Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.
Several types of documents need to be prepared for export dispatch.
Commercial Invoice
Packing List
Bill of Lading
Certificate of Origin
Insurance Certificate
Export License
Inspection Certificate
Proforma Invoice
BRC documentation procedures involve creating and maintaining records of food safety management systems.
BRC documentation should include policies, procedures, and records related to food safety management.
Documentation should be regularly reviewed and updated to ensure compliance with BRC standards.
Records should be kept for a minimum of two years and should be easily accessible for audits.
Examples of BRC documentation...
An entry against quality complaints can be posted by debiting the cost of goods sold account and crediting the inventory account.
Debit cost of goods sold account
Credit inventory account
Include details of the complaint in the entry
Ensure accuracy of the entry
I appeared for an interview in Oct 2024.
Hot,Hot piercing
And pilgare machine (pinion pcd of modules) manufacturer to ss pipe(yield)
Top trending discussions
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
posted on 11 Dec 2024
Coding questions based on core Java and DSA
I applied via Campus Placement and was interviewed in Dec 2024. There were 2 interview rounds.
Multiple Choice questions concerning Mechanical, Metallurgy departments
posted on 28 Aug 2022
I applied via Referral and was interviewed in Feb 2022. There were 3 interview rounds.
posted on 20 Jul 2023
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
DVC stands for Data Version Control and UTM stands for Universal Testing Machine.
DVC is a system for managing and versioning data sets for machine learning projects.
UTM is a machine used to perform tensile, compression, and bending tests on materials.
DVC helps track changes in data, code, and models in a project.
UTM measures the mechanical properties of materials such as strength, elasticity, and toughness.
The most important aspect in a lab is accuracy and precision in testing procedures.
Accuracy and precision in testing procedures ensure reliable results
Adherence to quality control measures is crucial
Proper calibration and maintenance of equipment is essential
Following standard operating procedures (SOPs) is key to consistency
Regular training and education for lab staff is important
posted on 24 Jun 2023
I applied via Campus Placement and was interviewed in Dec 2022. There were 3 interview rounds.
About electricity , calculation , electrical calculations ,
The output voltage in a 16 kV single phase transformer is 16 kV.
Output voltage in a 16 kV single phase transformer is 16 kV
The voltage remains constant in a single phase transformer
Output voltage is determined by the turns ratio of the transformer
Voltage ratings refer to the maximum voltage that a device or component can safely handle.
Voltage ratings are important for ensuring the safety and proper functioning of electrical equipment.
They are typically specified in volts (V) and can vary depending on the type of equipment.
Exceeding the voltage rating can lead to damage or failure of the device.
For example, a common voltage rating for household appliances is 120...
posted on 30 Mar 2023
I applied via Naukri.com and was interviewed in Sep 2022. There were 4 interview rounds.
The site where I quote tenders is called TenderQuotes.
TenderQuotes is a popular online platform for quoting tenders.
It provides a user-friendly interface for browsing and submitting quotes.
The site offers a wide range of tender opportunities from various industries.
Users can search for tenders based on their preferences and submit competitive quotes.
TenderQuotes also provides notifications and updates on new tender opp
When quoting tenders, it is important to consider various clauses and factors to ensure accuracy and competitiveness.
Review the tender documents thoroughly to understand the requirements and specifications
Consider the pricing strategy and competitive landscape
Evaluate the scope of work and resources required
Check for any special conditions or terms in the tender
Ensure compliance with legal and regulatory requirements
In...
based on 3 interviews
Interview experience
based on 28 reviews
Rating in categories
Engineer
7
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Electrical Engineer
6
salaries
| ₹2.2 L/yr - ₹4.1 L/yr |
Purchase Executive
5
salaries
| ₹2.8 L/yr - ₹4.6 L/yr |
Quaity Control Engineer
4
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Mechanical Maintenance Engineer
4
salaries
| ₹2 L/yr - ₹4.3 L/yr |
Jindal Group Of Companies
Ms Agarwal Foundries
Patton International
Shri Mahavir Ferro Alloys