to ensure that the product meets the r...
The question covers various topics related to welding, quality control, and audits.
Types of welding techniques and how to calculate spot diameter
7QC tools and their application in quality control
4M analysis and types of changes in welding processes
Symbols used in welding and their meanings
MSA and PPAP in quality control
Types of audits and their purpose
Dock audit and its significance
OHSAS stands for Occupational Health and Safety Assessment Series.
OHSAS is a set of international standards for occupational health and safety management systems.
It provides a framework for organizations to manage and improve their occupational health and safety performance.
OHSAS 18001 is the most widely used standard in the series.
It has been replaced by ISO 45001, which is the new international standard for occupatio...
I was interviewed in Dec 2021.
The least count of a vernier is the smallest measurement that can be read on the scale.
The least count is determined by the number of divisions on the vernier scale and the main scale.
It is calculated by dividing the smallest division on the main scale by the number of divisions on the vernier scale.
For example, if the smallest division on the main scale is 1 mm and there are 10 divisions on the vernier scale, the leas...
Top trending discussions
I applied via Company Website and was interviewed before Jun 2019. There was 1 interview round.
Some of the top questions asked at the Victora Tool Engineers interview -
based on 19 interviews
Interview experience
based on 295 reviews
Rating in categories
Quality Engineer
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
56
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
55
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
35
salaries
| ₹0 L/yr - ₹0 L/yr |
BHEL
TCS
Larsen & Toubro Limited
Mahindra & Mahindra