Filter interviews by
I applied via Company Website and was interviewed in Dec 2020. There were 4 interview rounds.
kVA and kW are both units of power, but they measure different aspects of electrical systems.
kVA stands for kilovolt-ampere and represents the apparent power in an electrical system.
kW stands for kilowatt and represents the real power in an electrical system.
kVA includes both the real power (kW) and the reactive power (kVAR) in an electrical system.
kW is the actual power consumed or produced by the electrical equipment...
The direction and degree of solar panels depend on the location and the desired energy output.
Solar panels should ideally face south in the northern hemisphere and north in the southern hemisphere.
The degree of tilt depends on the latitude of the location.
In general, the tilt angle should be equal to the latitude of the location for maximum energy production.
Adjustments may be made based on specific factors such as sha
Top trending discussions
Types of cement include Portland cement, rapid hardening cement, and white cement. Tests on cement include fineness test, soundness test, and compressive strength test.
Types of cement: Portland cement, rapid hardening cement, white cement
Tests on cement: fineness test, soundness test, compressive strength test
Example: Portland cement is commonly used in construction for its versatility and durability
I applied via Recruitment Consultant and was interviewed in Jan 2021. There was 1 interview round.
posted on 16 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
Service Engineer
63
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Sales Coordinator
53
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Quality Engineer
52
salaries
| ₹1.6 L/yr - ₹3.8 L/yr |
Test Engineer
50
salaries
| ₹1.1 L/yr - ₹3.5 L/yr |
Area Sales Manager
38
salaries
| ₹2.5 L/yr - ₹6.7 L/yr |
Tata Power
Adani Power
Reliance Power
NTPC