Filter interviews by
I applied via Referral and was interviewed in Feb 2021. There were 6 interview rounds.
MACE and IATF audits are related to quality management systems and automotive industry standards.
MACE stands for Manufacturing Assessment and Certification of Excellence, which is a quality management system audit.
IATF stands for International Automotive Task Force, which is a standard for quality management systems in the automotive industry.
MACE audit assesses the effectiveness of a company's quality management syste...
Top trending discussions
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
C++ ,Java , CAD , CNC programming, Data analytics
I applied via Referral and was interviewed in Nov 2024. There were 3 interview rounds.
A bug is a general term for any flaw or error in a software application, while a defect is a specific instance of a bug that causes a deviation from expected behavior.
Bug is a broader term encompassing all types of issues in software.
Defect is a specific instance of a bug that can be identified and fixed.
Example: Bug - Application crashes randomly. Defect - Button does not work as intended.
Example: Bug - Incorrect calc...
Agile is a project management methodology that emphasizes flexibility, collaboration, and iterative development.
Agile focuses on delivering value to customers through continuous collaboration and feedback.
It involves breaking down projects into smaller, manageable tasks called sprints.
Teams work in short iterations to adapt to changing requirements and deliver working software quickly.
Common Agile frameworks include Sc
SDLC stands for Software Development Life Cycle, a process used by software development teams to design, develop, and test high-quality software.
SDLC is a systematic process for building software applications.
It consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables.
Examples of SDLC models include Waterfall, Agi
Scenarios to test movie ticket booking app include user registration, movie selection, seat selection, payment processing, and booking confirmation.
User registration process
Movie selection and availability
Seat selection and seating arrangement
Payment processing and options
Booking confirmation and ticket generation
In 5 years, I see myself as a Senior Quality Engineer leading a team of quality professionals in a reputable company.
Continuing to enhance my skills and knowledge in quality engineering
Taking on more leadership responsibilities within the quality department
Contributing to the development and implementation of quality improvement initiatives
Building strong relationships with cross-functional teams to drive quality goals
...
I expect clear communication, challenging projects, opportunities for growth, and a supportive team environment.
Clear communication with team members and stakeholders
Challenging projects that allow me to utilize my skills and knowledge
Opportunities for professional growth and development
A supportive team environment that fosters collaboration and innovation
I applied via LinkedIn and was interviewed in Oct 2024. There were 2 interview rounds.
As a Quality Engineer in my current project, my roles and responsibilities include ensuring compliance with quality standards, conducting quality audits, analyzing data to identify areas for improvement, and implementing corrective actions.
Ensuring compliance with quality standards and regulations
Conducting quality audits to identify areas for improvement
Analyzing data to track quality metrics and trends
Implementing co...
Smoke testing is a quick test to check if the software build is stable, while sanity testing is a more thorough test to check specific functionalities.
Smoke testing is done to ensure the critical functionalities of the software are working fine after a build, while sanity testing is done to verify specific features or functionalities.
Smoke testing is usually done before detailed testing, while sanity testing is done af...
In bug triage meetings, I analyze reported bugs, prioritize them based on severity and impact, assign them to appropriate team members, and track their resolution.
Analyze reported bugs to understand the root cause and impact
Prioritize bugs based on severity and impact on users
Assign bugs to appropriate team members for resolution
Track the progress of bug resolution and ensure timely closure
Address conflicts by facilitating open communication, understanding both perspectives, and finding a mutually agreeable solution.
Encourage open communication between Dev and QA teams to understand each other's perspectives
Review the bug reports together to identify the root cause of the conflict
Facilitate discussions to reach a mutually agreeable solution, considering the impact on the project timeline and quality
Estab...
Seeking new challenges and growth opportunities
Desire for career advancement
Looking for a more challenging role
Seeking opportunities for professional development
Company restructuring or downsizing
Relocation to a new area
I have experience in implementing lean manufacturing principles in a previous role.
Implemented 5S methodology to improve organization and efficiency in the workplace
Led Kaizen events to identify and eliminate waste in production processes
Trained team members on lean principles and continuous improvement techniques
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
Hydraulic systems and hydraulic machines.
BS6 emissions standards are more stringent than BS4, with lower limits on emissions of pollutants like nitrogen oxides and particulate matter.
BS6 standards have stricter limits on emissions of pollutants like nitrogen oxides (NOx) and particulate matter (PM) compared to BS4.
BS6 compliant vehicles are required to have advanced emission control technologies like selective catalytic reduction (SCR) and diesel particulate ...
An electric motor converts electrical energy into mechanical energy to produce motion, while an electric generator converts mechanical energy into electrical energy.
Electric motor converts electrical energy into mechanical energy
Electric generator converts mechanical energy into electrical energy
Electric motor is used in appliances like fans, washing machines
Electric generator is used in power plants to generate electr
Four stroke engines have separate intake, compression, power, and exhaust strokes, while two stroke engines combine intake and compression in one stroke and power and exhaust in another.
Four stroke engines have a dedicated stroke for each of the four processes: intake, compression, power, and exhaust
Two stroke engines combine intake and compression in one stroke and power and exhaust in another
Four stroke engines are m...
I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.
Program to count consecutive characters in a string
Iterate through the string and compare each character with the next one
Maintain a count for each character and append to the output string when a different character is encountered
Example: input 'aabbccc' -> output 'a2b2c3'
Dynamic xpath is a way to locate elements on a web page based on changing attributes or positions.
Use functions like contains(), starts-with(), or ends-with() to create dynamic xpaths
Avoid using indexes in xpaths as they can change with page updates
Consider using unique attributes or text within the element to create a reliable xpath
PUT is used to update or replace an entire resource, while PATCH is used to update specific fields of a resource.
PUT is idempotent, meaning multiple identical requests will have the same effect as a single request.
PATCH is not necessarily idempotent, as multiple identical requests may have different effects.
PUT requires the client to send the entire updated resource, while PATCH only requires the client to send the spe
I applied via Job Fair and was interviewed in Sep 2024. There was 1 interview round.
The annual child birth ratio of an average Indian is approximately 2.3 children per woman.
The total fertility rate in India is around 2.3 children per woman.
This rate varies across different states and regions in India.
Factors such as education, socio-economic status, and cultural norms influence the fertility rate.
For example, states like Bihar and Uttar Pradesh have higher fertility rates compared to Kerala and Tamil
During a crisis, general concepts to apply include effective communication, quick decision-making, adaptability, and teamwork.
Effective communication is crucial to keep all stakeholders informed and aligned.
Quick decision-making is necessary to address the crisis promptly and minimize its impact.
Adaptability is key to adjusting strategies and plans as the situation evolves.
Teamwork is essential for pooling resources an
Employers typically renew contracts before the notice period.
Employers usually renew contracts before the notice period to ensure continuity in the work relationship.
Renewing the contract before the notice period allows both parties to plan ahead and make necessary arrangements.
In some cases, employers may choose to renew the contract during the notice period if negotiations are ongoing.
It is important for employers to...
Basics maths and reasoning
Print the webtable and gett all the data
Reasoning , mathematics
Behaviour refers to the way in which a person or animal acts or conducts themselves in response to a particular situation or stimulus.
Behaviour is influenced by genetics, environment, and past experiences.
It can be observed and measured through actions, reactions, and responses.
Behaviour can be categorized as either innate (instinctual) or learned.
Examples of behaviour include aggression, shyness, curiosity, and friend
The best method in power transfers is through high voltage transmission lines.
High voltage transmission lines are more efficient in transferring power over long distances.
Using transformers to step up the voltage before transmission and step down the voltage at the receiving end helps minimize power loss.
HVDC (High Voltage Direct Current) transmission is another efficient method for long distance power transfers.
Smart ...
Current is the flow of electric charge through a conductor.
Current is measured in Amperes (A)
It is the rate of flow of electric charge
Current can be either direct current (DC) or alternating current (AC)
Examples: A light bulb connected to a power source has current flowing through it
In a circuit, current flows from the positive terminal of the voltage source to the negative terminal
Methods to convert inverter include pulse width modulation, sine wave modulation, and square wave modulation.
Pulse width modulation (PWM) is a common method used to convert inverter signals by varying the width of the pulses.
Sine wave modulation involves generating a sine wave signal to mimic the output of an inverter.
Square wave modulation produces a square wave output by switching between high and low voltage levels.
...
Executive Accountant
7
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Senior Quality Engineer
7
salaries
| ₹3.5 L/yr - ₹5.4 L/yr |
Quality Engineer
6
salaries
| ₹3.2 L/yr - ₹3.9 L/yr |
Assistant Manager
4
salaries
| ₹5.3 L/yr - ₹6.5 L/yr |
Senior Engineer
4
salaries
| ₹3 L/yr - ₹8 L/yr |
Maruti Suzuki
Tata Motors
Mahindra & Mahindra
Hero MotoCorp