i
Vcs Quality Services
Filter interviews by
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There was 1 interview round.
I applied via Campus Placement
I applied via Campus Placement and was interviewed before Apr 2021. There were 3 interview rounds.
Basic question of aptitude
I applied via Campus Placement and was interviewed before Jun 2022. There were 4 interview rounds.
Sectional aptitude test like the CAT exam: LRDI, VARC and Aptitude
Topic based group discussion between 8 to 10 people on varied topics.
I appeared for an interview in Sep 2024, where I was asked the following questions.
Starting and stopping a boiler feed pump requires careful procedures to ensure safety and efficiency.
Check the pump and system for any leaks or damage before starting.
Ensure that the boiler is at the correct pressure and temperature.
Open the isolation valves to allow water flow to the pump.
Start the pump using the control panel, monitoring for unusual noises.
Once the pump is running, check the pressure gauges to ensure...
Common vacuum pump failures include mechanical wear, seal leaks, and motor issues, often leading to performance loss.
Mechanical wear: Bearings and rotors can wear out over time, causing reduced efficiency.
Seal leaks: Damaged or worn seals can lead to loss of vacuum, impacting system performance.
Motor issues: Electrical failures or overheating can prevent the pump from operating correctly.
Contamination: Particles or flu...
Safe operation of a CEP involves careful start/stop procedures and understanding cavitation causes and prevention.
Start the CEP gradually to avoid sudden pressure changes.
Monitor system parameters like flow rate and pressure during startup.
Stop the CEP by gradually reducing the load to prevent water hammer.
Cavitation can occur due to low inlet pressure or high fluid velocity.
To avoid cavitation, ensure adequate NPSH (N...
In case of a blackout, immediate actions include assessing the situation, ensuring safety, and restoring power efficiently.
Assess the situation: Check if the blackout is localized or widespread.
Ensure safety: Activate emergency lighting and guide personnel to safe areas.
Notify relevant personnel: Inform management and maintenance teams about the blackout.
Check backup systems: Verify if backup generators are operational...
posted on 30 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 29 reviews
Rating in categories
Senior Engineer
91
salaries
| ₹3.8 L/yr - ₹7 L/yr |
Project Management Consultant
63
salaries
| ₹3.8 L/yr - ₹5.8 L/yr |
Inspection Engineer
30
salaries
| ₹2.5 L/yr - ₹9.5 L/yr |
Site Engineer
30
salaries
| ₹3.7 L/yr - ₹5.5 L/yr |
Planning Engineer
19
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Reliance Industries
Oil And Natural Gas Corporation
Sterling Oil Exploration & Energy Production
Kuwait National Petroleum Company