Filter interviews by
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. PPE stands for Personal Protective Equipment.
5S is a method for organizing a workplace to improve efficiency and safety
PPE includes items like gloves, helmets, goggles, and masks to protect workers from hazards
Examples of 5S include organizing tools, labeling storage areas, and maintaining cleanl...
Thermodynamics is the branch of physics that deals with the relationships between heat, work, and energy.
Thermodynamics studies the transfer of energy in the form of heat and work.
It involves concepts like entropy, temperature, and energy conservation.
Examples include the efficiency of engines, refrigeration systems, and phase transitions.
Top trending discussions
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
The 7 QC tools are a set of basic statistical tools used for quality control and improvement in manufacturing and service industries.
Check sheet: Used to collect and organize data in a systematic way.
Histogram: Represents data distribution visually.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagram (Ishikawa or fishbone diagram): Identifies potential causes of a...
5S is a methodology used to organize a workplace for efficiency and effectiveness by identifying, sorting, setting in order, shining, and sustaining.
Sort: Remove unnecessary items from the workplace
Set in order: Organize remaining items in a logical manner
Shine: Clean and inspect the workplace regularly
Standardize: Establish procedures and schedules for maintaining the first 3 S's
Sustain: Ensure the practices are consi...
4M is a method used in quality management to identify and address potential issues in a process.
4M stands for Man, Machine, Material, and Method.
It is used to analyze and improve processes by considering the impact of these four factors.
For example, in manufacturing, 4M can help identify if a quality issue is due to human error, machine malfunction, material defects, or the method of production.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance involving all employees to improve equipment effectiveness.
TPM focuses on maximizing equipment effectiveness through proactive maintenance
The pillars of TPM include autonomous maintenance, planned maintenance, quality maintenance, focused improvement, early equipment management, and training & education
Example: Implementing autonomous main...
JH stands for Job Hazard Analysis, a process used to identify and mitigate potential hazards in the workplace.
JH is a systematic process for identifying potential hazards in a job task or process.
It involves breaking down the job into steps, identifying potential hazards at each step, and implementing controls to mitigate those hazards.
Examples of hazards that may be identified through JH include exposure to harmful ch...
I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.
posted on 15 Oct 2022
I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 23 Feb 2022
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
An engine is a machine that converts fuel into motion. A boiler is a closed vessel that heats water to produce steam.
An engine is a mechanical device that converts fuel into motion
Boiler is a closed vessel that heats water to produce steam
Boilers are used in power plants, heating systems, and industrial processes
Boiler specifications include capacity, pressure, temperature, and fuel type
Examples of fuel types include n
I applied via Referral and was interviewed in Jun 2022. There were 2 interview rounds.
They conduct safety class and ask questions from that.
based on 1 interview
Interview experience
Quality Engineer
129
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Engineer
56
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Production Engineer
55
salaries
| ₹2 L/yr - ₹4.3 L/yr |
Senior Engineer
42
salaries
| ₹3.2 L/yr - ₹6.5 L/yr |
Assistant Manager
35
salaries
| ₹4 L/yr - ₹9.6 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti